| 1 | Excavation of earthwork in foundation in hard soil within all lead, lift including rough dressing and levelling the bed and depositing the excavated materials within all leads from the work site including sundries, T&P required for the work etc complete as per specification and direction of Engineer-in-Charge. |
| 2 | Filling foundation and plinth with sand of approved quality with all leads, lifts, delifts, well watered and rammed including cost, conveyance, royalty cess& all taxes of all materials T&P etc. complete as per specification and direction of Engineer-in-Charge. |
| 3 | Cement concrete M15 with20mm down graded size hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per specification and direction of Engineer-in-Charge. |
| 4 | Rigid smooth centering & shuttering for C.C. work including false work and dismentaling them after casting including cost & conveyance of materials complete as per drawing & specification with all leads, lifts, sundries and T&P etc. complete as per specification and direction of Engineer-in-Charge. |
| 5 | R.C.C. M20 with hard granite chips crusher broken 20mm size including hosting mixing concrete and laying in proper layers/place free as per approved drawing and the specification,watering for curing for specified period,T&P sundries including cost, conveyance, royalty and taxes of all materials with all leads,lifts,delifts etc. complete as per specification and direction of Engineer-in-Charge. |
| 6 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royalty of all materials to site, T&P sundries, etc. complete as per specification and direction of Engineer-in-Charge. |
| 7 | Filling foundation and plinth with excavated materials with all leads, lifts and delifts including watering, ramming with all leads, lifts, sundries and T&P etc.complete as per specification and direction of Engineer-in-Charge. |
| 8 | Earth work in hard soil including rough dressing and breaking the clods to maximum 5.c.m to 7c.m and laying in layers not exceeding 0.30m. With no extra lead and lift over initial lift includind sundries, T&P required for the work etc complete as per specification and direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |