| 1 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Undersluice Gates of Mahanadi Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 2 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Spillway Gates of Mahanadi Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 3 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Head Regulator Gates of Mahanadi Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 4 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of the above spares of 2 no Gantry Crane of Mahanadi Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 5 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of the above spares of 2 no Monorail Crane of Kendrapada canal and Taladanda Canal after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 6 | Supplying and fixing of 10mm Dia MS tested Galvanised Chain to rope drum and central drive unit covers of Mahanadi Barrage gates including cost of materials,conveyance,T&P, scaffolding, labour etc complete but excluding GST as per direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |