| 1 | Single under reamed 300mm dia 4 m long Pile foundation with RCC M-20 using 12mm size HGCB stone chips including cost of boring but excluding cost of MS/Tor steel and labour charges for cutting, bending and binding of steel. |
| 2 | Earth work in hard soil or gravelly soil within 50 mtr initial lead and 1.50 mtr intial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. |
| 3 | Conveyance of excavated earth and dismantaled materials away from work site by mechanical means with 5KM lead etc. complete/cum. |
| 4 | Filling in foundation and plinth with Sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, T&P etc. all complete/cum. |
| 5 | Plain Cement Concrete (1:3:6) with 40mm size Crusher broken hard granitige metal including all cost of materials, labour, conveyance, royalty, T & P water for curing etc. all |
| 6 | Cement Concrete (1:2:4) 12mm size Crusher broken hard granitge Chips including all cost of materials, labour, conveyance, royalty, T & P water for curing etc. all complete/cum. |
| 7 | Fly ash bricks 25cmx12cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance 12 percent in cement mortar (1:6) in foundation and plinth including all etc. complete in F & P/cum. |
| 8 | 2.5 cm Damp Proof Course (DPC) with CC (1:2:4) using 12mm size Crusher broken granite chips per 1 sqm |
| 9 | Fly ash bricks 25cmx12cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in super structure including all etc. |
| 10 | RCC work of M-20 grade with 20mm and down grade Crusher broken hard granite chips including hoisting and laying all cost of materials, labour, conveyance, royalty, T & P water items of work/cum. for curing etc. all complete as per OPWD specification required for the work to finished |
| 11 | Requirement of HYSD/ MS Rod and labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod and binding wire 18 to 20 Raure/Qtl |
| 12 | Rigid and smooth centring and shuttering for CC/RCC works including false works and dismantling them after casting including cost of materials complete in ground floor.(i) RCC foundation, plinth band and footing bases of columns mass concrete pre-cast slabs etc. |
| 13 | (ii) RCC Lintel |
| 14 | III) RCC Beam, column, girder and bressmer etc. |
| 15 | (iv) RCC floor and roof slab, landing, balconies, projecting sun shades and chajjas up to 4.3 mtr height. |
| 16 | 12mm thick cement plaster (1:6) over brick work including all cost, conveyance, royalty etc. |
| 17 | 16mm thick cement plaster (1:6) over brick work including all cost, conveyance, royalty etc. |
| 18 | 6mm thick cement plaster (1:4) to RCC surfaces finished smooth Including closed deep chipping and slury treatment etc, complete/sqm |
| 19 | 20mm thick Grading Concrete (1:2:2) on roof slab with 6mm size Crusher hard granite chips on new work per 1 Sqm. (See Page No. 47, Item No. 17 of AoR-06) |
| 20 | Supplying, fitting and fixing vitrified tile in floor of size 600mm x 600mm of approved make on 20mm thick cement mortar (1:4) and filing joints with white cement including cost of all cost, T&P etc. all complete as per direction of EIC/sqm. |
| 21 | Fixing the Ceramic Tiles in Dados skirting risers of on 12 mm thick cement mortar (1:3) and cost of all cost, T & Petc. all comp. as per direction of EIC/sqm |
| 22 | Providing fitting and fixing of fabricated Doors and Windows with angle iron frame and grills of approved design including cost, conveyance and taxes of all materials and labour etc. complete. |
| 23 | Priming 1 Coat with water based wall primer torecieve Paint etc. complete |
| 24 | Wall painting 2 coats with Plastic Emulsion paint for approved shade on new work to given an even shade including cost of paint per 1 Sqm |
| 25 | providing two coats with any approved colour weather coat to out side surface of wall over a coat of primer of approved shade and quality etc. including all cost, complete. |
| 26 | Painting two coats with approved Paint and Primer including cost of labour and materials etc. all complete. |
| 27 | Ad for Electricfication as per actual voucher |
| 28 | Provision for Signboard Please Enable Macros to View BoQ information |