| 1 | Bushes cleaning & Providing paverbock in backside of the trainees hostel atCIBA Hqrs |
| 2 | Surface dressing of the ground including removingvegetation and in-equalities not exceeding 15 cmdeep and disposal of rubbish, lead up to 50 m andlift up to 1.5 m. |
| 3 | Earth work in excavation/ surface excavation bymechanical means (Hydraulic excavator)/ manualmeans over areas (exceeding 20 cm in depth, 1.5m in width as well as 10 sqm on plan) includingdressing of sides and ramming of bottoms,including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-incharge |
| 4 | Providing and laying in position cement concreteof specified grade excluding the cost of centeringand shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III) derivedfrom natural sources : 10 graded stone aggregate40 mm nominal size derived from natural sources |
| 5 | Steel reinforcement for R.C.C. work includingstraightening, cutting, bending, placing in positionand binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe500D or more. |
| 6 | Providing and laying in position specified grade ofreinforced cement concrete, excluding the cost ofcentering, shuttering, finishing and reinforcementAll work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources : 3 graded stoneaggregate 20 mm nominal size derived fromnatural sources) |
| 7 | Centering and shuttering including strutting,propping etc. and removal of form for Foundations, footings, bases of columns, etc. formass concrete |
| 8 | Brick work with common burnt clay machinemoulded perforated bricks of class designation12.5 conforming to IS: 2222 in superstructureabove plinth level up to floor five level in cementmortar 1:6 (1 cement : 6 coarse sand) :With F.P.S.(non modular) bricks |
| 9 | 20 mm cement plaster of mix :1:6 (1 cement: 6fine sand) |
| 10 | Supplying and filling in plinth with quarry dustunder floors including, watering, rammingconsolidating and dressing complete. |
| 11 | Providing and laying factory made chamferededge Cement Concrete paver blocks in footpath,parks, lawns, drive ways or light traffic parking etc,of required strength, thickness & size/ shape,made by table vibratory method using PU mould,laid in required colour & pattern over 50mm thickcompacted bed of sand, compacting and properembedding/laying of inter locking paver blocksinto the sand bedding layer through vibratorycompaction by using plate vibrator, filling thejoints with sand and cutting of paver blocks as perrequired size and pattern, finishing and sweepingextra sand. complete all as per direction ofEngineer-in-Charge.60mm thick cement concretepaver block of M-35 grade with approved colour,design & pattern. |
| 12 | Extra for preparation and consolidation/compaction of sub grade/ Earth with VibratingPlate Compactor of 8 to 10 tonne capacity in theavailable excavated area dressing to camber andconsolidating/ compacting with Vibrating PlateCompactor including making good the undulationsetc. and re-compacting the sub grade and disposalof surplus earth with lead upto 50 metres etc. allcomplete as per the direction of engieer incharge. (100 sqm area shall be compactedminimum of 2 hour after preparation of desiredsub grade surface) Compaction over Sub grade |
| 13 | xtra for Compaction on sand filling/ GSB/WMM/PCC/ RCC surface while laying with Vibrating PlateCompactor of required capacity including makinggood the undulations etc. and re-compacting thesurfaces etc. all complete as per the direction ofengieer in charge. Compaction over sand filling |
| 14 | Disposal of building rubbish / malba / similarunserviceable, dismantled or waste materials bymechanical means, including loading,transporting, unloading to approved municipaldumping ground or as approved by Engineer-incharge, beyond 50 m initial lead, for all leadsincluding all lifts involved. |
| 15 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. All kinds of soil. |
| 16 | Extra for Compaction on sand filling while layingwith Vibrating Plate Compactor of requiredcapacity including making good the undulationsetc. and re-compacting the surfaces etc. allcomplete as per the direction of engieer incharge. |
| 17 | Providing, laying, spreading and compactinggraded stone aggregate (size range 53 mm to0.075 mm ) to wet mix macadam (WMM)specification including mixing the material withwater at OMC in for all leads & lifts, laying inuniform layers with mechanical paverfinisher insub- base / base course on well prepared surfaceand compacting with vibratory roller of 8 to 10tonne capacity to achievethe desired density,complete as per specifications and directions ofEngineer-in-Charge. |
| 18 | Shifting of the existing water pipeline withnecessary pipe fittings, rerouting of the electricalcable line with proper provision of duct pipes (8\\"diameter or above), and carrying out othermiscellaneous works identified during the site inspection. Please Enable Macros to View BoQ information |