| 1 | Reapir to leaking joint of 100 mm bore CI/GI pipe line in trenches, opening the leaking joint by opening CI/ DI fitting, providing lead/ rubber tighten joint, testing of repaired joint, returning, filling in to make good the disturbed surface to match with the existing one complete all as specified and as directed. Note: (a) Earth work, DI pipe, CI/ DI fittings, lead wool and rubber tighten joint as requires at site shall be paid seperately under respective item of of BOQ. (b) Pig lead retrived during opening of joint shall be used for lead joints. However, additional lead if required shall be used for lead joints, however, additional lead, if required shall also be measured and paid separetly under respective item of BOQ as supply only. |
| 2 | All as per above Sr Item No. 1 here-in-before but 150 mm pipe bore. |
| 3 | All as per above Sr Item No. 1 here-in-before but 200 mm pipe bore. |
| 4 | All as per above Sr Item No. 1 here-in-before but 300 mm pipe bore. |
| 5 | Supply only lead pig/ lead wool all as specified and directed. |
| 6 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation etc or for laying pipe lines and getting out as in hard/dense soil complete all as specified and directed. |
| 7 | Returning filling in including spreading leveling, watering and well ramming in layer not exceeding 25 cm in hard/dense soil, complete all as specified and directed. |
| 8 | Removing excavated material to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. |
| 9 | S& F in replacement mild steel clamp suitable for 100 mm bore pipe made from 25 X 3 mm flat iron including 20 mm socket welded in clamp complete all as specified and directed |
| 10 | S& F in replacement mild steel clamp suitable for 150 mm bore pipe made from 25 X 3 mm flat iron including 20 mm socket welded in clamp complete all as specified and directed |
| 11 | S& F in replacement mild steel clamp suitable for 200 mm bore pipe made from 25 X 3 mm flat iron including 20 mm socket welded in clamp complete all as specified and directed |
| 12 | Taking up CI/ GI pipe 100 mm bore removing from site ( including all fittings) with spigot & socket ends and lead joints including burning out joints and recovering lead complete all as specified and directed |
| 13 | All as per item Sr No. 12 but 150 mm size |
| 14 | All as per item Sr No. 12 but 200 mm size |
| 15 | All as per item Sr No. 12 but 250 mm size |
| 16 | Supply, laying, jointing and testing of ductile iron pressure pipe with socket & spigot ends having ISI stamping marking confirming to IS:8329/2000 in standard length of 5.50 - 6.00 meter of classification K-7 suitable for and including push on rubber tyton (gasket D-jointing) with cement mortar lining in the pipes having 100 mm bore, including aligning the pipes inside trench as per IS:12288/1987 and testing the joints with required water pressure complete all as specified & directed. Note: (i) Excavation earth works shall be measured and paid for separately. (iii) CI/DI specials shall be measured and paid for separately. |
| 17 | All as per item Sr No. 16 but 150 mm bore |
| 18 | All as per item Sr. No. 16 but 200 mm bore |
| 19 | All as per item Sr. No. 16 but 250 mm bore |
| 20 | S & F DI pipe fittings such as bends, tapers, tee pieces single branch, \\"Y\\" junction, collars, caps and plugs etc spigot socketed or flanged ends type of size upto 300 mm nominal bore including push on rubber tyton joint conforming to IS-9520/2000 with pressure rating PN-1 (all the fittings shall be coated for rust prevention i.e. external coating zinc rich paint with finishing layer of bituminous as per Annexure - A of IS:9523/2000 and internal lining shall be of cement mortar with seal coat as per Annexure 'B' of IS-9523/2000) complete all as specified and directed. |
| 21 | Cutting to existing CI/DI pipe line of size 100 mm dia required for repair/ replacement of pipe line and insertation of collars/ tail pieces, tee etc including dewatering of pit if any complete all as specified and directed . Note :- Excavation and earth work if any shall be measured and paid seperately |
| 22 | All as per item Sr. No. 23 but size 150 to 300 mm |
| 23 | S&F in replacement of cast iron non rising sluice valve, SS spindle 80 mm bore flanged ends PN 1.6, ISI marked as per IS 14846/ 2000 and CI operating wheel including gasket, nut , bolts washer complete including taking down exisiting all as specified and directed. |
| 24 | All as per Item Sr. No. 23 but 100 mm bore |
| 25 | All as per Item Sr. No. 23 but 150 mm bore |
| 26 | Taking up/down steel water tubing 20 mm bore including cleaning for refixing or removal to store complete all as specified and as directed. |
| 27 | All as per item srl No. 26 here-in-before but GI pipe 25 mm bore. |
| 28 | All as per item srl No. 26 here-in-before but GI pipe 40 mm bore. |
| 29 | All as per item srl No. 26 here-in-before but GI pipe 50 mm bore. |
| 30 | All as per item srl No. 26 here-in-before but GI pipe 80 mm bore. |
| 31 | Supply & Fix in repair/ replacementing 20 mm bore galvanised steel tubing medium grade, ISI marked including necessary fittingslaid in trenches complete all as specified and as directed. |
| 32 | All as per item srl No. 31 here-in-before but GI pipe 25 mm bore. |
| 33 | All as per item srl No. 31 here-in-before but GI pipe 40 mm bore. |
| 34 | All as per item srl No. 31 here-in-before but GI pipe 50 mm bore. |
| 35 | All as per item srl No. 31 here-in-before but GI pipe 80 mm bore. |
| 36 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for including disposal of unserviceable material complete all as specified and as directed. |
| 37 | M& L for Cutting of road for laying of ductile/galvanised iron pipe line upto 1.2 Mtr depth, 0.6 Mtr width and getting out including forming bottom surface to reqired level or slope complete all as directed. |
| 38 | M & L for PCC 1:3:6 type C-1 using 20mm graded stone aggregate for to support the pipe line etc, including necessary form work complete all as specified and directed. |
| 39 | Supply and fix DI mechanical joint collar of size 80 mm for repair of DI/ CI pipe line all as specified and directed. |
| 40 | Supply and fix DI mechanical joint collar of size 100 mm for repair of DI/ CI pipe line all as specified and directed |
| 41 | Supply and fix DI mechanical joint collar of size 150 mm for repair of DI/ CI pipe line all as specified and directed |
| 42 | Supply and fix DI mechanical joint collar of size 200 mm for repair of DI/ CI pipe line all as specified and directed |
| 43 | Supply and fix DI mechanical joint collar of size 250 mm for repair of DI/ CI pipe line all as specified and directed Supply and laying river bed fine sand in trenches/ ducts 15 cm under cable and 8 cm above the cable for cushioning / protection to cable including spreading, levelling and get thick 18cm after hand punning complete all as specified and directed at site. Please Enable Macros to View BoQ information |