|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. |
| 2 | Removal of damaged PVC Pipes with unhygenic material including disposal of unserviceable material complete job |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Providing and laying of stone soling duly hand packed with horizontal level incluindg carriage |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp: 250 mm |
| 9 | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp: 100mm |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 11 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 12 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 13 | Raising of polycare material with cemnet concrete including rings lids and all requirement at site complete(A) Polycrate |
| 14 | (B) Trush Lid |
| 15 | Carriage of material by mechanical means: Sand |
| 16 | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. Please Enable Macros to View BoQ information |