| 1 | 11 KV Line (OH) |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | ACSR Rabbit Conductor |
| 4 | 11 KV Polymer Pin Insulator with Pin & Nut. |
| 5 | 11 KV Polymer Disc Insulator |
| 6 | 11 KV Polymer Disc fitting |
| 7 | T-off /Brackect Channel with holding Clamp |
| 8 | 11 KV V - Type X-arm with clamp for PCC |
| 9 | X-arm Holdinfg clamp |
| 10 | F- Bracket with bolt & nuts |
| 11 | Earthing complete |
| 12 | Concreting of pole |
| 13 | STONE PAD |
| 14 | Stay-set complete |
| 15 | Grouting of Stay with materials. |
| 16 | Bolts and Nuts |
| 17 | Guarding angle with Clamp |
| 18 | G.I. Wire 8 SWG ( 8 & 10 SWG ) |
| 19 | Tree Cutting for road side |
| 20 | I-Bolt / Hook For Gaurdning |
| 21 | Extra For Stay At Angle Location |
| 22 | Extra For Stay At Road Location (Corssing) |
| 23 | Danger Board With Nut & Bolt |
| 24 | Bracing Set Angle 65X65X6mm |
| 25 | 11 KV Line ( UG ) with 36 Nos Road Crossing |
| 26 | 11 KV XLPE 3X185 SQ.MM ( In Double Ckt) |
| 27 | O/D Jointing Kit Suitable for 11 KV 3x185 sq.mm XLPE Cable |
| 28 | 11 KV Straight Through Straight Through 3x185 sqmm |
| 29 | GI Pipe 6\\" Dia |
| 30 | 11 Mtr PCC Pole |
| 31 | M S Channel 100x50 mm 2400 mm Long |
| 32 | Top Channel 125x65 mm, 3200 mm long |
| 33 | Stone Pad |
| 34 | 11 KV Disc Insulator B&S Polymeric Type |
| 35 | 11 KV Disc Fitting for drop B&S type |
| 36 | Polymeric 11 KV Pin Insulator |
| 37 | PG Clamp Dog to Dog |
| 38 | Number Plate with clamp and Nut & Bolt |
| 39 | Danger Plate with clamp and Nut & Bolt |
| 40 | Barbered Wire |
| 41 | Nut Bolt and washer all sizes |
| 42 | Complete Stay 9GI Stay Rod 20x1800 mm, stay wire 7/8 SWG, 10 KG, Stay Clamp, Bolt, nut and washer with concrete grouting) |
| 43 | Concreting of Support (0.44 CuM) |
| 44 | Holding Clamp for GI Pipe |
| 45 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 46 | Holding Clamp for cable |
| 47 | Holding Clamp for Pole |
| 48 | Lug for ACSR Dog Conductor |
| 49 | DP & 11/0.440 KV/0.230 KV S/S ( 14 Nos ) |
| 50 | PCC Pole 8.5 Mtr. Long |
| 51 | 11 KV Polymer Pin Insulator with Pin & Nut. |
| 52 | 11 KV Polymer Disc Insulator |
| 53 | 11 KV Polymer Disc fitting. |
| 54 | T-off /Brackect Channel with holding Clamp |
| 55 | Top Channel |
| 56 | Dropper Channel |
| 57 | Sub Station Base Angle |
| 58 | Holding Clamp for PCC Pole 8.5 Mtr |
| 59 | Nut & Bolt ( Off Size ) |
| 60 | Concreting of Pole |
| 61 | STONE PAD |
| 62 | Stay Set Complete. |
| 63 | Concreting of Stay |
| 64 | Earthing complete |
| 65 | Danger Board with clamp |
| 66 | 11/0.230 KV 10 KVA TF |
| 67 | 11/0.230 KV 16 KVA TF |
| 68 | 11/0.44 KV 25 KVA TF |
| 69 | 11/0.44 KV 63 KVA TF |
| 70 | 11/0.44 KV 100 KVA TF |
| 71 | 11/0.44 KV 250 KVA TF |
| 72 | L.T. Line |
| 73 | PCC Pole 8.5 Mtr. Long |
| 74 | STONE PAD |
| 75 | A B Cable (3 x 120 sqmm) |
| 76 | A B Cable (3 x 95 sqmm) |
| 77 | A B Cable (3 x 50 sqmm) |
| 78 | A B Cable (1 x 25 sqmm) |
| 79 | Distribution box Single Phase with Clamp. |
| 80 | Distribution box 3 Phase with Clamp. |
| 81 | I-Hook with Clamp |
| 82 | Dead End Clamp |
| 83 | Suspention Clamp Insulated |
| 84 | J-Hook Clamp |
| 85 | PG Clamp |
| 86 | M.S. Bolt & Nut off size. |
| 87 | Stay Set Complete. |
| 88 | Concreting of Pole with materials. |
| 89 | Concreting of Stay with materials. |
| 90 | Earthing complete |
| 91 | Labour & Dismentaling Old Line & Cartage Charges @30% Of BOQ |
| 92 | Construction of Plinth with fencing |
| 93 | Tree Cutting for road side Please Enable Macros to View BoQ information |