| 1 | Loading, Carriage and safe unloading of PCC poles from store to work site or vice-versa. |
| 2 | Shifting of PCC Pole from Unloading Point to erction point |
| 3 | Erection of Single PCC Pole as per standard specification |
| 4 | Grouting of Pole with cement brick ballast and coarse sand as per standard specification including cost of materials. |
| 5 | Strengthening of damaged Old ST pole by welding With pipe or angle materials etc Related material will be provided by contractor. |
| 6 | Making of pole plinth of 400 mm dia, 400 mm height with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 7 | Supply & fixing of STONE PAD for PCC Pole as per site requirement as per standard specification |
| 8 | Loading, Carriage and unloading of AB CABLE from store to work site or vice-versa. |
| 9 | Laying of AB Cable (3x120+1x95+1x16) Sq.mm Including (All Fitting Accessories Providing & Fixing By Contractor M.S.Holding Clamp PCC, M.S. Holding Clamp 4.5\\"/ 5.5\\" 50x6 mm, Suspension Clamp With I Hook, Dead End With I Hook,Pericing Connector 120-120 mm, Neutral Connector,Dead End Seeling Cap,NUT Bolt With Double Washer.)As per Technical standard Approved by Kesco/ Uppcl. |
| 10 | Providing & Fixing of Single Phase Distribution Box With Clamp & Nut Bolt,Including All Fitting (Al.Lug 25 sqmm,Percieng Connector 120-25mm,Neutral Connector ) As per Technical standard Approved by Kesco/ Uppcl. |
| 11 | Providing & Fixing of Three Phase Distribution Box With Clamp & Nut Bolt,Including All Fitting (Al.Lug 25 sqmm,Percieng Connector 120-25mm,Neutral Connector)As per Technical standard Approved by Kesco/ Uppcl. |
| 12 | Loading, Carriage and unloading of 1X300/400SQMM XLPE CABLE from store to work site or vice-versa. |
| 13 | Laying of 1*300/400Sqmm L.T. Xlpe CABLE |
| 14 | Fixing & Connection of Tailless Unit/L.T. Circuit with all accessories( Al. Lug,400/120 sqmm,L.T. Bracket 36\\",M.S. Clamp, Nut Bolt & Washer As Per Site Requirment) All accessories will be provided by Contractor,.Execpeted Tailless Unit/L.T. Circuit. |
| 15 | Erection of Earthing Rod with proper connection of earthing wire (Lug Nut & Bolt , washer etc providig by contractor) as per standard specification |
| 16 | Erection of stay rod with stay wire with grouting of stay including providng & fitting all related Material (stay clamp , stay insulator & Nut Bolt & Washer etc. As Per Site Requirment by contractor )Execpeted stay rod & stay wire |
| 17 | Consumer Service Cable disconection & reconnection |
| 18 | Carriage of all concering material from Kesco Store to site or vice versa Please Enable Macros to View BoQ information |