| 1 | Supply of 2.0H.P. Submersible pump Compton greaves or I.S.I. Mark single phase including all charges etc. |
| 2 | Supply of 110mm dia P.V.C. pipe of approved quality I.S.I. Mark 6kg/ cm2 pressure including all charges etc. |
| 3 | Supply of 32 mm C.P.V.C. Pipe approved quality I.S.I. Mark. Including all charges etc. |
| 4 | Supply of Gate valve 32 mm. dia for control the pressure of water supply Including all charges etc. |
| 5 | Boring 0 to 150 mm. dia in ordinary soil from 0-112mtr. by sinking method. Including all charges etc. |
| 6 | 0 to 10 |
| 7 | 10 to 20 |
| 8 | 20 to 30 |
| 9 | 30 to 40 |
| 10 | 40 to 112 |
| 11 | P/F Plastic Jaly including making strainer in 140mm Dia P.V.C. Pipe including all charges etc. |
| 12 | Supply of 32 mm C.P.V.C. Pipe approved quality I.S.I. Mark. Including all charges etc. |
| 13 | S/O pea-gravel including all charges. |
| 14 | P/L 2.5 Cm. Thick P.C.C. floor in 1:2:4 cement mortar with 1:6:12 base C.C. including all charges |
| 15 | S/F of 1000 liter PVC water tank including all charges. |
| 16 | S/F of C.P. Bib cock including all charges etc. |
| 17 | E/work excavation in foundation in ordinary work lead up 30 mtr. and lift 1.50 mtr. including all charges etc. |
| 18 | Cement concrete in 1:5:10 cement sand and brick ballast in foundation with all material labour T & P etc. |
| 19 | M-150 B/w in 1:6 cement sand mortar in foundation with all labour material etc. |
| 20 | R.C.C. in 1:1.5:3 cement sand mortar material with all labour, material T&P |
| 21 | Providing with cutting & bending of M.S. iron tour steel bars for R.C.C. work including all charges etc. |
| 22 | 12 mm cement plaster of mix 1:4.As per secure 13.4.1. |
| 23 | P/L brick bats etc. complete. |
| 24 | P/L brick aggregate 40 mm nomoinal size etc. complete. |
| 25 | P/L Coarse sand including all charges. |
| 26 | Supply and fixing 75 mm dia. P.V.C pipe 6 kg / sq. m in water supply including all fitting charges. |
| 27 | S/F of Informatory Sign Board including all material and labour charges and writing & Painting in both side for proper completion of the work. |
| 28 | ADD GST 18 PERCENT Please Enable Macros to View BoQ information |