| 1 | Earth work in excavatin in foundation in odinary soil i/clift up to 1.5 mt and lead up to 50 mt and i/c filling, watering and ramming of excavated earth into the trenches or into the spece between thebuilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth etc all complete work. as per S.I. No. 251 |
| 2 | Earth work in embankment Bc soil in cutting or filling by cartage of earth from 5.00km by tractor tralley including ramming dressing, Compecting and watering complete |
| 3 | Stone dust filling in foundation in trenches as per tech. specification clause no.305.3.9 and MORD specification no 300&1200& as per data book item no 11.2 (1) |
| 4 | Concrete with 4 cm gauge Stone ballast , fine sand of 1.25 F M and cement in propotion of 12:6:1 in foundation under floors, including supply of all meterials, labour and T&p etc. required for proper completion of work. As per S.I. No. 273 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 6 | Supply adnd laying of Zig-Zag Rubble Moulded nterlocking concrete Block pavement having thikness 80mm all complete including all material, labour and T&P etc. |
| 7 | 1st class brick M-I50 in 1:4 cement & fine sand FM 1.25 mortar in foundation and plinth I/C cost of materials, labour and T&P required for proper completion of work. |
| 8 | 12 mm thick plaster with cement and fine sand FM 1.25 in 1:4 over brick work minimum thickness not to be less than 10 mm thick including all cost of material, labour allround. |
| 9 | Providing &Laying cement Concrete cc grade M-20 1:2:4 ( 1:2:4 cement ,c sand and stone grit ) cement concrete as per clause 802,803,1202,1203 1:2:4 as per Data Book Item No 11.4(III) |
| 10 | Providing &Laying cement Concrete cc grade M-25 1:1.5:3 in super structure ( 1:1.5:3 cement ,c sand and stone grit ) cement concrete as per clause 800,1205.5 1:1.5:3 as per Data Book Item No 13.1(II) |
| 11 | Supplying ,Fitting and Placing M.S. Bar Reinforcement in Foundation com. Tech. Specification 1000and 1202 Sr.No.11.9 |
| 12 | Supply of sign board./ Graynite Stone with Piller including all material, labour and T&P etc. Please Enable Macros to View BoQ information |