| 1 | Safe carriage of s.t./pcc pole from store center to site store with loading & unloading at both ends respectively distance within- 0 to 50 kms. |
| 2 | pcc poles 11 mtr. Long |
| 3 | pcc poles 8.5 mtr. Long |
| 4 | Loading, safe carriage & unloading of heavy stock material v type, disc insulator, pin insulator etc. From store center to site store with proper stacking of material, distance within-50 kms. |
| 5 | Loading, safe carriage & unloading of lt/ht cable, vcb & control panal tf etc from store center to site store with proper stacking of material, distance within-50kms. |
| 6 | 11 kv xlpe cable of 3x185 sq.mm. |
| 7 | 11 kv xlpe cable of 3x70 sq.mm. |
| 8 | Acsr dog conductor |
| 9 | Acsr rebbit conductor |
| 10 | Acsr weasel conductor |
| 11 | Lt abc 3*95 sq. Mm. |
| 12 | Lt lead 1*16 sq. Mm. |
| 13 | Erection of single pole st/pcc pole 11/ 33 kv fittings as per respo drawing top channal, dropper channal, x bracing set, disc insulator, pin insulator, guarding angle f bracket and etc as per direction of engineer incharge including the cost of labour, t&p and carrier etc. Required for proper completion of work. |
| 14 | pcc poles 11 mtr. Long |
| 15 | pcc poles 8.5 mtr. Long |
| 16 | Erection of double pole / saction pole of 11/33 kv fittings as per respo drawing top channal, dropper channal, x bracing set, disc insulator, pin insulator, guarding angle f bracket and etc as per direction of engineer incharge including the cost of labour, t&p and carrier etc. Required for proper completion of work. |
| 17 | pcc poles 11 mtr. Long |
| 18 | pcc poles 8.5 mtr. Long |
| 19 | Excavation of for each and grouting of single pole as per respo drawing and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone pad etc. As per actual site requirement |
| 20 | pcc poles 11 mtr. Long |
| 21 | pcc poles 8.5 mtr. Long |
| 22 | Excavation of for each and grouting of double pole/saction pole as per respo drawing and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone pad etc. As per actual site requirement |
| 23 | pcc poles 11 mtr. Long |
| 24 | pcc poles 8.5 mtr. Long |
| 25 | Loading, safe carriage & unloading of heavy stock material v type, disc insulator, pin insulator etc. From store center to site store with proper stacking of material from je store to pit site. |
| 26 | Loading, safe carriage & unloading of lt/ht cable, vcb & control panal, conductor tf etc from je store to pit site. |
| 27 | 11 kv xlpe cable of 3x185 sq.mm. |
| 28 | 11 kv xlpe cable of 3x70 sq.mm. |
| 29 | Acsr dog conductor |
| 30 | Acsr rebbit conductor |
| 31 | Acsr weasel conductor |
| 32 | Lt abc 3*95 sq. Mm. |
| 33 | Lt lead 1*16 sq. Mm. |
| 34 | Fixing of 11 kv stay set including nozelling etc. As per respo manual and also including the cost of all grouting material, labour, t&p etc required for proper completion of work. |
| 35 | Grouting of 11 kv stay set including nozelling etc. As per respo manual and also including the cost of all the support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone etc. As per actual site requirement , labour, t&p etc required for proper completion of work. |
| 36 | Restoration of pit after laying of cable loop |
| 37 | Restoration of kacha road after laying of cable. |
| 38 | Restoration of pakka road after laying of cable. |
| 39 | Fixing of earthing rod and wire as per respo manual and as per direction of supervising engineer including the cost of labour, t&p etc. Required for proper completion of work. |
| 40 | Fixing 11 kv cross arm. |
| 41 | Fixing 11 kv disc insulator. |
| 42 | Fixing 11 kv pin insulator. |
| 43 | Fabrication and cutting/drilling/welding of ms angle iron t-off channel etc. For making guarding angle of various size including the work of fixing the bracket on pcc/st pole for construction of the line. |
| 44 | Laying of 11 kv xlpe cable riser/overhead other size newly erected pole as per respo manual. |
| 45 | Laying of 11 kv xlpe 3x185 sq. Mm. Newly erected pole as per respo manual. |
| 46 | Laying sagging stringing and binding and jumpering etc of following acsr conductor/wisel/rabit/abc all size on the newly erected poles as per respo manual and as per direction of supervising engineer. It includes the cost of labour, t&p, carrier etc. Required for proper completion of work. |
| 47 | Acsr dog conductor |
| 48 | Acsr rebbit conductor |
| 49 | Acsr weasel conductor |
| 50 | Lt abc 3*95 sq. Mm. |
| 51 | Distribution box 3 phase complet |
| 52 | Making jumpers on section points, by fixing of proper sizes, suitable for acsr conductor. Sectional double/four pole. |
| 53 | Making/filling of 11 kv cable jointing kit 3*185 sq mm. Xlpe cable. |
| 54 | Making/filling of 11 kv cable jointing kit 3*70 sq mm. Xlpe cable. |
| 55 | The follwing material will be fixed by the contractor. |
| 56 | Distribution box 3 phase complet |
| 57 | Ms channel |
| 58 | Angle |
| 59 | Dead end clamp. |
| 60 | Suspension clamp |
| 61 | Pearcing connector. |
| 62 | J hook |
| 63 | F/side bracket |
| 64 | Clamp for 11 kv line |
| 65 | T-off chaneel |
| 66 | Nut & bolts. |
| 67 | F clamp for 11 kv line |
| 68 | The follwing material will be provided by the contractor. |
| 69 | Ms channel |
| 70 | Angle |
| 71 | Dead end clamp. |
| 72 | Suspension clamp |
| 73 | Pearcing connector. |
| 74 | J hook |
| 75 | F/side bracket |
| 76 | Clamp for 11 kv line |
| 77 | Nut & bolts. |
| 78 | F clamp for 11 kv line |
| 79 | Cartage & removal of old & used received back material from site to store centre/ j.e. store. |
| 80 | Weasel conductor scrap |
| 81 | X arm iron scrap |
| 82 | Abc scrap |
| 83 | 11 kv xlpe cable of 3x185 sq.mm. Please Enable Macros to View BoQ information |