Power Boards / Undertakings / PSU Closing in 3 days TDR #55847794

Tender For For The Work Related To Installation Of Tail Less Unit On Distribution Transformers Of Capacity More Than 100 Kva Under Electricity Distribution Division-Chinor And Shahjahanpur Under Mvvnl. Shahjahanpur.

Issued by Boards / Undertakings / PSU · Shahjahanpur, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Jul 2026
3 days left
EMD
69500
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Shahjahanpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for For The Work Related To Installation Of Tail Less Unit On Distribution Transformers Of Capacity More Than 100 Kva Under Electricity Distribution Division-Chinor And Shahjahanpur Under Mvvnl. Shahjahanpur.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 11-Jun-2026 tender no. 02 Date 15-Jun-2026
2 11-Jun-2026 tender no. 02 Date 15-Jun-2026
3 15-Jun-2026 TEN 02 Date 18-Jun-2026
4 18-Jun-2026 TEND 02 Date 22-Jun-2026
5 22-Jun-2026 02 tender Date 25-Jun-2026
6 15-Jun-2026 TEN 02 Date 18-Jun-2026
7 18-Jun-2026 TEND 02 Date 22-Jun-2026
8 25-Jun-2026 TENDER NO. 02 Date 29-Jun-2026
9 11-Jun-2026 tender no. 02 Date 15-Jun-2026
10 15-Jun-2026 TEN 02 Date 18-Jun-2026
11 18-Jun-2026 TEND 02 Date 22-Jun-2026
12 22-Jun-2026 02 tender Date 25-Jun-2026
13 25-Jun-2026 TENDER NO. 02 Date 29-Jun-2026
14 29-Jun-2026 ten no. 002 spn Date 06-Jul-2026
15 18-Jun-2026 TEND 02 Date 22-Jun-2026
16 22-Jun-2026 02 tender Date 25-Jun-2026
17 15-Jun-2026 TEN 02 Date 18-Jun-2026
18 11-Jun-2026 tender no. 02 Date 15-Jun-2026

BOQ

Name of Work:- For the work related to installation of tail less unit on distribution transformers of capacity more than 100 KVA under Electricity Distribution Division-chinor and shahjahanpur under MVVNL. Shahjahanpur.
Sl. No. Item Description
1EDD-CHINOUR
2Safe Carriage of Following materials from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.)
3PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF TRIPLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB)
4PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF DOUBLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB)
5PROVIDING AND INSTALLING OF COPPER BUS BAR 50*6 MM
6PROVIDING AND INSTALLING OF L PIECE COPPER 225*50*10 MM
7PROVIDING AND INSTALLING OF ALLUMINIUM LUGS 240/400/630 SQ MM
8PROVIDING AND INSTALLING OF FUSE WIRE (26 SWG)
9PROVIDING AND INSTALLING OF TAIL LESS UNIT STRUCTURE MADE OF MS CHANNEL 45*45*5 MM
10EDD-SHAHAJAHANPUR
11Safe Carriage of Following materials from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.)
12PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF SINGLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB)
13PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF TRIPLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB)
14PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF DOUBLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB)
15PROVIDING AND INSTALLING OF COPPER BUS BAR 50*6 MM
16PROVIDING AND INSTALLING OF ALLUMINIUM LUGS 240/400/630 SQ MM
17PROVIDING AND INSTALLING OF FUSE WIRE (26 SWG)
18PROVIDING AND INSTALLING OF TAIL LESS UNIT STRUCTURE MADE OF MS CHANNEL 45*45*5 MM Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55847794
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 06-07-2026
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Tender for For The Work Related To Installation Of Tail Less Unit On Distribution Transformers Of Capacity More Than 100 Kva Under Electricity Distribution Division-Chinor And Shahjahanpur Under Mvvnl. Shahjahanpur.
Basic Detail
Tender No 02(W)/EDCS/2026-27
Bidding Type Tender
Location
City Shahjahanpur
State Uttar Pradesh
Key Dates
Publish Date 29 Jun 2026
Submission Date 06 Jul 2026
Open Date 06 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee 3540
EMD 69500
Exemption Available
Document List
TENDERFORM_02_2026-2027.pdf
Tendernotice_1 (19).pdf
BOQ_2169040.xls
ead4c66a-e2fa-402b-ab16-b436dcbcb597.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 15, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 15, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 22, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 22, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 29, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 15, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 22, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 29, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 06, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Jun 22, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 15, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Jul 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
pdf

TENDERFORM_02_2026-2027.pdf

pdf

Tendernotice_1 (19).pdf

xls

BOQ_2169040.xls

html

ead4c66a-e2fa-402b-ab16-b436dcbcb597.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders