| 1 | Name of Work: Jhansi Vikas Pradhikaran ke Antargat Rajasv Gram BOODA Se Gram BEHTA tak 7.5 km Sadak Chaudikaran ka karya.Note :-(1)- GST Excluded on the aforesaid work. |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirment of table 300-2. As per Ref. to MoRTH Spec no-301+305. |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 6 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 7 | Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507. |
| 10 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (As per MORTH-6.01) |
| 11 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (As per MORTH-6.02) |
| 12 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 13 | Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 |
| 14 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (As per MORTH- 9.01-B) |
| 15 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. (As per MORTH- 9.02) |
| 16 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (As per MORTH- 9.03) |
| 17 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing. (As per MORTH-9.06- E- Case-II) |
| 18 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (As per MORTH-9.07) |
| 19 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20 using batching plant & manual placing. (As per MORTH- 9.06-B-case-II) |
| 20 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (As per MORTH- 9.04-A).For 1000 mm dia NP3 Hume Pipe |
| 21 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. (As per MORTH- 13.04-A) |
| 22 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. (As per MORTH-13.02) |
| 23 | Painting, Writing, Lettering etc. on NumberPlates on culverts including all materials, Labour, T&P etc. required for proper completion of work.(Lump Sum) |
| 24 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (As per MORT&H) SI- 15.01-B-(i) |
| 25 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. (As per MORT&H) SI- 15.03) |
| 26 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 using batching plant & manual placing. (As per MORT&H) SI- 15.11, A- Case-II) |
| 27 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 using batching plant transit mixer & manual placing. (As per MORT&H) SI- 15.11, E- Case-II) |
| 28 | Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications.RCC Grade M25 using batching plant transit mixer & Concrete pump. (As per MORT&H) SI- 15.12- B ) |
| 29 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (As per MORT&H) SI- 15.13) |
| 30 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (As per MORT&H) SI- 15.14) |
| 31 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. (As per MORT&H) SI- 15.15 - B-Case-II) |
| 32 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. (As per MORT&H) SI- 15.16) |
| 33 | Drainage Spouts complete as per drawing and Technical specification. (As per MORT&H) SI- 15.17) |
| 34 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (As per MORT&H-15.18) |
| 35 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. (As per MORT&H , SI- 15.23-A) |
| 36 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (As per MORT&H , SI- 16.01 A) |
| 37 | BOX CULVERT -PROTECTION-Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (As per MORT&H) SI- 15.01-B-(i) |
| 38 | Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (As per MORT&H , SI- 16.11) |
| 39 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. (As per MORT&H-15.10- A) |
| 40 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. (As per MORT&H-15.21) |
| 41 | Painting two coats after filling the surface with synthetic enamel paint bridge No. and span arrengment as per directed by engineer. (As per MORT&H-15.25) |
| 42 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. (As per MORT&H-15.22-iv) |
| 43 | BOX CULVERT - OLD STRUCTION DISMENTLING-Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (As per MORTH-2.04-iii) |
| 44 | BOX CULVERT - DIVERSION ROAD-Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (As per MORT&H - SI- 3.16) |
| 45 | Providing and laying NP4 Pipe of 1000 mm dia in Road diversion. (As per MORT&H - SI- 9.05 A) |
| 46 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (As per MORT&H - SI- 4.01-B) |
| 47 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc. Kilometer stone. |
| 48 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc. 5th Kilometer stone. |
| 49 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc. Hectometer Please Enable Macros to View BoQ information |