Tender For Work Involving The Installation Of Pipes Using The Jacking Process Within The Damaged Dot Nala-Spanning From 111/1 Harsh Nagar To 111/480 Harsh Nagar Ward 5 Jawahar Nagar And Ward 37 Ashok Nagar Under Zone 04., Kanpur-Uttar Pradesh
TDR : 55847761
Tender Notice
BOQ
3 Days Left
Kanpur
Uttar Pradesh
Tender For Work Involving The Installation Of Pipes Using The Jacking Process Within The Damaged Dot Nala-Spanning From 111/1 Harsh Nagar To 111/480 Harsh Nagar Ward 5 Jawahar Nagar And Ward 37 Ashok Nagar Under Zone 04.
Name of Work:- Work involving the installation of pipes using the jacking process within the damaged dot nala—spanning from 111/1 Harsh Nagar to 111/480 Harsh Nagar Ward 5 Jawahar Nagar and Ward 37 Ashok Nagar under Zone 04.
Sl. No.
Item Description
1
Installation of product pipe by Manual Pipe Jacking method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit after project completion as per the instructions of the Engineerin-Charge all complete except the cost of the pipe. (upto 60 meter installation length) above 1200 mm & upto 1500 mm dia in soft soil. 800 mm dia
2
Installation of product pipe by Manual Pipe Jacking method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit after project completion as per the instructions of the Engineerin-Charge all complete except the cost of the pipe. (upto 60 meter installation length) above 1200 mm & upto 1500 mm dia in soft soil. 1200 mm dia
3
Installation of product pipe by Manual Pipe Jacking method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit after project completion as per the instructions of the Engineerin-Charge all complete except the cost of the pipe. (upto 60 meter installation length) above 1200 mm & upto 1500 mm dia in soft soil. 1300 mm dia
4
Installation of product pipe by Manual Pipe Jacking method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit after project completion as per the instructions of the Engineerin-Charge all complete except the cost of the pipe. (upto 60 meter installation length) above 1200 mm & upto 1500 mm dia in soft soil.
5
Add 18 % G.S.T. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.