|
| 1 | Designing, providing, fixing, testing and commissioning of CHLORINE GAS DRY SCRUBBER FOR 100 KG CHLORINE GAS CYLINDER as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 NEW 1 |
| 2 | Designing, providing, fixing, testing and commissioning of VACUUM-OPERATED AUTOMATIC SWITCHOVER SYSTEM WITH ALTERNATE CHLORINATOR as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 NEW |
| 3 | Designing, providing, fixing, testing andcommissioning of ONLINE COLORIMETRIC WATERQUALITY ANALYZER FOR RESIDUAL CHLORINE ANDTURBIDITY including RTU-Cum-Gateway with Cellular (GSM,GPRS,4G/L TE,5G, NB-IoT), LoRa or other RF technology forremote data transfer as per technical specifications issued byHead Office, PHED, Haryana Memo No.-23070-23142 dated28-02-2024. NEW |
| 4 | Designing, providing, fixing, testing andcommissioning of AUTO-SHUT OFF VALVE as per technicalspecifications issued by Head Office, PHED, Haryana MemoNo.-23070-23142 dated 28-02-2024. |
| 5 | Designing, providing, fixing, testing andcommissioning of GASEOUS CHLORINATION SYSTEMhaving capacity upto 2000 grams/ hrs. as designed having thecontrol of gas upto 20th part of max. dose . The completesystem consists of (a) Vacuum regulator (b) Measuring GlassTube (c ) Ejector (d) PF tubing (e) Spanner with cylinderopening key (f) Ammonia Gas (Liquid for leaking test) (g) 1’dia PVC pipe with PVC fitting, ball valves etc. (h) 2 Nos.chlorine gas cylinder capacity 100 Kg. duly certified andapproved by BIS and Explosive Department Govt. of India (i)Electronic Chlorine gas leak detector with sensor and hooter(j) Full face mask with canister asper technical specifications issued by Head Office, PHED,Haryana Memo No.-23070- 23142 dated 28-02-2024. NEW |
| 6 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumablesincluding reagents of original make, SIM data cost, network and cloud storage etc for 1st year |
| 7 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumablesincluding reagents of original make, SIM data cost, network and cloud storage etc for 2nd year |
| 8 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumablesincluding reagents of original make, SIM data cost, network and cloud storage etc for 3rd year |
| 9 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumablesincluding reagents of original make, SIM data cost, network and cloud storage etc for 4th year |
| 10 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumablesincluding reagents of original make, SIM data cost, network and cloud storage etc for 5th year Please Enable Macros to View BoQ information |