Name of Work:- Repairing of damaged lining and cow ghat at RD 11500 of Mohammadpur disty
Sl. No.
Item Description
1
Credit of old Brick Bats
2
Item Description HSR Item
3
[14.31.2]Single layer brick lining for irrigation channels for discharge up to 150 cusecs consisting of: (i)10 mm thick cement plaster 1:6 on sub grade. (ii)10 mm thick cement plaster 1:3 over first plaster (iii)First layer of 68.3 mm thick brick layer (22.86x11.11 mm) laid in 1:3 mortar over 6 mm thick cement 1:3 the above cost (total thickness of lining as 9.43 cm) 2. On Side Slopes.
4
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
5
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix)
6
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar
7
[6.1.6A]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6A. 1:4:8 (1 Cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA)).
8
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
9
[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.