|
| 1 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4coarse sand) [Through Rate] |
| 2 | [2.B1211] B1211. R.C.C. pipes NP2 class 350 mm dia[Rate] |
| 3 | [3.1.6]By Mechanical Transport including loading,unloading and stacking 6. Stone aggregate 40 mm nominalsize and above [5km] |
| 4 | [4.8.1]Earth work in rough excavation, banking excavatedearth in layers not exceeding 20cm in depth, breakingclods, watering, rolling each layer with ½ tonne roller orwooden or steel rammers, and rolling every 3rd and topmostlayer with power roller of minimum 8 tonnes anddressing up in embankments for roads, flood banks,marginal banks and guide banks or filling up grounddepressions, lead up to 50 m and lift up to 1.5 m : 1. Allkinds of soil [Through Rate] |
| 5 | [6.1.5]Providing and laying in position cement concrete ofspecified grade excluding the cost of centering andshuttering - All work below plinth level and up to Floor IVlevel: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6graded stone aggregate 40 mm nominal size) [ThroughRate] |
| 6 | [7.21.1]Brick work with common burnt clay non-modularbricks of class designation 10.5 in foundation and plinth in:1. Cement mortar 1:4 (1 cement : 4 coarse sand) [ThroughRate] |
| 7 | Mtc. of ash dyke with earth filling for filling of gharras/side slopes, cut over etc. (N.S. Item) |
| 8 | Repairing of bund to correct slope in line and levelsusing approved quality of ash obtain from ash pond. |
| 9 | Providing and placing soil cover over ash bund. |
| 10 | Water Bound Macadam Grading screenings for lowvolume (undesignated) (without roads Providing, laying,spreading and compacting stone aggregates of specificsizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rollingwith 3 wheeled steel/ vibratory roller 8-10 tonnes instages to proper grade and camber, applying andbrooming requisite type of screening/ binding Materialsto fill up the interstices of coarse aggregate, wateringand compacting to the required density complete as pertechnical clause 404 of MORTandH specifications.Note:- Material to be provided by HPGCLOnly labour and machinary rate quoted by bidder. |
| 11 | Desiltation of garland drain in running/standing watercondition i/c removal of weeds growth, silt-sludge etc.at the ash |
| 12 | Providing of poly bags and filling with earth and thenplacing in position as per direction of Engineer-incharge. |
| 13 | Unit-6 to 8 = 2 Point.ARC for manual channelization of ash dyke unit 6 to 8at PTPS by Making of flow of ash slurry towards outletside by doing Channelization manually etc. in front ofunit 6 in the ash dyke at PTPS, Panipat.operation means operating a given point minimum oncea day during 24 hours.Note:- All taxes/levies applicable at the time ofexecution of work shall be paid by the contractor. Sorate to be quoted accordingly....Qty = 2x365 = 730 operations |
| 14 | Removal of grass/ sarkanda, wild growth on ash dykearea (NS Item).... Please Enable Macros to View BoQ information |