| 1 | Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201. hectare |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer . Dismantling Stone Masonry Rubble stone masonry in cement mortar |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) |
| 7 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories |
| 8 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/ Ruled pointing |
| 9 | Distempering with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer and of required shade and colour r manufacturer's specification. Two or more coats on new work |
| 10 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints finished flush. Red sand stone |
| 11 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 13 | Chequered precast cement concrete tiles 22 mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Dark shade using ordinary cement |
| 14 | Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H , machinery, lighting, guarding and maintenance of diversion. |
| 15 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth upto 5 km Please Enable Macros to View BoQ information |