|
| 1 | Suppl and fixing of 1 Exhaust Fan for Kitchen Room with 15AMP socket | Suppl and fixing of 1 Exhaust Fan for Kitchen Room with 15AMP socket |
| 2 | Supply and fixing of electric wiring in Chamber No 02 | Supply and fixing of electric wiring in Chamber No 02 |
| 3 | Supply and fixing of 06 15AMP Combination Board | Supply and fixing of 06 15AMP Combination Board |
| 4 | Supply and fixing of 05 LED Bulb 9 Watt | Supply and fixing of 05 LED Bulb (9 Watt |
| 5 | Supply and fixing of 01 Switch Board 10inch x 12inch | Supply and fixing of 01 Switch Board 10inch x 12inch |
| 6 | Supply and fixing of 10 Switch 5AMP | Supply and fixing of 10 Switch 5AMP |
| 7 | Supply and fixing of 06 Socket 5 AMP | Supply and fixing of 06 Socket 5 AMP |
| 8 | Supply and fixing of 02 Security Light | Supply and fixing of 02 Security Light |
| 9 | Replacement of existing 02 MS icon pipe bend of toilet outlet of Master Cabin toilet of SBS as per existing specification | Replacement of existing 02 MS icon pipe bend of toilet outlet of Master Cabin toilet of SBS as per existing specification |
| 10 | Repair of Sea Water Pipe Line of 2HP motor | Repair of Sea Water Pipe Line of 2HP motor |
| 11 | Replacement of existing Tapet Cover Gas Kit of main engine of both sides as per existing specification | Replacement of existing Tapet Cover Gas Kit of main engine of both sides as per existing specification |
| 12 | Repair of Radiator Fan vibrating defect of SBS of main engine | Repair of Radiator Fan vibrating defect of SBS of main engine |
| 13 | Replacement of existing 02 iron battery box as per existing specification including all changes | Replacement of existing 02 iron battery box as per existing specification including all changes |
| 14 | Supply and fixing of 02 Exhaust Fan of Aux Engine Room | Supply and fixing of 02 Exhaust Fan of Aux Engine Room |
| 15 | Repair of leakage defect of PT Pump of SBS and replacement of existing fuel line as per exiting specification | Repair of leakage defect of PT Pump of SBS and replacement of existing fuel line as per exiting specification |