|
| 1 | DC Colocation - Year-1 | Space, Infra Rental Charges as per requirement, including DC related work for CDU,SS Piping, Cable Tray , Network , Rack , PDU and in consideration to IT Load specified (in KW) |
| 2 | DC Colocation - Year-2 | Space, Infra Rental Charges as per requirement, including DC related work for CDU,SS Piping, Cable Tray , Network , Rack , PDU and in consideration to IT Load specified (in KW) |
| 3 | DC Colocation - Year-3 | Space, Infra Rental Charges as per requirement, including DC related work for CDU,SS Piping, Cable Tray , Network , Rack , PDU and in consideration to IT Load specified (in KW) |
| 4 | Seating Space | Seating space at the Co- located site for 10 Nos of Peoples for 3 Yrs |
| 5 | Electricity Charges - Year-1 | Annual Power charges for co-location considering the IT Load (exclusive of PUE) for 24x7x365 Operations (KWH Unit) |
| 6 | Electricity Charges - Year-2 | Annual Power charges for co-location considering the IT Load for 24x7x365 Operations (KWH Unit) |
| 7 | Electricity Charges - Year-3 | Annual Power charges for co-location considering the IT Load for 24x7x365 Operations (KWH Unit) |
| 8 | Bandwidth 1 | 10 Gbps Internet Leased Line 1, as per requirement at DC Colocation Facility, As per RFP, per quarter) |
| 9 | Bandwidth 2 | 10 Gbps Internet Leased Line 2, as per requirement at DC Colocation Facility, As per RFP, per quarter) |
| 10 | Any other charges | Any other charges, services, etc required for completing this requirement |
| 11 | Any other component | Any other item, material, component etc required for completing this requirement |