|
| 1 | Working charges |
| 2 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. |
| 4 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 5 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 6 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 7 | 50.18.9.20.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Bend |
| 8 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. |
| 9 | OD322530/2025-2026:Providing and fixing 90 mm PVC pipe as casing for 63 mm PVC pipeline, fixed with clamps at the required spacing, including jointing with one-step PVC solvent, as directed by the departmental officer, complete. |
| 10 | OD255932/2025-2026:Shifting the existing house connection to newly pvc pipe by using 25mm pvc pipe, 63mm pvc saddle after disconnecting the existing connection including cost of materials and labour charges etc complete as per the direction of departmental officers. |
| 11 | 50.18.9.20.8:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia End cap |
| 12 | OD304550/2025-2026:Supplying and fixing 20mm PVC air valve in all dia. of PVC distribution lines. |
| 13 | OD255933/2025-2026:Interconnection of newly laid 63mm PVC pipe x existing 110 mm PVC pipe including charges of bailing out water from the trenches, all labour charges and cost of materials etc. complete as per the direction of departmental officers. |
| 14 | OD255936/2025-2026:Interconnection of newly laid 63mm PVC pipe x existing 75 mm PVC pipe including charges of bailing out water from the trenches, all labour charges and cost of materials etc. complete as per the direction of departmental officers. |
| 15 | OD304404/2025-2026:Interconnection of newly laid 63mm PVC pipe x existing 63 mm PVC pipe including charges of bailing out water from the trenches, all labour charges and cost of materials etc. complete as per the direction of departmental officers. |
| 16 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 17 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 |
| 18 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 19 | Cost of materials |
| 20 | 100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia. |
| 21 | 100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia. Please Enable Macros to View BoQ information |