| 1 | fctusl Iyku ;kstuk 2026&27 ds vUrxZr fo/kqr forj.k [k.M eqjknuxj ds vUrxZr 11@-04 dsoh midsUnzksa dh {kerko`f)@fuekZ.k dk dk;ZA |
| 2 | Safe carriage of s.t./pcc pole from store center to site store with loading & unloading at both ends respectively distance within- 0 to 50 kms. |
| 3 | pcc poles 11 mtr. Long |
| 4 | pcc poles 8.5 mtr. Long |
| 5 | Loading, safe carriage & unloading of heavy stock material v type, disc insulator, pin insulator etc. From store center to site store with proper stacking of material, distance within-50 kms. |
| 6 | Loading, safe carriage & unloading of lt/ht cable, vcb & control panal tf etc from store center to site store with proper stacking of material, distance within-50kms. |
| 7 | Acsr wisel conductor |
| 8 | Dog conductor |
| 9 | Lt abc 3*50 sq. Mm. |
| 10 | Lt abc 3*95 sq. Mm. |
| 11 | Lt abc 3*120 sq. Mm. |
| 12 | Lt xlpe 1*400 sq. Mm. |
| 13 | Lt lead 1*240 sq. Mm. |
| 14 | Lt lead 1*120 sq. Mm. |
| 15 | 11 kv fuse set. |
| 16 | 11 kv do fuse set. |
| 17 | 11 kv tpmo set. |
| 18 | 25 kva transformer |
| 19 | 63 kva transformer |
| 20 | 100 kva transformer |
| 21 | 250 kva transformer |
| 22 | Erection of single pole st/pcc pole 11/ 33 kv fittings as per respo drawing top channal, dropper channal, x bracing set, disc insulator, pin insulator, guarding angle f bracket and etc as per direction of engineer incharge including the cost of labour, t&p and carrier etc. Required for proper completion of work. |
| 23 | pcc poles 11 mtr. Long |
| 24 | pcc poles 8.5 mtr. Long |
| 25 | Erection of double pole / saction pole of 11/33 kv fittings as per respo drawing top channal, dropper channal, x bracing set, disc insulator, pin insulator, guarding angle f bracket and etc as per direction of engineer incharge including the cost of labour, t&p and carrier etc. Required for proper completion of work. |
| 26 | pcc poles 11 mtr. Long |
| 27 | pcc poles 8.5 mtr. Long |
| 28 | Excavation of for each and grouting of single pole as per respo drawing and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone pad etc. As per actual site requirement |
| 29 | pcc poles 11 mtr. Long |
| 30 | pcc poles 8.5 mtr. Long |
| 31 | Excavation of for each and grouting of double pole/saction pole as per respo drawing and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone pad etc. As per actual site requirement |
| 32 | pcc poles 11 mtr. Long |
| 33 | pcc poles 8.5 mtr. Long |
| 34 | Loading, safe carriage & unloading of heavy stock material v type, disc insulator, pin insulator etc. From store center to site store with proper stacking of material from je store to pit site. |
| 35 | Loading, safe carriage & unloading of lt/ht cable, vcb & control panal tf etc from je store to pit site. |
| 36 | Acsr wisel conductor |
| 37 | Dog conductor |
| 38 | Lt abc 3*50 sq. Mm. |
| 39 | Lt abc 3*95 sq. Mm. |
| 40 | Lt abc 3*120 sq. Mm. |
| 41 | Lt xlpe 1*400 sq. Mm. |
| 42 | Lt lead 1*240 sq. Mm. |
| 43 | Lt lead 1*120 sq. Mm. |
| 44 | 11 kv fuse set. |
| 45 | 11 kv do fuse set. |
| 46 | 11 kv tpmo set. |
| 47 | 25 kva transformer |
| 48 | 63 kva transformer |
| 49 | 100 kva transformer |
| 50 | 250 kva transformer |
| 51 | Fixing of 11 kv stay set including nozelling etc. As per respo manual and also including the cost of all grouting material, labour, t&p etc required for proper completion of work. |
| 52 | Grouting of 11 kv stay set including nozelling etc. As per respo manual and also including the cost of all the support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of cement, sand, stone ballast, stone etc. As per actual site requirement , labour, t&p etc required for proper completion of work. |
| 53 | Fixing of earthing rod and wire as per respo manual and as per direction of supervising engineer including the cost of labour, t&p etc. Required for proper completion of work. |
| 54 | G.i.wire 8/10 swg |
| 55 | Fixing 11 kv cross arm. |
| 56 | 11 kv disc insulator. |
| 57 | 11 kv pin insulator. |
| 58 | Cutting /drilling /welding of ms angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on pcc/st pole for construction of the line. |
| 59 | Fabrication of t-off channel |
| 60 | Laying sagging stringing and binding and jumpering etc of following acsr conductor/wisel/rabit/abc all size on the newly erected poles as per respo manual and as per direction of supervising engineer. It includes the cost of labour, t&p, carrier etc. Required for proper completion of work. |
| 61 | Acsr wisel conductor |
| 62 | Dog conductor |
| 63 | Lt abc 3*50 sq. Mm. |
| 64 | Lt abc 3*95 sq. Mm. |
| 65 | Lt abc 3*120 sq. Mm. |
| 66 | Lt xlpe 1*400 sq. Mm. |
| 67 | Lt lead 1*240 sq. Mm. |
| 68 | Lt lead 1*120 sq. Mm. |
| 69 | Distribution box 3 phase complet with clamps. |
| 70 | Construction of plinth for distribution transformer |
| 71 | Wiremesh fencing work with material for safety of distribution transformer |
| 72 | Making jumpers on section points, by fixing of proper sizes, suitable for acsr conductor. Sectional double/four pole. |
| 73 | Mounting & installation of transformer from d/p |
| 74 | 25 kva transformer |
| 75 | 63 kva transformer |
| 76 | 100 kva transformer |
| 77 | 250 kva transformer |
| 78 | Plinth of pole/kiking of pole up nuturel ground level with material sand, brick etc. Provide by the contractor requried for proper completion of work. |
| 79 | Fixing of 11 kv fuse set |
| 80 | Fixing of 11 kv do fuse set |
| 81 | The follwing material will be fixed by the contractor. |
| 82 | Chemicle earthing electrod rod. |
| 83 | Smc fuse box |
| 84 | Danger bord |
| 85 | Barbed wire |
| 86 | Gi eire 4/8 swg. |
| 87 | Pg clamp for dog |
| 88 | Ms channel |
| 89 | Angle |
| 90 | Lt lug. |
| 91 | Lt lug. 120 |
| 92 | Lt lug. 240 |
| 93 | Lt lug. 400 |
| 94 | Dead end clamp. |
| 95 | Suspension clamp |
| 96 | J hook |
| 97 | F/side bracket |
| 98 | Clamp for 11 kv line |
| 99 | F clamp for 11 kv line |
| 100 | The follwing material will be provided by the contractor. |
| 101 | Chemicle earthing electrod rod. |
| 102 | Smc fuse box |
| 103 | Danger bord |
| 104 | Barbed wire |
| 105 | Pg clamp for dog |
| 106 | Ms channel |
| 107 | Angle |
| 108 | Lt lug. |
| 109 | Lt lug. 120 |
| 110 | Lt lug. 240 |
| 111 | Lt lug. 400 |
| 112 | Dead end clamp. |
| 113 | Suspension clamp |
| 114 | J hook |
| 115 | F/side bracket |
| 116 | Clamp for 11 kv line |
| 117 | F clamp for 11 kv line |
| 118 | Suspension clamp |
| 119 | J hook |
| 120 | I hook |
| 121 | F/side bracket |
| 122 | Clamp for 11 kv line |
| 123 | Nut & bolts |
| 124 | F clamp for 11 kv line |
| 125 | Cartage & removal of old & used received back material from site to store centre/ j.e. store. |
| 126 | Ms iron scrap |
| 127 | 100 kva transformer Please Enable Macros to View BoQ information |