| 1 | DSR Item No. 11.1 Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required |
| 2 | 3½ X 240 sq. mm (62mm) |
| 3 | 3½ X 400 sq. mm (82mm) |
| 4 | DSR Item No.11.4.9 Supplying and making straight through joint with heat shrinkable kit including ferrules and other jointing materials for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. |
| 5 | 3 X 70 sq. mm |
| 6 | DSR Item No.11.3.9 Supplying and making straight through joint with cast resin compound including ferrules and other jointing materials for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. |
| 7 | 3 X 70 sq. mm |
| 8 | Repair and servicing of HT-OCB’s / VCB’s of 400 Amps. to 800 Amp. 350 MVA of various types of make. The job includes the dismantling of OCB’s/ VCB’s & reinstallation of the same in the control panel unit. The cost also includes cleaning the 11KV contacts of HT OCB/ VCB, Lubrication of movable parts of mechanism of the panel units, replacements of minor pars during the servicing job being done at site. The job also includes servicing & the cost of minor parts & other petty material required to complete the job i.e. OCB shunt trip coil, mechanism greasing etc. The job includes the guarantee. |
| 9 | Repairing & Servicing of various type of ACB’s of various ratio from 800 A to 1600 Amp. of various types of make. The job includes dismantling of ACB’s from L.T. panel, re-installation of the same after servicing in the LT control panel unit. The cost also includes lubrication of movable parts, replacement of minor parts during the serving job being done at site. The job includes doing the repair of U/V coil, Shunt coil etc. |
| 10 | Supply and filling of transformer oil (Dehydrate oil) in the existing transformer. The job includes the cost of all petty material require to complete the job. |
| 11 | Dehydration of Transformer oil. The job includes the cost of labour and material required to complete the job. |
| 12 | Drain out transformer oil, opening of transformer part and replacement of gasket, oil seal and silica gel, breather of 500 KVA to 1000 KVA oil type transformer to stop the leakage of oil as required at site, refilling of oil after complete the job to the entire satisfaction of Engineer-in-charge. |
| 13 | DSR item No.2.2 Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel, making connections, Ics=100% Icu and Operational Voltage 690V etc. as required |
| 14 | 125 A,36KA,FPMCCB |
| 15 | 200 A,36KA,FPMCCB |
| 16 | 250 A,36KA,FPMCCB |
| 17 | Supply & erection of dry type potential transformers of PT ratio 20/5, 40/5, 50/5 Amp. and having accuracy Class 0.5 strictly confirming to relevant IS Specifications for 3 Phase 4 wiring system. The job includes the cost of copper wire of suitable size as required for inter connection to complete the job to the entire satisfaction of EIC. The job includes the cost of testing fees of Potential transformer from electricity department of U.T. Chandigarh. The PT should be of ECE / Pargati / Kappa / Ericon / Bharti Electricals / Equiv make only. |
| 18 | Locating of fault in underground 11KV cable with the help of fault locating machine. It includes the cost of arrangement of power supply / generator required during the fault locating. The job includes the cost of all petty materials required to complete the job to the entire satisfaction of Engineer-in-charge |
| 19 | Supply and Erection rubber mat of size 6’x3’x12 mm thick (ISI mark) wide of superior quality of approved make as approved by the Engineer-in-charge to be laid on floor in HT room in front of panels and transformers. |
| 20 | Refilling of fire extinguisher of various capacity in various location. The job includes cost of other petty material and labour etc. as required to complete the job to the entire satisfaction of Engineer-in-charge. |
| 21 | 5 KG capacity |
| 22 | 10 KG capacity |
| 23 | Supply and erection of the following spares to be replaced/ required during service and testing work material/ spares should be of approved make as recommended by manufacturer of the VCB |
| 24 | Panel heaters |
| 25 | Spout insulator |
| 26 | Bus bar support insulators |
| 27 | Tripping and closing coils 24 VDC |
| 28 | Heat shrinkable sleeve |
| 29 | Led indicator lamp of HT and LT panel of GE/ L&T/Schneider sleeve Please Enable Macros to View BoQ information |