|
| 1 | Commode (New).degutting of existing Commode and provision and fitment of new commode with flushing tank and flushing valve, required pipelines etc, Pipeline mat. Cu.ni..As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Commode (New).degutting of existing Commode and provision and fitment of new commode with flushing tank and flushing valve, required pipelines etc, Pipeline mat. Cu.ni..As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 2 | NWT Door (new)degutting of existing door and provision and fitment of new NWT Door with lock, emergency escape, door closure, handles and bulkhead frame double skin SS 304 grade with 7 lever mortise lock of reputed brandAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | NWT Door (new)degutting of existing door and provision and fitment of new NWT Door with lock, emergency escape, door closure, handles and bulkhead frame double skin SS 304 grade with 7 lever mortise lock of reputed brandAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 3 | Shower Curtains with rods (new)Provision and fitment of new shower curtains with SS rod of 20-25mm dia and 1.6 mm thickness of Reputed make.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Shower Curtains with rods (new)Provision and fitment of new shower curtains with SS rod of 20-25mm dia and 1.6 mm thickness of Reputed make.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 4 | Shower Heads (new)Provision and fitment of new SS shower and heads with taps and mixers (reputed make) with necessary plumbing and pipeline works and valves (if any required). Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Shower Heads (new)Provision and fitment of new SS shower and heads with taps and mixers (reputed make) with necessary plumbing and pipeline works and valves (if any required). Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 5 | FW Taps (new)Provision and fitment of new SS FW taps (reputed make) with mixer alongwith all necessary plumbing work,pipelines and valves. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | FW Taps (new)Provision and fitment of new SS FW taps (reputed make) with mixer alongwith all necessary plumbing work,pipelines and valves. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 6 | 2 way Bib Cock (new)Provision and fitment of new SS 2 way bib cock (reputed make) alongwith all necessary plumbing work and pipelines. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | 2 way Bib Cock (new)Provision and fitment of new SS 2 way bib cock (reputed make) alongwith all necessary plumbing work and pipelines. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 7 | Laying of new piepeline (for A's and A's)layong and fitment of new Cu-Ni pipeline for new A's and A's, 3/4 inch dia. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Laying of new piepeline (for A's and A's)layong and fitment of new Cu-Ni pipeline for new A's and A's, 3/4 inch dia. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 8 | Towel hanger (new)Provision and fitment of new SS towel hanger rods (set of 3) of reputed brand. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Towel hanger (new)Provision and fitment of new SS towel hanger rods (set of 3) of reputed brand. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 9 | Health Faucet (new)Provision and fitment of new SS health faucet ( reputed brand) with all necessary plumbing and pipelines. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Health Faucet (new)Provision and fitment of new SS health faucet ( reputed brand) with all necessary plumbing and pipelines. Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 10 | Soap dispenser (new)Degutting of old dispenser and provision and fitment of new liquid soap dispenser (reputed make). Capacity 1 ltr, material SS, wall mountedAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Soap dispenser (new)Degutting of old dispenser and provision and fitment of new liquid soap dispenser (reputed make). Capacity 1 ltr, material SS, wall mountedAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 11 | Soap Tray (new)Provision and fitment of new SS304 grade soap trays with slots (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Soap Tray (new)Provision and fitment of new SS304 grade soap trays with slots (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 12 | Toiletry trays (new)Provision and fitment of new toiletry tray for storage of toiletries SS 304 grade(reputed make). Length 380mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Toiletry trays (new)Provision and fitment of new toiletry tray for storage of toiletries SS 304 grade(reputed make). Length 380mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 13 | SS mirrors (new) ( Big)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm.Size of the mirror 1400 X 400mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS mirrors (new) ( Big)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm.Size of the mirror 1400 X 400mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 14 | SS mirrors (new) ( small)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm. size of the mirror 500 X 300 mm . Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS mirrors (new) ( small)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm. size of the mirror 500 X 300 mm . Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 15 | Cloth Hooks (new)Provision and fitment of new SS cloth hooks with 2 ends (reputed make)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Cloth Hooks (new)Provision and fitment of new SS cloth hooks with 2 ends (reputed make)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 16 | Grab rail (new)Provision and fitment of new SS 12\\" grab rail (reputed make).20-25 mm dia, 1.2-1.6 mm thicknessAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Grab rail (new)Provision and fitment of new SS 12\\" grab rail (reputed make).20-25 mm dia, 1.2-1.6 mm thicknessAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 17 | SS Panels (new)Degutting of old panels and fitment of new SS single skin panels 0.9 mm thick SS304 matt finish. Paneling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. Associated works like Grid work, Corner L joints, channels, rubber packing etc. are to be provided as per necessity.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Panels (new)Degutting of old panels and fitment of new SS single skin panels 0.9 mm thick SS304 matt finish. Paneling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. Associated works like Grid work, Corner L joints, channels, rubber packing etc. are to be provided as per necessity.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 18 | SS Doors (new)Degutting of existing doors and provision and fitment of new 2 leaves double skin SS toilet doors with dual side handles & SS latch lock (reputed make) on both sides. Dimensions as per SS requirement. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Doors (new)Degutting of existing doors and provision and fitment of new 2 leaves double skin SS toilet doors with dual side handles & SS latch lock (reputed make) on both sides. Dimensions as per SS requirement. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 19 | SS Sink (new)Degutting of existing sink and provision of new SS sink with taps, pipelines, plumbing works including isolating valve if necessary, bottle trap and garbage compactor. Approx Dimensions (600 x 600 x 450 mm). Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Sink (new)Degutting of existing sink and provision of new SS sink with taps, pipelines, plumbing works including isolating valve if necessary, bottle trap and garbage compactor. Approx Dimensions (600 x 600 x 450 mm). Pipeline mat: Cu.ni. (Dia 19mm-25mm)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 20 | Urinal (new)Removal of old Urinal and provision and fitment of new Urinal with pushing flush button and connecting end fitting, Cu.Ni pipeline and associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Urinal (new)Removal of old Urinal and provision and fitment of new Urinal with pushing flush button and connecting end fitting, Cu.Ni pipeline and associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 21 | Deck drain stainer (New)Provision and fitment of item of reputed make with associated fittings. Mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Deck drain stainer (New)Provision and fitment of item of reputed make with associated fittings. Mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 22 | Crockery/Cutlery locker vertical (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 2300 X 850X 450. Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Crockery/Cutlery locker vertical (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 2300 X 850X 450. Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 23 | Crockery/Cutlery locker Horizontal (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 1700 X 900X 700.Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Crockery/Cutlery locker Horizontal (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 1700 X 900X 700.Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 24 | Plate stand (New)Provision and fitment of SS stand with locking arrangements and associated fittings. Provision for 50 in nos of plates.Guage 1.6 mm. Approximate dimensions 700 X 400 X 650 mm As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Plate stand (New)Provision and fitment of SS stand with locking arrangements and associated fittings. Provision for 50 in nos of plates.Guage 1.6 mm. Approximate dimensions 700 X 400 X 650 mm As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 25 | SS Wash basin (new)Provision and fitment of new wash basin (450x450x400 mm) with flexible pipe, controlling tap, bottle trap and SS cabinet below with Cu.ni pipelines whereever necessary.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Wash basin (new)Provision and fitment of new wash basin (450x450x400 mm) with flexible pipe, controlling tap, bottle trap and SS cabinet below with Cu.ni pipelines whereever necessary.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 26 | Towel rod/Towel ring (New)Provision and fitment of New SS item with associated fittings.( reputed make)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Towel rod/Towel ring (New)Provision and fitment of New SS item with associated fittings.( reputed make)As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 27 | Serving table/counter (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 2600 X 900 X 600 mm. Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Serving table/counter (New)Provision and fitment of SS locker with locking arrangements and associated fittings. Approximate dimensions 2600 X 900 X 600 mm. Interior arrangements may vary as per SS requirements within the indicated dimensions.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 28 | Commode/NWT door/SS Sink/ SS Cupboard/ Locker(SS/CRCA)/Shower head/shower mixer/Urinal/Toilet tray/Washbasin etc. (Degutting)Removal of existing item and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Commode/NWT door/SS Sink/ SS Cupboard/ Locker(SS/CRCA)/Shower head/shower mixer/Urinal/Toilet tray/Washbasin etc. (Degutting)Removal of existing item and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 29 | Commode/NWT door/SS Sink/ SS Cupboard/ Locker(SS/CRCA)/Shower head/shower mixer/Urinal/Toilet tray/Washbasin etc. (Regutting)Fitment of existing item and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Commode/NWT door/SS Sink/ SS Cupboard/ Locker(SS/CRCA)/Shower head/shower mixer/Urinal/Toilet tray/Washbasin etc. (Regutting)Fitment of existing item and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 30 | SS Paneling (Degutting)Removal of existing item and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Paneling (Degutting)Removal of existing item and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 31 | NWT Door (Repair)Degutting, Repair and refitment of existing door post necessary repairs and CRCA Powder coating/SS polishing, repair/replacement of lock, handle and provisoin of emergency escape and door closure if required. lock and door closure to be replaced with reputed make items.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | NWT Door (Repair)Degutting, Repair and refitment of existing door post necessary repairs and CRCA Powder coating/SS polishing, repair/replacement of lock, handle and provisoin of emergency escape and door closure if required. lock and door closure to be replaced with reputed make items.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 32 | Shower Heads (repair)Degutting, repair and fitment of existing SS shower heads with taps and mixers (reputed make) with necessary plumbing and replacement pipeline whichever rusted. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Shower Heads (repair)Degutting, repair and fitment of existing SS shower heads with taps and mixers (reputed make) with necessary plumbing and replacement pipeline whichever rusted. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 33 | FW Taps (repair)Degutting, repair and fitment of existing SS shower heads with taps and mixers (reputed make) with necessary plumbing and replacement pipeline whichever rusted. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | FW Taps (repair)Degutting, repair and fitment of existing SS shower heads with taps and mixers (reputed make) with necessary plumbing and replacement pipeline whichever rusted. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 34 | SS Panels (repair)Degutting of panels and fitment of existing SS single skin panels 0.9 mm thick SS304 matt finish post necessary repairs and SS polish. Paneling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. Associated works like Grid work, Corner L joints, channels, rubber packing etc. are to be provided as per necessity.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Panels (repair)Degutting of panels and fitment of existing SS single skin panels 0.9 mm thick SS304 matt finish post necessary repairs and SS polish. Paneling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. Associated works like Grid work, Corner L joints, channels, rubber packing etc. are to be provided as per necessity.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 35 | SS Doors (repair)Degutting of existing doors and repair, SS polish and fitment of 2 leaves double skin SS toilet doors with dual side handles & mortise locksAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Doors (repair)Degutting of existing doors and repair, SS polish and fitment of 2 leaves double skin SS toilet doors with dual side handles & mortise locksAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 36 | SS Sink (repair)Degutting of existing sink,repair, SS Polishing and fitment of SS sink with taps, pipelines, plumbing works, bottle trap and garbage compactor. Approx Dimensions (600 x 600 x 450 mm). Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Sink (repair)Degutting of existing sink,repair, SS Polishing and fitment of SS sink with taps, pipelines, plumbing works, bottle trap and garbage compactor. Approx Dimensions (600 x 600 x 450 mm). Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 37 | Commode (repair)degutting of existing Commode, repair and fitment of commode with flushing tank and flushing valve, required pipelines etc, As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Commode (repair)degutting of existing Commode, repair and fitment of commode with flushing tank and flushing valve, required pipelines etc, As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 38 | Crockery/Cutlery locker (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Crockery/Cutlery locker (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 39 | Plate stand (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Plate stand (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 40 | SS Wash basin (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittings like flexible pipe, controlling tap, bottle trap and SS cabinet below. Provide require Cu.ni pipelines.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Wash basin (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittings like flexible pipe, controlling tap, bottle trap and SS cabinet below. Provide require Cu.ni pipelines.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 41 | Deck drain stainer (repair)Degutting, repair and fitment of existing Deck drain stainer with associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Deck drain stainer (repair)Degutting, repair and fitment of existing Deck drain stainer with associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 42 | Serving table/counter (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Serving table/counter (Repair)Degutting of existing item, repair, SS polishing/CRCA Powder coated and fitment of item post repairs with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 43 | Towel rod/Towel ring (Repair)Degutting of existing item, repair, SS polishing and fitment of item post repairs with associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Towel rod/Towel ring (Repair)Degutting of existing item, repair, SS polishing and fitment of item post repairs with associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 44 | Health Faucet (repair)Degutting, repair and fitment of existing SS health faucet with all necessary plumbing and pipelines. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. | Health Faucet (repair)Degutting, repair and fitment of existing SS health faucet with all necessary plumbing and pipelines. Pipeline mat. Cu.ni.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. |