| 1 | Check survey as per approved route of line which includes - |
| 2 | Detail survay as per tentative route:- Which indcludes the following majour activites- Pagging of line route providingofsurvey piller at an interval of 3-4kms. |
| 3 | Check survey as per approved route of line which includes :- Re-checking of the line route as per approved route. Profile chainage tower centre marking pit marking bisectin of angle tower asrequired at site |
| 4 | Excavation excluding back filling, including shoring, shuttering, dewatering, etc. upto the required depth as per foundation specification / drawings. |
| 5 | (i) Any soil,soft rock other than hard rock |
| 6 | (ii)Hard rock(with blasting subject to permission or without blasting) |
| 7 | Setting of templet & stub/anchor or bolts;- Setting of template &Stub/Anchor Bolt & Removal after concreting excluding cost of excavation and concreting but including backfillingwith excavated borrowed earth |
| 8 | (i) Tower including extension upto 9 Meters |
| 9 | Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size,water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. |
| 10 | (ii) 1:3:6 Mix |
| 11 | (iii) 1:1.5:3 Mix |
| 12 | STEEL REINFORCEMENT |
| 13 | Cutting, bending, welding of joints ifrequired, fixing and placing of steel reinforcement as per specification and drawings includding material. |
| 14 | EARTHING: |
| 15 | Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats & connectors, but including coke/charcoal, etc.,excavation,augering and backfilling in all types of soil. |
| 16 | Erection of Super structure including D- shakels , ACD , hangers, U- Bolts, Step bolts, Danger plate, Phase plate, Number Plate Etc. also including tack welding of bolts and nuts upto bottom cross arm/beam level includig appliation ofZinc Rich Paint. |
| 17 | All type of tower |
| 18 | Conductor Re-stringing |
| 19 | Single ACSR Pnather |
| 20 | Earthwire Re-stringing:- Re-Stringing of galvanised steel standerd wire includding laying,jointing & tensning, clamping, cliping and fixing vibration damper and eart bondetc. |
| 21 | (A) One No.7/3.15mm galvanised wire. |
| 22 | Dismantling of tower Please Enable Macros to View BoQ information |