|
| 1 | Detail of Work |
| 2 | Safely cartage of PCC poles 8.5/9 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 3 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 4 | Safely cartage of ST Pole 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 5 | Safe cartage of ST Pole 13 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 6 | Safely cartage of other complete line material (Except PCC /ST Poles) from ESC, SRE/ JE store to site of work including loading, unloading at both ends. |
| 7 | Erection of single support on PCC poles 8.5/9 Mtr. Long with complete fitting of all accessories of 33/11 KV/LT line properly |
| 8 | Erection of single support on PCC poles 11 Mtr. Long with complete fitting of all accessories of 33 KV/11 KV/LT line properly |
| 9 | Erection of double Pole on PCC poles 8.5/9 Mtr. Long with complete fitting with all accessories of 33/11 KV/LT line. Properly |
| 10 | Erection of double Pole on PCC poles 11 Mtr. Long with complete fitting with all accessories of 11 KV/LT line. Properly |
| 11 | Erection of single support on ST Pole 11 Mtr. Long with complete fitting of all accessories of 33 KV/11 KV/LT line properly |
| 12 | Erection of single support on ST Pole 13 Mtr. Long with complete fitting of all accessories of 33 KV/11 KV/LT line properly |
| 13 | Erection of double Pole on ST Pole 11 Mtr. Long with complete fitting with all accessories of 33 KV/11 KV line. Properly |
| 14 | Erection of double Pole on ST Pole 13 Mtr. Long with complete fitting with all accessories of 33 KV/11 KV line. properly |
| 15 | Re-Straightening of tilted ST/ PCC poles up to 13 Mtr. long of 33 KV/11 KV/ LT lines with opening, binding and jumpering of conductor. & Re-binding, Re- jumpering the same properly. |
| 16 | Re-strengthening of tilted D/P (PCC/ST up to 13 Mtr. long with opening, of all accessories & binding and jumpering of conductor. & Re-fitting the all accessories, Re-binding, Re-jumpering the same properly. |
| 17 | Re-sagging of loose conductor of 11 KV lines (consisting of 3 Phase) with opening, binding and jumpering of conductor & Re-binding, Re-jumpering the same properly. |
| 18 | Re-sagging of loose conductor of 33 KV lines (consisting of 3 Phase) with opening, binding and jumpering of conductor & Re-binding, Re-jumpering the same properly. |
| 19 | Re-sagging of all size loose AB cable with opening consumer cable connections and Re-connections the same complete in all respect. |
| 20 | Removal of old & Damaged weasel/ Rabbit/ AB conductor from the Existing 11KV/ LT lines with making roll of conductor and shifting the same to ESC, SRE/J.E store including loading and unloading at both ends. |
| 21 | Safely Dismantling & cartage of ST/ PCC poles up to 13 Mtr. from site to JE store including loading & unloading at both ends. |
| 22 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasal/Rabbit/Dog Conductor for 11KV/LT Line including complete. |
| 23 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x50+1x35+1x16/ 3x95+1х70+1х16/3x120+1x95+1x16 sq.mm. including fixing of all accessories. |
| 24 | Providing & Fixing of All type MS Clamp for ST/ PCC poles with nuts bolts made of new MS flat iron 50x6 mm. |
| 25 | Re-straightening of tilted X-arm with opening of complete fitting jumpers and re- fitting the same after re-strengthening of tilted X-arm properly. |
| 26 | Tightening of loose stay including opening, binding & nozzling of stay wire. |
| 27 | Replacement of broken/damaged Disc & Pin insulators Please Enable Macros to View BoQ information |