|
| 1 | Supply,installation,testing and commissioning of Eco friendly of 82.5 KVA silent Diesel Engine driven generating set 415 volts, 3 phase 4 wire, AC 415 volt, 50Hz, .08PF at 1500 RPM acoustic enclosure made out of CRCA Sheet powder coated, specially designed lifting arrangement/hooks, meet the latest CPCB IV+ norms for Noise and Exhaust Emission engine as per IS:10001/ 10002 and Alternator as per IS: 13364 complete with relay panel and self exciled, self regulated, Automatic voltage regulation, class 'H' insulation type alternator, with AMF (Automatic mains faliure) panel all as specified and directed by Engr-in-Charge. |
| 2 | Supply,installation,testing and commissioning of Eco friendly of 160 KVA silent Diesel Engine driven generating set 415 volts, 3 phase 4 wire, AC 415 volt,50Hz, .08PF at 1500 RPM acoustic enclosure made out of CRCA Sheet powder coated, specially designed lifting arrangement/hooks, meet the latest CPCB IV+ norms for Noise and Exhaust Emission engine as per IS:10001/ 10002 and Alternator as per IS: 13364 complete with relay panel and self exciled, self regulated, Automatic voltage regulation, class 'H' insulation type alternator, with AMF (Automatic mains faliure) panel all as specified and directed by Engr-in-Charge. |
| 3 | NOTE :- The following accessroies are included for Ser Item No. 1 and 2 above and rate quoated by bidder are deemed to be inclusive of all the following items:- |
| 4 | (i) Engine:-(a)Liquid cooled, Turbocharged after cooled develping at 1500 RPM(b)Compression ignition(c)G3 as per ISO 8528 Part V class governor(d)Battery Charging alternator(e)Dry type Air cleaner with service indicator, CRDI system(f)Lube Oil & Fuel filter, DOC(g)Radiator with fan(h)Electric starter motor with soft starting system |
| 5 | (ii) ACOUSTIC ENCLOSURE(a)The Enclosure is of modular construction.(b)Durable industrial locking system is provided on doors(c) The sheet metal components are 9 tanks pre-trreated and is Polyester based powder coated for long life |
| 6 | (iii) Alternator (a) Continous operation rated at 1500 rpm, 415V,.80 PF, 50.00Hz Ph in SPDP enclosure, self -excited, self -regulated Brush less, floor mounted asper IS:4722.BS EN 60034-1 & suitable for tropical condition.(b) Specially designed sound attenuators are provided to control sound at air entry & exit points inside the enclosure.(c)The walls of enclosure are insulated with the fire-retardant &(f) In-build draw in type fuel tank.(g)The walls of enclosure are insulated with the fire-retardant & noise absorbent foam/Rockwool so as to comply with the noise level of 75dB (A) at distance of 1 mtr, in open free field envirement as per ISO 8528 part 10 specified by ministry of Envirement & Forest. |
| 7 | (iv) Batteries :- Maintenece free suitable batteries of 12 /24 Volt complete with copper conductor multistranded leads of suitable length from self starter to the battary terminals complete with initial charge and initial fill of electrolite complete as recommended by OEM. |
| 8 | (v) Handling and operation :- (a) Low vibration,best in class fuel consumption with electronic fuel injection system(b) Class G3 Governing in its range,. Which gives better accuracy in decreasing the speed drop in transient and lowering the recovery time of the speed.(c) Confirms to statutory Govt. CPCB IV+ emission & noise level norms(d) Nuts-bolts,hardware are of stainless steel for longher life(e) Doors are gasketd with high quality EPDN gaskets tio avoid leakage of sound.(f) Low cost of service, spares and operation cost.(g) Sheet metal components are 9 tanks pre-treated and is polyester based powder coated for long life. |
| 9 | vi) Generator Monitoring Panel: Comprising of following:-(a) Microprocessor based genset contoller (POWER COMMAND for metering, monitoring, governing and protection. (b) Engine protection for low lub oil pressure, high coolant temperature (alarm & shutdown)(c) Alternator protection parameters like under voltage, over current, under frequency, over frequency (Alarm & shut down)(d) Relay drivers for remote annuciations(e) Cyclic cranking(f) Auto/manual start/ stop(g) Alternator trim adjustment from the front key pad(h) Operates within a temperature range 0- 60 degrees C and humidity upto 95%.(j) Remote monitoring capabilty through separate interface modules.(k) Genset metering parameters like lube oil pressure, coolant temperature, engine speed(rpm), run hours, DC voltage, intake manifold temperature, 3 phase volts and 3 phase amperes, frequency, KW, KVA, power factor etc. |
| 10 | Vii) Safety Controls : - Engine low lube oil pressure, high water temparature and over speeding of engine.viii) Coupling arrangement : - Flexible coupling, fly wheel to suit flexible coupling fly wheel housing.ix) Accessories :- AVM Pads built or separtely mounted to manufacturer base frames.viii) Base Frame : - Made out of ISMC 250 of sturdy design made of MS channel with necessary reinforcement and predetermined holes.ix) Fuel Tank :- Daily service made out of 3mm thick HR sheet top and bottom with caliberated level indicating arrangement, stop cock, drain plug, fuel pump of suitable capacity complete on a common base within the Acoustic Enclosure.(x) Auto Main Failure (AMF) : Microprocessore based cubical panel indoor type made out of CRCA sheet of 2mm thick conforming to IS 8623 totally enclosed dust and vermin proof with front and rear openings of 415 Volts, 3 phase, 4 wire, AC 50Hz having copper bus bar capacity required to carry current at 110% load of capacity with three phase and half neutral colour coded, prewired with copper cable of suitable size all as standard practice of manufacturer specifications with the following accessories:-(a) Microprocessor based MCCB 3 pole, including 3-Ph contactor and O/L Relay for alternator. (b) Digital Ammeter 0-800A with selector switch of suitable capacity with CTs (c) Digital Voltmeter with slector switch (d) Digital frecuency meter(e) Digital KW meter(f) Digital KWH meter panel mounted type(g) Digital PF meter |
| 11 | Material and labour for disconnecting all electical, earthing connection etc of existing 2xDG set of any capacity and shifting the same from existing location to E/M store yard complete all as specified and directed by Engr-in-Charge. Note : Cost of all T&P required shall be included in the rate quoted by contractor. |
| 12 | Material and labour excavation in trenches exc 1.5 mtr width & n.exc 1.5 mtr in depth for laying U/G cable including getting out in soft/loose soil all as specified and directed by Engr-in-Charge. . |
| 13 | Material and labour for returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 CM all as specified and directed by Engr-in-Charge. |
| 14 | Material and labour for removing excavated material n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point all as specified and directed by Engr-in-Charge. |
| 15 | Material and labour for supply and spread of fine dry river sand for cable cushioning in trenches complete all as specified and directed by Engr-in-Charge. Note:- Punned thickness of 18cm shall only be measured for per cum. |
| 16 | Supply and labour for unreinforced precast concrete cable cover, class LV, Type 1, flat, size 250mm X 150mm X 40mm completeall as specified and directed by Engr-in-Charge. |
| 17 | Supply, laying and testing of XLPE insulated, screened PVC bedded, armoured, heavy duty electric cable with aluminium conductor, 1100 Volts grade, of size 3.5 core, 70 Sqmm complete as specified and directed by Engr-in-Charge. |
| 18 | Supply, laying and testing of XLPE insulated, screened PVC bedded, armoured, heavy duty electric cable with aluminium conductor, 1100 Volts grade, of size 3.5 core, 120 Sqmm complete as specified and directed by Engr-in-Charge. |
| 19 | Material and labour for earthing complete with galvanised steel earth plate electrode 60×60cm.× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised iron strip 25x4mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion all as specified and directed by Engr-in-Charge. |
| 20 | Note:- (i) Any fittings/fixtures which are necessary for proper functioning of the DG set shall also be deemed include in the unit rate quoted and shall be provided by the contractor without any extra cost to the Deptt.(ii) Necessary foundation for installation of DG set shall be provided as per manufacturers recommendations and cost deemed to be inclusive in the rate quoted for this items. (iii) All testing equipments ae to be arranged by the contractor and testing shall be carried out by the contractor in presence of Engr-in-Charge and testing result duly signed by the Engr-in-Charge and the contractor shall be kept in record. (iv) Rate quoted by the contractor including the rate of first filling of lubricating oil, coolent and duct with wooden cover from DG set to AMF panel. AMF panel must be outside the canopy. (v) Drawings/cataloged for DG set and AMF panel got approved by the GE before ordering to the manufacturer. |