| 1 | 10 KVA Modular UPS N plus 1 at Azamgarh | Single phase Input and Single phase Output |
| 2 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 3 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 4 | SPD at Input | SPD at Input of 10 KVA UPS |
| 5 | SPD at Output | SPD at Output of 10 KVA UPS |
| 6 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 7 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 8 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 9 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 10 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 11 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 12 | Installation Testing and Commissioning at Azamgarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 13 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 14 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 15 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 16 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 17 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 18 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 19 | 10 KVA Modular UPS N plus 1 at Bikaner | Single phase Input and Single phase Output |
| 20 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 21 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 22 | SPD at Input | SPD at Input of 10 KVA UPS |
| 23 | SPD at Output | SPD at Output of 10 KVA UPS |
| 24 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 25 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 26 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 27 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 28 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 29 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 30 | Installation Testing and Commissioning at Bikaner | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 31 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 32 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 33 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 34 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 35 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 36 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 37 | 10 KVA Modular UPS N plus 1 at Dehradun | Single phase Input and Single phase Output |
| 38 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 39 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 40 | SPD at Input | SPD at Input of 10 KVA UPS |
| 41 | SPD at Output | SPD at Output of 10 KVA UPS |
| 42 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 43 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 44 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 45 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 46 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 47 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 48 | Installation Testing and Commissioning at Dehradun | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 49 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 50 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 51 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 52 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 53 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 54 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 55 | 10 KVA Modular UPS N plus 1 at Khajuraho | Single phase Input and Single phase Output |
| 56 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 57 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 58 | SPD at Input | SPD at Input of 10 KVA UPS |
| 59 | SPD at Output | SPD at Output of 10 KVA UPS |
| 60 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 61 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 62 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 63 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 64 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 65 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 66 | Installation Testing and Commissioning at Khajuraho | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 67 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 68 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 69 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 70 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 71 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 72 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 73 | 10 KVA Modular UPS N plus 1 at Pantnagar | Single phase Input and Single phase Output |
| 74 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 75 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 76 | SPD at Input | SPD at Input of 10 KVA UPS |
| 77 | SPD at Output | SPD at Output of 10 KVA UPS |
| 78 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 79 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 80 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 81 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 82 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 83 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 84 | Installation Testing and Commissioning at Pantnagar | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 85 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 86 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 87 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 88 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 89 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 90 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 91 | 10 KVA Modular UPS N plus 1 at Sirsa | Single phase Input and Single phase Output |
| 92 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup |
| 93 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 94 | SPD at Input | SPD at Input of 10 KVA UPS |
| 95 | SPD at Output | SPD at Output of 10 KVA UPS |
| 96 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 97 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 98 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input |
| 99 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes |
| 100 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 101 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 102 | Installation Testing and Commissioning at Sirsa | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 103 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 104 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 105 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 106 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 107 | CAMC 5th Year | CAMC cost of 5th year post warranty period |
| 108 | CAMC 6th Year | CAMC cost of 6th year post warranty period |
| 109 | UPS 05 KVA at Chandigarh | Single phase Input and Single phase Output |
| 110 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 111 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 112 | SPD | SPD at Input and Output of 5 KVA UPS |
| 113 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 114 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 115 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 116 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 117 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 118 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 119 | Installation Testing and Commissioning at Chandigarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 120 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 121 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 122 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 123 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 124 | UPS 05 KVA at Chitrakoot | Single phase Input and Single phase Output |
| 125 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 126 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 127 | SPD | SPD at Input and Output of 5 KVA UPS |
| 128 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 129 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 130 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 131 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 132 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 133 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 134 | Installation Testing and Commissioning at Chitrakoot | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 135 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 136 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 137 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 138 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 139 | UPS 05 KVA at Kangra | Single phase Input and Single phase Output |
| 140 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 141 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 142 | SPD | SPD at Input and Output of 5 KVA UPS |
| 143 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 144 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 145 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 146 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 147 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 148 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 149 | Installation Testing and Commissioning at Kangra | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 150 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 151 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 152 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 153 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 154 | UPS 05 KVA at Kishangarh | Single phase Input and Single phase Output |
| 155 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 156 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 157 | SPD | SPD at Input and Output of 5 KVA UPS |
| 158 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 159 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 160 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 161 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 162 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 163 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 164 | Installation Testing and Commissioning at Kishangarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 165 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 166 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 167 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 168 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 169 | UPS 05 KVA at Lucknow | Single phase Input and Single phase Output |
| 170 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 171 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 172 | SPD | SPD at Input and Output of 5 KVA UPS |
| 173 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 174 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 175 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 176 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 177 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 178 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 179 | Installation Testing and Commissioning at Lucknow | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 180 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 181 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 182 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 183 | CAMC 4th Year | CAMC cost of 4th year post warranty period |
| 184 | UPS 05 KVA at Moradabad | Single phase Input and Single phase Output |
| 185 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup |
| 186 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 187 | SPD | SPD at Input and Output of 5 KVA UPS |
| 188 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard |
| 189 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard |
| 190 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input |
| 191 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes |
| 192 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx |
| 193 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard |
| 194 | Installation Testing and Commissioning at Moradabad | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 195 | CAMC 1st Year | CAMC cost of 1st year post warranty period |
| 196 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period |
| 197 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period |
| 198 | CAMC 4th Year | CAMC cost of 4th year post warranty period |