| 1 | Supply and fill Dry bed media |
| 2 | OD33450/2025-2026:Supply and fill Dry bed media (1.5-inch and 3/4 inch pebbles) |
| 3 | Supply ,installation and commissioning of 3 Nos chemical dosing pumps ,suitable chemical storage tanks ,chemical piping,valve and |
| 4 | OD39368/2025-2026:Supply ,installation and commissioning of 3 Nos chemical dosing pumps ,50 LTR chemical storage tanks ,chemical piping,valve and fittings , complete installation and testing |
| 5 | Supply, installing ,testing and commissioning of Fine Bubble Diffuser Ø 90 mm × 1 m air flow rate 8 -12 m³/hr . |
| 6 | OD33396/2025-2026:Supply, installing ,testing and commissioning of Fine Bubble Diffuser Ø 90 mm × 1 m air flow rate 8 -12 m³/hr . |
| 7 | Supply and installation of Blower (7.5 HP) A1 BLOWER and A1 4175 ELECTRICAL MOTOR |
| 8 | OD33397/2025-2026:Supply and installation of Blower (7.5 HP) A1 BLOWER and A1 4175 ELECTRICAL MOTOR |
| 9 | Supply and installation of Submersible Grinder Pump 1 HP LUBI/EQUT |
| 10 | OD33399/2025-2026:Supply and installation of Submersible Grinder Pump 1 HP LUBI/EQUT |
| 11 | Supply, Installation, testing and commissioning of Filter Feed Pump (7.5 HP) |
| 12 | OD33432/2025-2026:Supply, Installation, testing and commissioning of Filter Feed Pump (7.5 HP) |
| 13 | Supply, Installation, testing and commissioning of Motor LUBI/EQUT |
| 14 | OD33433/2025-2026:Supply, Installation, testing and commissioning of Motor LUBI/EQUT 3 PHASE 5 HP |
| 15 | Supply, Installation, testing and commissioning Sludge Pump (2 HP) 3 PHASE LUBI |
| 16 | OD33434/2025-2026:Supply, Installation, testing and commissioning Sludge Pump (2 HP) 3 PHASE LUBI |
| 17 | Supply installing ,testing and commissioning of Bar Screen (S.S) (40KG ) 304 SS STEEL (1*40000) 1 HR 10LTR-15LTR CAPACITY |
| 18 | OD33210/2025-2026:Supply installation, and commissioning of Bar Screen consisting of 304 SS STEEL, 1 HR 10LTR-15LTR CAPACITY |
| 19 | Supply and fill Media in Pressure Sand Filter |
| 20 | OD33613/2025-2026:Supply and fill Media in Pressure Sand Filter ,pebbles( silex 10mm,silex 6mm, and silex 4 mm) |
| 21 | Supply and Fill media in Activated Carbon Filter . |
| 22 | OD33615/2025-2026:Media Fill in Activated Carbon Filter |
| 23 | Supply and installation of MBBR Media (WHITE COLOUR) |
| 24 | OD33596/2025-2026:Supply and installation of MBBR Media (WHITE COLOUR) 60BAG - |
| 25 | Supply and fittings of various types of PVC,UPVC pipes ,Pipe fittings and suitable valves etc. to completemplet(not including installation and pipe line fittings of Dozing pump and tanks) |
| 26 | OD34309/2025-2026:Supply and installation of 4-inch PVC (6 Kg)with cost of pipe and all pipe fittings like bend, coupling etc, cost of valves, laying charges, transportation cost, any additional labour etc complete |
| 27 | OD34338/2025-2026:Supply and installation of 2-inch PVC (6 Kg)with cost of pipe and all pipe fittings like bend, coupling etc, cost of valves, laying charges, transportation cost, any additional labour etc complete |
| 28 | OD34339/2025-2026:Supply and installation of 1.5-inch PVC (6 Kg)with cost of pipe and all pipe fittings like bend, coupling etc, cost of valves, laying charges, |
| 29 | OD34341/2025-2026:Supply and installation of 2.5 " UPVC Pipe with cost of pipe and all pipe fittings like bend ,coupling etc.cost of valves ,laying charges, Transportation cost any additional labour etc. to complete |
| 30 | Supply of Electrical panel board with Relays, Timers, ELCB, MCB(6A,10A,16A & 20A ), 50A-DC Ammeter, Shunt DC, Push buttons, |
| 31 | OD34593/2025-2026:Supply of Electrical panel board with Relays, Timers, ELCB, MCB(6A,10A,16A & 20A ), 50A-DC Ammeter, Shunt DC, Push buttons, Indicators, Heat sink, 40A-Manual change over switch, Bridge diode 72Amps, Power connector, Contactor, Overload relay(0.9-1.5A & 3-5A) etc. complete |
| 32 | , fabrication, erection and including labour charge for pipe fittings of existing 98 KLD sewage water treatment plant |
| 33 | OD35136/2025-2026: fabrication, erection including labour charge for all pipe lines, pipe fittings etc. of existing 98 KLD sewage water treatment plant |
| 34 | cleaning of Existing tank |
| 35 | OD35137/2025-2026:Cleaning of the existing tank by removing the sewage and transferring the same to a convenient place for repairing works, including the cost of labour, hire charge of tools and plants etc, complete |
| 36 | Civil work (cement, brick, M-sand Psand, transportation, labour ) |
| 37 | OD35138/2025-2026:Civil work -cement,-10 bag brick-250 M-sand Psand,transportation,and labour ) |
| 38 | supply and installation of 2 inch PVC nylon watermeter and TOD meter |
| 39 | OD35139/2025-2026:SUPPLY AND INSTALLATION OF 2 INCH PVC NYLON WATER METER ANDTOD METER |
| 40 | Dismantling and stacking of old damaged equipment and handling charges (shifting /relocation ) of new electromechanical equipment |
| 41 | OD35140/2025-2026:Dismantling and stacking of old damaged equipment and Handling charges (shifting /relocation ) of new electromechanical equipment to the required locations in the plant during execution, including cost of labour, tools, and plants, etc, complete |
| 42 | Cost of painting-Surface preperation by hand and power tools .Epoxy Zinc Phosphate Primer -1 coatand Epoxy HB Finish -2 coats |
| 43 | OD39727/2025-2026:Cost of painting with 2 coats of Epoxy HB paint over 1 coat of Epoxy Zinc PhosphatePrimer after surface preparation by hand and power tool cleaning, including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc., complete as per the direction of department officers at the site |
| 44 | PVC Pipe and Fittings, Dry bed pipes SOLVENT SS SADDLE,BALL VALVE CANDULLA PIPE-20MM,SCREW 1.5,4 INCH PIPE FITTING ETC |
| 45 | OD35141/2025-2026:PVC Pipe and Fittings, Dry bed pipes SOLVENT SS SADDLE,BALL VALVE CANDULLA PIPE-20MM,SCREW 1.5,4 INCH PIPE FITTING ETC |
| 46 | Trial run and including Quality testing of outlet water, Transportation charges, Loading/Unloading charges, Insurance and other overhead charges |
| 47 | OD35142/2025-2026:Conducting Trial Run of the 98 KLD STP Plant, Quality testing of outlet water (Treated water) from the STP in a Pollution Control Board-approved laboratory to check whether it meets the PCB Standards, Transportation charges, Loading/Unloading charges, Insurance, and other overhead charges Please Enable Macros to View BoQ information |