| 1 | Providing Culvert and Paver block |
| 2 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B) |
| 3 | Earth cutting and sectioning and levellingincluding initial lead of 10m and initial llift of 2m in sand silt or other loose soil wet sand or silt not under water light black cotton soil sndy loam and ordinary soil including excavated earth etc. complete (TNBP No.20B) |
| 4 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) |
| 5 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 7 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) |
| 8 | Reinforced cement concrete 1:1½:3 (one cement and half sand and three aggregates) using 20mm ISS Hard broken granite stone jelly for Reinforced cement concrete works excluding cost of shuttering, and cost of reinforcement but including cost and conveyance of materials to work site, all labour charges and incidental charges for mixing and laying concrete,finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.30) |
| 9 | Supplying, fabrication and placing in position of steel reinforcement using mild steel (or) ribbed tar steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending rods, tieing into grills, placing in position etc., complete as directed by the departmental officers.( TNBP No: 15886) |
| 10 | Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers. |
| 11 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. Please Enable Macros to View BoQ information |