|
| 1 | Part-I: Smaller Pump |
| 2 | Transportation of diesel engineering pumping set/Electro-motor pumping set for Midi RLI of any make/brand with necessary fixture viz. MS bend MS pipe, rubber hose pipe, manifold, surge tank, foot valve, non-return valve, tail piece, hose clamp, sluice valve priming chamber etc. over pucca /Kancha road from sub- Divisional store to work site excluding loading at the lifting point and unloading at the delivery point. |
| 3 | A. For 6 nos diesel Engine (26HP),Carriage by road ,Distance upto 50KM |
| 4 | B. For 5 nos diesel Engine (26HP),Carriage by road ,Distance upto 50KM |
| 5 | C. For 5 nos Electro-motor (25HP) (a) Carriage by road (i) Distance upto 50KM |
| 6 | D. For 9 nos Electro-motor (20HP) (a) Carriage by road (i) Distance upto 50KM |
| 7 | Transportation of diesel engine-pumping set/Electro-motor-pumping set for Mini RLI of any make/brand with necessary fixture viz. MS bend MS pipe, rubber hose pipe, manifold, surge tank, foot valve, non-return valve, tail piece, hose clamp, sluice valve priming chamber etc. over pucca /Kancha road from sub- Divisional store to work site excluding loading at the lifting point and unloading at the delivery point. |
| 8 | A. For 24 nos diesel Engine (16HP) Carriage by road Distance upto 50KM |
| 9 | Loading of Diesel Engine and pumping set of 109 cubic metre per hour (m3/hr)capacity of any make/brand with necessary accessories and fixtures namely M.S. Bend, M.S. Pipes, Rubber Hose, Manifold, Surge Tank, foot valve, nonreturn valve, sluice valve etc. by any means into the following transport at liftingpoint having lead of 100 metres and unloading the same at destination and stacking the materials properly at a distance not exceeding 100 metre complete as per direction of Engineer-in-Charge. |
| 10 | A. For 6 nos 26HP diesel pumps (to & fro) |
| 11 | B. For 5 nos 26HP diesel pumps (to & fro) |
| 12 | Loading of Electro-motor pumping set of 180 cubic metre per hour (m3/hr)capacity of any make/brand with necessary accessories and fixtures namely M.S. Bend, M.S. Pipes, Rubber Hose, Manifold, Surge Tank, foot valve, nonreturn valve, sluice valve etc. by any means into the following transport at liftingpoint having lead of 100 metres and unloading the same at destination and stacking the materials properly at a distance not exceeding 100 metre complete as per direction of Engineer-in-Charge. |
| 13 | A. For 9 nos 20HP electric pumps (to & fro) |
| 14 | B. For 5 nos 25HP electric pumps (to & fro) |
| 15 | Loading of diesel engine and pumping set of 175 cubic metre per hour (m3/hr) capacity of any make/brand with necessary accessories and fixtures namely M.S. Bend, M.S. Pipes, Rubber Hose, Manifold, Surge Tank, foot valve, nonreturn valve, sluice valve etc. by any means into the following transport at liftingpoint having lead of 100 metres and unloading the same at destination and stacking the materials properly at a distance not exceeding 100 metre complete as per direction of Engineer-in-Charge. |
| 16 | For 24 nos 16HP diesel pumps (to & fro) |
| 17 | Hire charges of movable crane with fuel and manpower having load handling capacity upto 14 MT with the 45 deg moveable arrangement and the boom length 40 feets for loading and unloading of various materials /accessories of water supply works |
| 18 | A. for 10 nos Pump to & fro |
| 19 | Manpower charges for trial run and maintaining of diesel-engine/electric motor-operated pump sets, accessories Fitter. |
| 20 | Skilled |
| 21 | Semi-Skilled |
| 22 | Un-Skilled |
| 23 | Supply and pouring of diesel in diesel engine (for trial & commissioning) |
| 24 | Supply and pouring mobil in diesel engine (for trial & commissioning) |
| 25 | Part-II: Trolley-mounted large pump |
| 26 | Hiring of goods vehicle GVW upto 6 MT (excluding fuel) for Pump accessories |
| 27 | A. for 5 nos Pump to & fro |
| 28 | B. for 3 nos Pump to & fro |
| 29 | Half day charge extra for above said goods vehicle (excluding fuel) for more than 8 hrs of work per day |
| 30 | A. for 5 nos Pump to & fro |
| 31 | B. for 3 nos Pump to & fro |
| 32 | Fuel charge for above said veicles for serial number 10(a) and 10(b)… |
| 33 | A. for 5 nos Pump |
| 34 | B. for 3 nos Pump |
| 35 | Fuel charge for trial run |
| 36 | A. for 5 nos Pump |
| 37 | B. for 3 nos Pump |
| 38 | Hiring of tractor/breakdown van (excluding fuel) |
| 39 | A. for 5 nos Pump to & fro |
| 40 | B. for 3 nos Pump to & fro |
| 41 | Half day charge extra for above said tractor/breakdown van (excluding fuel) for more than 8 hrs of work per day. |
| 42 | A. for 5 nos Pump to & fro |
| 43 | B. for 3 nos Pump to & fro |
| 44 | Fuel charge for above said trucks for serial number 13(a) and 13(b)… |
| 45 | A. for 5 nos Pump |
| 46 | B. for 3 nos Pump |
| 47 | Hire charges of movable crane with fuel and manpower having load handling capacity upto 14 MT with the 45 deg moveable arrangement and the boom length 40 feets for loading and unloading of various materials /accessories of water supply works. |
| 48 | A. for 5 nos Pump to & fro |
| 49 | B. for 3 nos Pump to & fro |
| 50 | Extra for above said moveable crane beyond 8 hrs of working |
| 51 | A. for 5 nos Pump |
| 52 | B. for 3 nos Pump |
| 53 | Manpower charges for shifting, assemblying, de-assemblying etc.of pumps, accessories etc. |
| 54 | Skilled |
| 55 | Unskilled |
| 56 | Supply & Fixing of Spares of dewaterings pumps, Engines & motors for repair-maintenance purpose: |
| 57 | Pump Bush 6\\" |
| 58 | Pump Side Packing |
| 59 | Gland Packing |
| 60 | Pump Bearing 6\\" |
| 61 | Pump Bearing 4\\" |
| 62 | Tv2 Diesel Filter |
| 63 | Grease |
| 64 | Suction Flange 4\\" |
| 65 | Suction Flange 6\\" |
| 66 | Bearing Cover 6\\" |
| 67 | Fuel injector/Element Body Complete |
| 68 | Silencer (Tv) |
| 69 | Silencer Socket (Tv-2) |
| 70 | Silencer Flange elbow |
| 71 | Tank To Filter Pipe |
| 72 | Air Cleaner/ Filter(Big) |
| 73 | Air Cleaner/ Filter Tv1 |
| 74 | 4\\" Bend Pipe |
| 75 | 6\\" Bend Pipe |
| 76 | 4\\" Tail-piece Socket for bend |
| 77 | 6\\" Tail-piece Socket for bend |
| 78 | Starting Handle |
| 79 | Tank Clamp |
| 80 | Tank Bracket |
| 81 | Check Valves 4L |
| 82 | Check Valves 6L |
| 83 | Oil Seal |
| 84 | Air Clean Bend |
| 85 | Head Gasket |
| 86 | Air Cover |
| 87 | Diesel Tank 10L |
| 88 | Gear Belt |
| 89 | Gear Box Oil Seal |
| 90 | Pump coupling |
| 91 | 4\\" Foot Valve with Tail-piece complete |
| 92 | 6\\" Foot Valve with Tail-piece complete |
| 93 | 4\\" PVC joint socket |
| 94 | 6\\" PVC joint socket |
| 95 | 4\\" joint socket clamp |
| 96 | 6\\" joint socket clamp |
| 97 | 8\\" joint socket clamp |
| 98 | 4\\" Hose pipe |
| 99 | 6\\" Hose pipe |
| 100 | 8\\" Hose pipe |
| 101 | 4\\" Suction pipe |
| 102 | 6\\" Suction pipe |
| 103 | Pump trolley wheel |
| 104 | Pump chassis boby |
| 105 | U channel for pump lifting |
| 106 | Contactor MPR VMR etc. For electrical pump. |
| 107 | 4 core 25 sq. mm. Al. arm. Cable Please Enable Macros to View BoQ information |