| 1 | Excavation in soil (any type) using hydraulic ck 90 hydraulic excavator of 0.9 cum bucket capacity including cutting, and leading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30 mtr. |
| 2 | Excavation of soil using hydralic JCB and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and avg. lead 3 KM kucca. |
| 3 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications. |
| 4 | Dressing of Earthwork |
| 5 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth |
| 6 | Earthwork excavation in foundation and trenches |
| 7 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification |
| 8 | Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes. |
| 9 | Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer . |
| 10 | Shurrtring for faces of concrete lining on side side slops & bed complete in all respect as per design/drawing and pwd specifications. |
| 11 | Filling Contraction Joint with sealing compound complete in all respect |
| 12 | Filling expansion joint with Sealing Compound. complete in all respect |
| 13 | Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect. |
| 14 | Providing & laying 250 mm wide LDPE Film 150 micron over sleepers |
| 15 | Ordinary Jungle Clearance of both banks of running Disty,Minors and Drains including Boundary road with discharge upto 1.5 cumecs |
| 16 | Providing & Fixing Outlets (Non patrolling side) |
| 17 | Providing & Fixing Outlets (Patrolling side) |
| 18 | Dismantling brick work, tile masonry or tile lining (in cement mortar) |
| 19 | Laying Ist class burnt brick work laid in 1:4 with Cement sand mortar in foundation and plinth.@(as per CSR item no 11.7) |
| 20 | Racking and cleaning of joints on side slopes of brick lined channel. (CSR item No. 19.29) |
| 21 | 10 mm thick cement plaster 1:3 (CSR item no. 15.5) |
| 22 | Laying PCC 1:2:4 mixing by manual means.(CSR item no 10.13 ii). |
| 23 | Lifting of RCC Slab (Lumsum) |
| 24 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. (CSR Item No. 22.13) Please Enable Macros to View BoQ information |