| 1 | A) Erection Part |
| 2 | Erection of LT line. Digging of pit, erection of Steel pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 3 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 4 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. |
| 5 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., |
| 6 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 7 | Inspection fees for initial or peroodical inspection for LT Line |
| 8 | Providing manual carriage and transportation of departmental materials from Central Store to the work site by the contractor at his own arrangement, including loading, unloading, handling, stacking, labour, tools & plants, transportation vehicles, fuel, watch and ward, and all other incidental charges complete in all respects as directed by the Engineer-in-Charge. |
| 9 | ERECTION PART 11/0.4kV,63 KVA Sub-Station |
| 10 | rection of 63 kVA, 11/0.4 kV Distribution Transformer in place of existing 25 kVA Distribution Transformer by augmentation of the existing Sub-Station on the old structure, including dismantling of the existing transformer, lifting, mounting, fixing, connection of HT/LT jumpers, earthing connections, oil level checking, testing, commissioning, and all labour, tools & plants, tackles, consumables, and incidental charges required for complete and satisfactory execution of the work as directed by the Engineer-in-Charge |
| 11 | Dismantling of the existing Distribution Transformer (DTR) from its location, including disconnection of HT/LT jumpers, removal of transformer from supporting structure/plinth, lowering, handling, shifting to a safe place as directed by the Engineer-in-Charge, and all labour, tools & plants, tackles, transportation within site, safety precautions, and other incidental charges required for completion of the work, complete in all respects. |
| 12 | Providing manual carriage and transportation of departmental materials from Central Store to the work site by the contractor at his own arrangement, including loading, unloading, handling, stacking, labour, tools & plants, transportation vehicles, fuel, watch and ward, and all other incidental charges complete in all respects as directed by the Engineer-in-Charge. |
| 13 | Inspection fees for initial or peroodical inspection for 11/0.4kv,63 kva Sub-Station. |
| 14 | SUPPLY PART. LT Line |
| 15 | Steel Pole 8 mtr. Long. |
| 16 | AAAC 7/3.15 mm2 Conductor |
| 17 | GI Wire |
| 18 | RCC Muff |
| 19 | Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr] |
| 20 | Full Clamp |
| 21 | Half Clamp for Cross Arm |
| 22 | Nut and Bolts |
| 23 | Shackle Insulator with D-Iron |
| 24 | Earth Hook/Eye Hook Bolt |
| 25 | Stay Set Complete (i/c stay clamp) |
| 26 | Stay Wire (7/3.15mm) (6.0 kg per stay set) |
| 27 | Earthing Set Complete (preferbly coil earthing) |
| 28 | Aluminium Paint |
| 29 | Red Oxide |
| 30 | Supply PART 11/0.4kV,63 KVA Sub-Station |
| 31 | Distribution Transformer (Ordinary) 11/0.4 KV, 63KVA |
| 32 | Re-Earthing with Earthing Set |
| 33 | LT Distribution Panel Box with MCCB (100A, 3P,35ka) ICS=100% ICU,KIT-KAT-200AMP for 63 kva DTR |
| 34 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 35 | LT Cable (3.5 Core) 70 mm² |
| 36 | Providing and laying Cement Concrete 1:2:4 ( 1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete including cost of form work and others material to used. For 2 pole str. And DTR Str. |
| 37 | Providing and Fixing wooven mesh fencing along with Gate & locking arrangement (for more detail check attached drawing and measurement detail) |
| 38 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. |
| 39 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) |
| 40 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) |
| 41 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. wherever required, all complete In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 42 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge Made of G.I. wire of dia 4 mm |
| 43 | Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete 100x58x1.90 mm |
| 44 | Providing and fixing ISI markedoxidisedM.S. sliding door bolts with nuts and screws etc. complete : 250x16 mm Please Enable Macros to View BoQ information |