| 1 | Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 2 | S.T. Pole 11 mtr long |
| 3 | PCC Pole 11 mtr long |
| 4 | PCC Pole 8.5 mtr long |
| 5 | ACSR Weasal Conductor |
| 6 | ACSR Rabitt Conductor |
| 7 | 11 KV XLPE Cable of size 3x185 sqmm |
| 8 | I/D Cable Jointing Kit 11 KV 3x185 sq mm |
| 9 | O/D Cable Jointing Kit 11 KV 3x185 sq mm |
| 10 | MS Top channel |
| 11 | MS Dropper channel 100x50x2028 mm |
| 12 | MS Channel 125x65x1300mm (T-off) |
| 13 | 11 KV Polymeric Pin Insulator |
| 14 | 11 KV Polymeric Disc Insulator T&C Type |
| 15 | 11 KV Disk Fittings T&C Type |
| 16 | 11 KV V-Type Steel Cross Arm |
| 17 | 11 KV VCB O/G CTR 200/100/5A, 350 MVA |
| 18 | MS earthing rod of 20x2500mm & 6 swg earthing wire etc. |
| 19 | 11 KV Stay set 16x1800 mm |
| 20 | Stay Wire (3.15 mm) 7/10 swg |
| 21 | Supply And Erection of Fallowing Material |
| 22 | Stay Clamp with N&B |
| 23 | Stay Insulator |
| 24 | F-bracket with N&B |
| 25 | P.G. Clamp |
| 26 | G.I. Pipe 6'' dia |
| 27 | HDPE Pipe 120 mm |
| 28 | Shocket of HDPE Pipe for Jointing |
| 29 | Clamp with Nuts & Bolts for top & dropper Channels |
| 30 | Cross Arm holding clamp with bolts & nuts |
| 31 | All. Paint |
| 32 | Red Oxide Paint |
| 33 | Danger Board with clamp and N&B |
| 34 | Bolt & Nut all size |
| 35 | E Bracket with N&B |
| 36 | MS Angle Iron 65x65x6 mm, 2700 mm long bracing with 4 clamp |
| 37 | Erection of Single pole (11 KV) PCC 8.5 /STP 11 Mtr/PCC 11 Mtr including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 38 | Erection of Double Pole (11 KV) PCC 8.5 /STP 11 Mtr/PCC 11 Mtr including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 39 | Fabrication/ Modifications of MS Items as per requirement of site conditions. |
| 40 | Earthing of PCC/STP poles as per RESPO norms |
| 41 | Grouting of Pole as per RESPO Norms with grouting materials. |
| 42 | Making of Pole Plinth (Muffing) as per RESPO Norms (All the required materials for above job shall be provided by contractor) |
| 43 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 44 | Making T-off arrangement including fabrication & fitting of accessories. |
| 45 | Mounting of cable box Indore/Outdoor 3X185 sq mm |
| 46 | Laying of 11 kv xlpe Double circuit Cable 3x185 sq mm with Drill Machine With the help of HDPE Pipe (HDD method ) |
| 47 | Laying stringing and sagging of O/H Three Phase 11 KV Line by ACSR Weasal Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 48 | Laying stringing and sagging of O/H Three Phase 11 KV Line by ACSR Rabbit Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 49 | Installation of 11 kv VCB |
| 50 | Dismantling of old & jarjar pole |
| 51 | Dismantling of existing old O/H 11 KV Line including rolling back its conductor/G.I. wire from work site to dump site. |
| 52 | Scrubbing, rubbing, cleaning and painting of single & double poles structure, one coat with red oxide and two coats of aluminium paints (ISI mark paint) |
| 53 | Fixing of Danger Board with clamps and N&B as per RESPO Norms. |
| 54 | Chopping of Tree Braches falling on the line |
| 55 | Re-positioning of existing Tilled PCC/ST Pole with grouting |
| 56 | Safe Carriage of Scrap Iron from dump site to ESC Unnao with loading, unloading and proper stacking. |
| 57 | Safe Carriage of old and jarjar conductor/GI Wire from dump site to ESC Unnao with loading, unloading and proper stacking. Please Enable Macros to View BoQ information |