| 1 | Safe Loading carriage & unlo-ading of following material from central store to JE Store/work site |
| 2 | ST pole 11/9 mtr |
| 3 | 11/0.4 KV 250KVA T/F |
| 4 | 11/0.4 KV 100KVA T/F |
| 5 | LT Cable 1x240/ 400 mmsq |
| 6 | 11KV XLPE Cable 3x70 sqm |
| 7 | 11KV XLPE Cable 3x120/-70 sqmm Termination Kit |
| 8 | 11KV Polymer Insulator |
| 9 | 11KV Disc Insulator |
| 10 | ABC Cable 3x120/95/50/25sqmm-- |
| 11 | Weasel conductor- |
| 12 | Safe Carriage of 9/11 Mtr ST pole/PCC Pole from Dump site to pit site |
| 13 | Safe Carriage of 11/0.4 KV T/F from Dump site to pit site |
| 14 | Fabrication errection of sub station type double pole on ST pole along with fixing of necessary clamp ,accessories required including supply and fixing of MS channel on top dropper with arrangement of fixing of 3 Nos pin insulator as per respo specification ,making 11 KV Busbar by single core PVC .Only pole and pin with insu-lator clamp nutbolt provided by department |
| 15 | Errection of ST Pole binding of LT Section Line Accesories |
| 16 | Laying of LT Cable 1x240/400/630 sqmm with suitable size of Al lug all material provide by depart-ment |
| 17 | Hoisting of LT Cable on pole requied size clamping on pole only cable provided by department 5 |
| 18 | Proper Jumpering of LT Cable on O/H Line 2500 |
| 19 | Making 11KV Bus bar on newly erected Double pole and tapping of 11KV line 5 |
| 20 | Prepare proper space for construction of plinth |
| 21 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cement and course sand fiiling of structure completely as per norms with RCC Top 1:2:2 cement sand and course sand stone gritt with MS bar and MS chaanel for resting of T/F.All material provide by contractor exept T/F |
| 22 | Fabrication and fixing of wiremesh fencing around the11/0.4KV T/F and DP Box made as per require-ment 2mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremesh on it 50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support,groutin properly by cement concrete and course sand all material provided by contractor |
| 23 | Painting of wiremesh Fencing with 2 coat of Red oxide and two coat of Green enamel paint Green Enamel Paint |
| 24 | Fabrication and fixing of DP box stand made of MS Angle ,grouting and plinthing of the same all material provided by contractor |
| 25 | Fabrication and fixing of Metalic Distribution Pillar box on stand with Nut bolt made of 20 SWG BP Sheet with door 18 SWG BP Sheet ,with fixing of 2 Nos MS Angle for mounting of Fuse unit then fixing of fuse unit 500 Amp 650 Volt and 3 Nos copper Bus Bar and 1 No Al Busbar all material arrange by contractor |
| 26 | earthing of Pipe type with 60 feet deep boring and provid-ing jindal make pipe \\"B\\" class 1\\" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe |
| 27 | Laying of 11 KV cable 3 x70 sqmm in pukka road by digging of trench upto 1 Mtr Deep putting cable boxing with bricks and sand refilling of earth and proper ramming |
| 28 | Laying of 11 KV cable 3 x70 sqmm in pukka road Double circuit by digging of trench upto 1 Mtr Deep putting cable boxing with bricks and sand refilling of earth and proper ramming |
| 29 | Hoisting of cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole |
| 30 | High pressure testing of 11KV Cable by high pressure equipment |
| 31 | Proper jumpering of cable both side with supply system |
| 32 | Errection and commissi-oning of AB Conductor of size 3x120/95/50/25sqmm |
| 33 | Supply and fixing of clamps |
| 34 | Holding clamp |
| 35 | T/F Base Channel |
| 36 | LT Clamp for pole with GI Strip and schckle insulator |
| 37 | Crimping Al Lugs 240/400/630 sqmm |
| 38 | Copper L-Piece for T/F |
| 39 | Nutbolts off size |
| 40 | Danger board with clamp and Barbed wire |
| 41 | Sundry Item |
| 42 | Pipe and cable holding clamp |
| 43 | Ordinary Earthing by MS Earth rod2500 mm long by GI wire upto top channel all material provide by Contractor |
| 44 | Fixing and installation of 11KV / O/D type XLPE Jointing Kit ,olny jointing kit provide by department |
| 45 | Providing fabrication and fixing of DO Fuse set |
| 46 | Providing Fabrication and fixing of 11KV TPMO Set AB Switchwith GI Pipe and Handle |
| 47 | Grouting of pole by cement course sand and brick ballast Civil material provided by Contractor |
| 48 | Painting of ST pole by 2 coat of red oxide and 2 coat of Al paint Paint provided by contractor |
| 49 | Safe installation of 11/0.4 KV 250 KVA T/F its connection from 11KV line and LT line Labour &T&P Proviede by contractor |
| 50 | Safe installation of 11/0.4 KV 100 KVA T/Fon Double Pole proper Lockin with MS Angle its connection from 11KV line and LT line Labour &T&P Provided by contractor |
| 51 | Fabrication and fixing of LT Busbar for 100 KVA T/F Connect with incoming and outgoing Cables 18000 GST will be paid extra as per rule. Please Enable Macros to View BoQ information |