| 1 | Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 2 | S.T. Pole 11 mtr long |
| 3 | PCC Pole 11 mtr long |
| 4 | PCC Pole 8.5 mtr long |
| 5 | Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, diff. Channel & Angle, distribution box, x-arm, etc. from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 6 | Diff. Conductor for 11 KV Line |
| 7 | Three Phase A.B. Cable of diff. size |
| 8 | 11 KV XLPE Cable of size 3x300 sqmm |
| 9 | 11 KV XLPE Cable of size 3x185 sqmm |
| 10 | O/D Cable Jointing kit 3x300 sqmm |
| 11 | S/TH Cable Jointing kit 3x300 sqmm |
| 12 | I/D Cable Jointing Kit 11 KV 3x185 sq mm |
| 13 | O/D Cable Jointing Kit 11 KV 3x185 sq mm |
| 14 | S/th Cable Jointing Kit 11 KV 3x185 sq mm |
| 15 | Dismantling of existing old O/H 11 KV Line including rolling back its conductor/G.I. wire from work site to dump site. |
| 16 | Dismantling of existing old O/H LT Line including rolling back its conductor/G.I. wire from work site to dump site. |
| 17 | Dismantling of existing old Pole and X-arms, brackets, Insulators, Channels and all hardware fittings. |
| 18 | Erection of ST Double pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 19 | Supply & Fixing of following materials for above job- |
| 20 | Clamp for Top & Dropper channel, bracing angle etc. with N&B |
| 21 | Erection of PCC 11 Mtr Double pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 22 | Supply & Fixing of following materials for above job- |
| 23 | Clamp for Top & Dropper channel, bracing angle etc. with N&B |
| 24 | Erection of ST Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 25 | Supply & Fixing of following materials for above job- |
| 26 | 11 KV F-Clamp with N&B |
| 27 | Cross Arm Holding Clamps |
| 28 | Erection of PCC 11 Mtr Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 29 | Supply & Fixing of following materials for above job- |
| 30 | 11 KV F-Clamp with N&B |
| 31 | Cross Arm Holding Clamps |
| 32 | Erection of PCC 11 Mtr Single Pole (11 KV) including digging of pits, fitting of all accessories (03 Nos. X-arm at each pole, insulators etc. as required for making of double Ckt HT Line) along with cartage & dragging from dump site to pit site including all associated work. |
| 33 | Supply & Fixing of following materials for above job- |
| 34 | Cross Arm Holding Clamps |
| 35 | Erection of PCC 8.5 Mtr Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 36 | Supply & Fixing of following materials for above job- |
| 37 | 11 KV F-Clamp with N&B |
| 38 | Cross Arm Holding Clamps |
| 39 | Erection of PCC Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 40 | Supply & Fixing of following materials for above job- |
| 41 | Suspension Clamp for ABC |
| 42 | Dead End Clamp for ABC |
| 43 | Eye Hook |
| 44 | L.T. Clamp with Nuts & Bolts |
| 45 | Making T-off arrangement including fabrication & fitting of accessories. |
| 46 | Supply & Fixing of following materials for above job- |
| 47 | Holding clamp for T-off Channel with N&B |
| 48 | Grouting of ST/PCC Pole as per RESPO Norms with grouting materials. |
| 49 | Making of Pole Plinth (Muffing) as per RESPO Norms (All the required materials for above job shall be provided by contractor) |
| 50 | Earthing as per RESPO Norms. |
| 51 | Stringing and sagging of 2 wire of 6 SWG GI wire for guarding and making lacing at one meter part in all span between all support including carriage from dump site to pit site with complete all work as required. |
| 52 | Supply & Fixing of following materials for above job- |
| 53 | Holding clamp for Guarding Angle with N&B |
| 54 | Eye bolts for guard wires |
| 55 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 56 | Supply & Fixing of following materials for above job- |
| 57 | Stay Clamp with N&B |
| 58 | Stay Insulator |
| 59 | Laying stringing and sagging of O/H 11 KV Line Three Phase by Conductor including all associated work with joint/jumpers and binding of insulator as required. |
| 60 | Supply & Fixing of following materials for above job- |
| 61 | P.G. Clamp |
| 62 | Laying of underground 11 KV XLPE Cable of size 3x300 sq mm by drilling (HDD method) including laying of HDPE Pipe as per RESPO Norms with complete all work as required. (All the required materials for above job shall be provided by contractor except 11 KV XLPE Cable size 3x300 sq mm) |
| 63 | Supply & Fixing of following materials for above job- |
| 64 | HDPE Pipe 120 mm |
| 65 | Shocket of HDPE Pipe for jointing |
| 66 | Fixing of O/D Jointing Kit for 11 KV XLPE Cable size 3x300 sq mm with complete all work as required. |
| 67 | Fixing of S/TH Jointing Kit for 11 KV XLPE Cable size 3x300 sq mm with complete all work as required. |
| 68 | Commissioning of 11 KV XLPE Cable of size 3x300 sq mm including jumpering with the system. (All the required materials for above job shall be provided by contractor) |
| 69 | Laying of underground 11 KV XLPE Cable of size 3x185 sq mm by drilling (HDD method) including laying of HDPE Pipe as per RESPO Norms with complete all work as required. (All the required materials for above job shall be provided by contractor except 11 KV XLPE Cable size 3x185 sq mm) |
| 70 | Supply & Fixing of following materials for above job- |
| 71 | HDPE Pipe 120 mm |
| 72 | Shocket of HDPE Pipe for jointing |
| 73 | Fixing of I/D Jointing Kit for 11 KV XLPE Cable size 3x185 sq mm with complete all work as required. |
| 74 | Fixing of O/D Jointing Kit for 11 KV XLPE Cable size 3x185 sq mm with complete all work as required. |
| 75 | Fixing of S/TH Jointing Kit for 11 KV XLPE Cable size 3x185 sq mm with complete all work as required. |
| 76 | Commissioning of 11 KV XLPE Cable of size 3x185 sq mm including jumpering with the system. (All the required materials for above job shall be provided by contractor) |
| 77 | 11 KV Cable Hosting including jumpering etc. complete work with help of G.I. Pipe as per RESPO Norms (G.I. Pipe and other required material shall be provided by the contractor) |
| 78 | Laying stringing and sagging of O/H Three Phase L.T. Line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required. |
| 79 | Supply & Fixing of following materials for above job- |
| 80 | Suspension Clamp for ABC |
| 81 | Dead End Clamp for ABC |
| 82 | Eye Hook |
| 83 | L.T. Clamp with Nuts & Bolts |
| 84 | Piercing Connector |
| 85 | PG Clamp |
| 86 | Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box) |
| 87 | Supply & Fixing of following materials for above job- |
| 88 | Clamp for Distribution Box with nut & bolt |
| 89 | Piercing Connector |
| 90 | Chopping of Tree Branches falling on the line |
| 91 | Re-sagging of existing loose conductor including Re-Jumpering, replacement of damaged accessories (F-clamp, X-arm, holding clamps, Channels, Insulator etc.) as required along with all associated work. |
| 92 | Repositioning of existing tilted PCC/ST pole with grouting |
| 93 | Scrubbing, rubbing, cleaning and painting of single & double poles structure, one coat with red oxide and two coats of aluminium paints (ISI mark paint) |
| 94 | Supply & Fixing of Danger Board with clamps and N&B as per RESPO Norms. |
| 95 | Safe Carriage of Scrap Iron from dump site to ESC Unnao with loading, unloading and proper stacking. |
| 96 | Safe Carriage of old and jarjar conductor from dump site to ESC Unnao with loading, unloading and proper stacking. Please Enable Macros to View BoQ information |