| 1 | Site Clearance with clearing jungle including uprooting of vegetation grass, bush wood trees and sapling of girth up to 30 cm I/C all complete |
| 2 | Boring of pile hole 200 mm diameter ,3.00 m deep with single under reamed of 500 mm diameter I/c all complete. as S.I. no.New item-1 page no-38 |
| 3 | R.C.C. work in 1:1½:3 cement, coarse sand and 20mm gauge stone grit including all complete for pile , capping beam |
| 4 | Class-150 brick work in 1:6 cement & coarse sand mortar in Plinth level I/c all complete |
| 5 | Laying C.C in 1:4:8 with cement, coarse sand & 22.4-53mm stone ballast in under floor & foundation I/c all complete as directed by engineer in charge |
| 6 | Class-150 brick work in 1:6 cement & coarse sand mortar in supersturecture I/c all complete as directed by engineer in charge |
| 7 | Stone tile work for wall lining upto 10 m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement with an admixture of pigment to match the stone shade. |
| 8 | R.C.C. work in 1:1½:3 cement, coarse sand and 20mm gauge stone grit for lintel & sunshed I/c all complete as |
| 9 | R.C.C. work in 1:1½:3 cement, coarse sand and 20mm gauge stone grit for column,T beam I/c all complete as directed by engineer in charge |
| 10 | M.S. or iron work (Tore or plain bar) in plain work such as R.C.C. /R.B. work I/c all complete as directed by engineer in charge |
| 11 | Providing and fixing angle iron Gate and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge. |
| 12 | 12 mm thick plaster with 1:6 cement fine sand mortar on fair side of wall I/c all complete as directed by engineer in charge |
| 13 | 15 mm thick plaster with 1:6 cement fine sand mortar on rough surface of wall I/c all complete as directed by engineer in charge |
| 14 | Providing and applying Plaster of Paris Putty of 1mm Thickness over plastered surface to prepare the surface even and smooth complete. |
| 15 | Finishing of wall with water proof cement paint on new work with two coat to given shade I/c all complete as directed by engineer in charge |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations etc. as DSR 2023 S.I. no. - 5.9.1 |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams as DSR 2023 S.I. no. - 5.9.5 |
| 18 | Centering and shuttering including strutting, propping etc. and removal of form for Columns. as DSR 2023 S.I. no. - 5.9.6 |
| 19 | Laying C.C.1:5:10 (1 cement: 5 fine sand :10 stone aggregate 40 mm) |
| 20 | Providing and laying factory made chamfered edge Cement Concrete paver blocks 80mm thick in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness &size/ shape, made by table vibratory method using PU mould, laid in required colour &pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. |
| 21 | Providing & Fixing of Sign board i/c all comp. |
| 22 | S/F of RCC Bench at Site (3 Seater) Please Enable Macros to View BoQ information |