|
| 1 | Clearing grubbing shrub light jungles and uprooting stumps and small bushes and trees of below 1 meter grithon pre measurement including removal of debris (covered with plants 30cm girth and open space less than 50% to 70%) and disposing the same away from work site with all leads and lifts etc. Complete in all respect as directed by the Engineer-in-charge. |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil with initial lead of 50mtr and 1.5m initial lift including rough dressing and breaking clods to maximum 5 to 7 cm size and laying in layers not exceeding 0.30m depth & levelling and dressing the bed including dewatering if required etc. complete in all respect as per direction of engineer in charge. |
| 3 | Filling foundation and plinth with sand including well watered and rammed etc. complete with cost, conveyance, royality of sand including all labour, T & P, Labour welfare cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. |
| 4 | Cement concrete M-15 grade with 20mm and down graded hard broken chips(crusher broken) of approvedd quality,quarried and free from weathered skins including hoisting,laying concrete in position to proper slopes and level, compacting and ramming in layers not excedding 15cm in depth and finishing the exposed surface smooth,providing beads or grooves where necessary with watering and making arrangement for carriage of water, curing for required time, shuttering if required including all cost,conveyance, royalty and other taxes of all materials etc. complete as directed by the Engineer-in Charge. |
| 5 | R.C.C M-20 grade with 20mm and down graded hard broken chips(crusher broken) of approvedd quality,quarried and free from weathered skins including hoisting,laying concrete in position to proper slopes and level, compacting and ramming in layers not excedding 15cm in depth and finishing the exposed surface smooth,providing beads or grooves where necessary with watering and making arrangement for carriage of water, curing for required time, shuttering if required including all cost,conveyance, royalty and other taxes of all materials etc. complete as directed by the Engineer-in Charge. |
| 6 | Supplying, fitting and placing the HYSD bars including over lapping and binding were including all cost and carrige etc. complete for straighteninh, cutting , bending, binding and tying the grills and placing in position for fabrication and fixing of reinforcement including lapping where necessary including supply of binding wire with all leads, lifts from bending yard to placement spot including cost of steel bars of any reinforcement as directed by the Engineer-in-charge. |
| 7 | Providing weep holes in Brick masonry / Plain/ Reinforced cement concrete abutment, wing wall/ return wall with 100 mm dia A.C. PVC pipe, extending through the full width of the structure with slope of IV-20H towards drawing face complete as per drawing and technical etc.complete in all respect as directed by the Engineer in Charge |
| 8 | Providing rigid smooth centering and shuttering for R.C.C. works to all heights including false work and dismentaling then after casting and curing for required time including depositing the debrices, clear of work site with all leads and lifts etc. complete with all cost, conveyance, royality and other taxes of charge. |
| 9 | Rough stone dry packing in aprons revertments to all heights & slope with hard stones other than granites of 15cm to 30 cm size (weighting 140 Ibs per cft. And above) quarried and free from weathered skins and of approved quality including filling the interstices with small stones and finishing to proper slope and level with cost, conveyance, royality and other taxes of all materials required for the work etc. complete in all respect as directed by the Engineer-in-charge. (1/6th volume will be deducted towrds viods). |
| 10 | Earth work in hard soil with initial lead of 50mtr and 1.5m initial lift including rough dressing and breaking clods to maximum 5 to 7 cm size and laying in layers not exceeding 0.30m depth & levelling and dressing the bed including dewatering if required etc. complete in all respect as per direction of engineer in charge. Please Enable Macros to View BoQ information |