| 1 | Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc. complete and as per direction of Engineer-in-charge. |
| 2 | Dismantling of Prestressed / Reinforced cement concrete grade M-20 & above including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres etc. complete as per Clause No. 202 of Section 200 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 3 | Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 4 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 5 | Providing compacted shoulder with granular materials by using moorum & sand admixture of approved quality. watering and compacting with vibratory roller to achieve the required density in OMC complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 6 | Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 7 | Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge |
| 8 | Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge |
| 9 | Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge |
| 10 | Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge.a) For Road Work |
| 11 | b) For Mastic Asphalt |
| 12 | Providing and laying dense graded bituminous macadam using crushed stone of Grade-II aggregate with batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade (VG-30 Grade) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per clause No. 505 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per specification & direction of the Engineer-in-charge. |
| 13 | Providing and laying bituminous concrete using crushed stone of Grade-II aggregate with batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen (VG-30 grade) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per Clause No.507 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, taxes, cess, royalty etc complete in all respect and as per specification & direction of the Engineer-in-charge. |
| 14 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 15 | Providing and fixing of retro-reflectorised cautionary. mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting, 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67.i) 90cm Equilateral triangle |
| 16 | ii) 80cm x 60 cm Facility Information sign |
| 17 | iii) 90 cm High Octagon |
| 18 | iv) 30cm x 90 cm Hazard Marker |
| 19 | v) 60cm x 50 cm Chevron |
| 20 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 21 | Removing all types of hume pipe upto 600 mm dia including earthwork and dismantling of masonry works including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 22 | Earthwork in excavation for roadway in ordinary rock by mechanical means with 0.9 Cum bucket capacity Hydraulic Excavator including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000m, trimming bottom and side slopes in accordance with requirment of lines, grades and cross sections complete in all respect as per approved drawing and technical specifications as per Clause 301 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 23 | Providing, filling Clean Sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost, conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 24 | Providing and laying Plain cement concrete of grade M-15 in foundation as levelling course of CD works etc using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 including formwork as per Section 900,1000,1500, 1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.a) Foundation for Pipe Culvert Head Wall, Box Culvert, Drain, Toe wall, Retaining wall |
| 25 | Providing P.C.C M-20 (Using Branded Cement) grade with 40mm and down grade hard granite (crusherbroken) aggregate including hoisting and laying in open foundation/substructure of Abutment,Pier,Wing wall/ Return wall, Cutoff wall,Rigid Apron, Toe Wall etc. of C.D. work or in places as shown in the drawing as per approved drawing & section 900,1000,1500, 1700,2100,2200,2300 of MoRT&H specification for Road & Bridge works (5th Revision) including dewatering, centering and shuttering, cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.a) Substructure of Pipe Culvert, Box Culvert, Toe wall |
| 26 | Providing & Laying of NP4 Hume pipe of following diameters for pipe culverts as per approved drawing and technical specifications as per Section 2900 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.a) 1000 mm dia HP |
| 27 | Providing and laying of filter media using 45 mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 28 | Rough stone dry packing in aprons and revetments with hard granite stone of size 30 cm and above as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 and 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 29 | Providing and laying R.C.C M-25 grade in foundation of CD works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge |
| 30 | Providing and laying R.C.C M-25 grade in sub-structure of CD works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge |
| 31 | Providing and laying R.C.C M-25 grade in super-structure of CD works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge |
| 32 | Supplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS: 1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900,1000, 1600, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 33 | Providing & fixing in position RCC Crash barrier monolithic with slab M-40 grade as per approved drawing and technical specifications as per clause 809, section 800 & 1000 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete and as per direction of Engineer-in-Charge. |
| 34 | Gravel backing to aprons & revetments and providing filter material using gravel underneath pitching in slopes as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 35 | Providing weep holes in abutment, wing wall, retaining wall toe wall and RCC drain etc with 100mm dia AC pipe as per approved drawing and technical specifications complete in all respect as per Section 900, 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 36 | Providing and laying 25 mm thick Mastic Asphalt Wearing Course with paving grade bitumen meeting the requirments given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 12.2 mm nominal size @ 0.005 cum per 10 sqm and at an apporoximate spacing of 10cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 100 dehree centigrade, protruding 1 mm to 4mm over mastic surface all complete as per Clause 515 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 37 | Providing and fixing Drainage Spouts in deck slab with 1.00m long and 100 mm diameter G.I pipe for finished item of work as per approved drawing and technical specifications complete in all respect as per section 2700 & Clause 2705 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 38 | Painting two coats with Synthetic Enamel Paint of approved quality and shade over a coat of primer (Red Oxide Primer) on any elevation, kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 39 | Providing and laying R.C.C M-20 grade in base of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P royalty etc complete and as per direction of Engineer-in-Charge. |
| 40 | Providing and laying R.C.C M-20 grade in walls of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P royalty etc complete and as per direction of Engineer-in-Charge. |
| 41 | Providing and laying R.C.C M-20 grade in cover of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P royalty etc complete and as per direction of Engineer-in-Charge. |
| 42 | 1st year Maintenancei) Maintenance like (Repair of Potholes, Cracking, Rutting, Bleeding, Edge Deformation, Corrugation and Shoving of pavement).ii) Repair of Embankment / Slope like (Repair to slope of Camber, Edge drop of Shoulder, Embankment Protection, Rain Cuts).iii) Repair of CD structure and Drain like (Vent clearance, Leak proof expansion Joint, Repair of Drainage Spouts, Desilting of Culverts and Drains, Repair of Parapet, crash Barrier).iv) Repair of Road Protection structures. along with all the emergency works following the extant guidelines and as per direction of the Engineer-in-Charge (E.I.C). No payment shall be made during the 1st year maintenance period.2nd year Maintenancei) Maintenance like (Repair of Potholes, Cracking, Rutting, Bleeding, Edge Deformation, Corrugation and Shoving of pavement).ii) Repair of Embankment / Slope like (Repair to slope of Camber, Edge drop of Shoulder, Embankment Protection, Rain Cuts).iii) Repair of CD structure and Drain like (Vent clearance, Leak proof expansion Joint, Repair of Drainage Spouts, Desilting of Culverts and Drains, Repair of Parapet, crash Barrier).iv) Repair of Road Protection structures. along with all the emergency works following the extant guidelines and as per direction of the Engineer-in-Charge (E.I.C). |
| 43 | 3rd year Maintenance i) Maintenance like (Repair of Potholes, Cracking, Rutting, Bleeding, Edge Deformation, Corrugation and Shoving of pavement).ii) Repair of Embankment / Slope like (Repair to slope of Camber, Edge drop of Shoulder, Embankment Protection, Rain Cuts).iii) Repair of CD structure and Drain like (Vent clearance, Leak proof expansion Joint, Repair of Drainage Spouts, Desilting of Culverts and Drains, Repair of Parapet, crash Barrier).iv) Repair of Road Protection structures. along with all the emergency works following the extant guidelines and as per direction of the Engineer-in-Charge (E.I.C). |
| 44 | 4th year Maintenancei) Maintenance like (Repair of Potholes, Cracking, Rutting, Bleeding, Edge Deformation, Corrugation and Shoving of pavement).ii) Repair of Embankment / Slope like (Repair to slope of Camber, Edge drop of Shoulder, Embankment Protection, Rain Cuts).iii) Repair of CD structure and Drain like (Vent clearance, Leak proof expansion Joint, Repair of Drainage Spouts, Desilting of Culverts and Drains, Repair of Parapet, crash Barrier).iv) Repair of Road Protection structures. along with all the emergency works following the extant guidelines and as per direction of the Engineer-in-Charge (E.I.C). |
| 45 | 5th year Maintenance i) Maintenance like (Repair of Potholes, Cracking, Rutting, Bleeding, Edge Deformation, Corrugation and Shoving of pavement).ii) Repair of Embankment / Slope like (Repair to slope of Camber, Edge drop of Shoulder, Embankment Protection, Rain Cuts).iii) Repair of CD structure and Drain like (Vent clearance, Leak proof expansion Joint, Repair of Drainage Spouts, Desilting of Culverts and Drains, Repair of Parapet, crash Barrier).iv) Repair of Road Protection structures.along with all the emergency works following the extant guidelines and as per direction of the Engineer-in-Charge (E.I.C). Please Enable Macros to View BoQ information |