| 1 | Supply and laying and taking down, XLPE insulated PVC sheathed, armoured, heavy duty, aluminium conductor electric cable 1100 Volt grade of 10 Sqmm 2 core in duct/floor/wall with provision of saddle and lugs, etc including taking down of old one, complete all as specified and directed . |
| 2 | All as per serial item No 01, here-in-before but for size 10 Sqmm 4 core complete all as specified and directed . |
| 3 | All as per serial item No 01, here-in-before but for size 16 Sqmm 4 core complete all as specified and directed . |
| 4 | All as per serial item No 01, here-in-before but for size 35 Sqmm 3.5 core complete all as specified and directed . |
| 5 | All as per serial item No 01, here-in-before but for size 70 Sqmm 3.5 core complete all as specified and directed . |
| 6 | All as per serial item No 01, here-in-before but for size 95 Sqmm 3.5 core complete all as specified and directed . |
| 7 | All as per serial item No 01, here-in-before but for size 120 Sqmm 3.5 core complete all as specified and directed . |
| 8 | All as per serial item No 01, here-in-before but for size 185 Sqmm 3.5 core complete all as specified and directed . |
| 9 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre depth and getting out in soft / loose soil for takinig down the existing under ground cable and rectify the cable fault, phase fault etc, and relaying the same location after rectfy the fault, complete all as specified and directed . Note :- Cable joint, detect the phase fault etc shall be paid separately in the same schedule. |
| 10 | Laying of riddled sand obtained from excavation and cushining, covering of UG cables in trenches complete complete all as specified and as directed .Note:- for the measurent purpose only punned thicknes shall be measured and paid. |
| 11 | Supply and laying in replacement of common burnt brick clay building bricks sub class 'B' designation of size 230mm X115mmX 75mm laid dry andabductting each other withgape between adjacent brick, not exceeding 10mm over underground cable for cable protection in trenches, complete all as specified and directed. |
| 12 | Returning and filling of including spreading leveling, watering and well ramming in layers not exceeding 25 cm complete all as specified and directed. |
| 13 | Removing excavated soil to a distance not exceeding 50 metre and depositing where directed at a level, not exceeding 1.5 metre above the starting point complete all as specified and directed. |
| 14 | Cutting existing road/hardstand/concrete blocks/slabs/brick work or stone masonry of any type by using crow bar chisel up to a depth of 30 cm for laying GI pipe including making good the surface by returning filling watering ramming in layers cold mix bitumen over 200 mm thick hard core of broken bricks/stones over returning filling watering ramming in layers not exceeding 25 cm thick complete all as specified and directed. |
| 15 | Taking down existing street light/flood light/solar light fittings carefully (any capacity ,any type) from pole 5/6/7/9/11 mtr or building carrying out necessary repairing at E/M yard and refixing into the existing location including replacement of unserviceable/ defective spare parts i.e.(LED fitting /drivers) complete all as specified and directed . |
| 16 | Taking down existing garden light fittings carefully ( any type) of posttop lantern, carrying out necessary repairing at site and refixing into the existing location including replacement of unserviceable/ defective spare parts (such as , lamp, holder, etc), cleaning of acrylic cover with detergent and replacement of internal wiring with two runs of PVC insulated 1.5 Sq mm copper conductor cable from fittings to connector block and testing after refixing at site complete all as specified and directed . |
| 17 | Taking down in Repair/servicing to High Mast light 15/12Mtr Height complete down the assembly and check the all light fitting and Replacement of the unserviceable flood light fittings and other Materials found rusted Changed with New Spares and Clean the all fittings make serviceable incl greasing, oiling of pullies, moving parts, chain stee, chain steel rope of high must motoretc complete all as specified and directed. Note :- the replacing of flood light fittings measured and shall be paid separate in the same schedule. |
| 18 | Material and labour for rewinding of high mast tower motor assembly of 415 volts 3 phase with super enamelled copper wire,replacement of bearings/worn out nuts,bolts etc as per existing type and size and re-fixing the motor assembly on the same position and testing on completion all as specified and directed. |
| 19 | Attending complaints / breakown of LT electrical system and taking down existing connection from LT Panel/Bus Bar Chamber/Feeder Piller/ Electric Poles/ Building carefully (any capacity ,any type) carrying out repair work at site including replacement of unserviceable/ defective screw/nut & bolts/ Washers/Lugs/Spreaders/Hinges of doors/Repair to Locks & handles/ Indication Lamps/meters/Cable glands/Bus Bar (Copper/Aluminium) etc, refixing the fittings in its original position, testing and commissioning, including removal of bushes, creapers and trimming of branches around the LT Panel/Bus Bar Chamber/Feeder Piller/ Electric Poles including takingout fixing site complete all as specified and directed . Please Enable Macros to View BoQ information |
| 20 | Attending complaints / breakown of LT electrical system and taking down existing connection from LT Panel/Bus Bar Chamber/Feeder Piller/ Electric Poles/ Building carefully (any capacity ,any type) carrying out repair work at site including replacement of unserviceable/ defective screw/nut & bolts/ Washers/Lugs/Spreaders/Hinges of doors/Repair to Locks & handles/ Indication Lamps/meters/Cable glands/Bus Bar (Copper/Aluminium) etc, refixing the fittings in its original position, testing and commissioning, including removal of bushes, creapers and trimming of branches around the LT Panel/Bus Bar Chamber/Feeder Piller/ Electric Poles including takingout fixing site complete all as specified and directed . Please Enable Macros to View BoQ information |