|
| 1 | Clear water Boosting P/Plant -W.T.P Campus at Nawadih |
| 2 | Cost towards supplying and laying of 70 sq. mm x 3.5 core XLPE aluminium armoured 1.1 KV grade cable from Transformer to meter to main switch in the pump house.(Confirms to IS:1554,PART-1). |
| 3 | S/F of 90 watt LED street lighting luminaire with pressure die cast housing and toughened glass cover , operating voltage range 100V-270V AC with structure, stand, clamp, tee, wires and switches etc. all complete. |
| 4 | S/F of 90 watt LED Flood lighting luminaire with pressure die cast housing and toughened glass cover , operating voltage range 100V-270V AC with structure, stand, clamp, tee, wires and switches etc. all complete. |
| 5 | Supplying and fitting of 125 mm dia. Flange type C.I. foot valve having single leather flap and gun metal seating, Valve shall be fixed on suction side of pump as per requirement including jointing material and hardware as per IS:4038. |
| 6 | Cost towards repairing, servicing and greasing of 25 H.P. HSC C/F Pump set having 1480 rpm, head 35 mtrs, discharge 120m³/hr, pump of make WILO (Mather & Platt) with following works:-i. Dismantling opening & cleaning of Pump with all labour, tools and tackles.ii. Repairing of pump shaft with re-metalling of S. S. pump shaft, welding turning & Finishing and fitting as per sample at lathe-01 No.iii. Making & fitting of shaft sleeve as per sample -02 Nos.iv. Ball Bearing 6305 & roller bearing N206EC-01 No each.v. Nut-bolt, gasket and paper packing etc.vi. Complete re-assembling and overhauling of Pump at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete at clear water P/Plant. |
| 7 | Cost towards replacing of old damaged Cables passing through energy meter by MRT division of Electricity Department including meter shifting and testing charge with all labour, tools and materials. |
| 8 | Raw water P/Plant –Intake Well at Baskichawk. |
| 9 | Providing all labours, tools, tackles and technician for disconnection and taking out 50 HP VT p/set with column pipe from intake well all complete set. |
| 10 | Cost towards all labour, tools, tackles and technician for opening, dismantling, repairing and overhauling of 50 HP 09 stage bowl assembly VT pump having head 78 meter, discharge- 96 m3/hr. speed 1460 rpm.with changing of following accessories.i. C.I. retainer bearing (Spider bearing)-05 Nos. as per sample.ii. Spider cut less rubber bushes- 05 Nos.iii. Locks.iv. 30mm dia. S.S. line shaft- 10 ft. each 3 Nos.v. 30mm dia. S.S. line shaft- 5 ft. each 1 No.vi. 30mm dia. S.S. head shaft- 5 ft. each 1 No.vii. S.S. shaft coupling (S.S Socket) -6 Nos.viii. 30 mm S.S. shaft & lever (S. S. Bush)-6 Nos.ix. S. Box –bush-01 No.x. S.S. Reducing Socket-01 No.xi. Impeller copper bush-10 Pcs.xii. Ferro collar ball rubber bush- 12 Pc.xiii. Ball sleeve bush- 10 Nos. Changing Nut Bolts of Column pipe joints & VT pump bowl assembly with S.S. nut bolts -10 kg etc. as per sample all materials as per required reassembling the same at workshop, complete lathe work for line shaft threading, key & lock making and refitting etc. all complete job. (rate after deducting the scrap materials). |
| 11 | Providing all labours, tools, tackles and technician for lowering after repairing of 50 HP VT P/Set with column pipe into intake well all complete and testing on full load. |
| 12 | Cost towards repairing of 100 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-240 to 400 V and Output-400±1%V. Make-Servokon with following works-i. Cost towards disconnection and cleaning & drying of Stabilizer with all labour tools and tackles.ii. Cost towards S/F of servo motor as per sample-10 kg -03 Nos.iii. Cost towards s/f of Panel Sensing/control PCB Card as per sample-01 No.iv. R.C kit-03 No.v. Wiring of stabilizer with 4 sq. mm wire.vi. Control transformer-03 Nos.vii. Cost towards supplying and filling of transformer oil.-100 Ltrs.Cost towards complete servicing and repairing cost of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load. Intake well Baskichawk. |
| 13 | S/F of 90 watt LED street lighting luminaire with pressure die cast housing and toughened glass cover , operating voltage range 100V-270V AC with structure, stand, clamp, tee, wires and switches etc. all complete |
| 14 | S/F of 90 watt LED Flood lighting luminaire with pressure die cast housing and toughened glass cover , operating voltage range 100V-270V AC with structure, stand, clamp, tee, wires and switches etc. all complete. |
| 15 | Cost towards special repairing of motor control panel having FASD starter – 2 nos. and 200 Amp, 415Volts MCCB incomer-01 No. 100 Amp outgoing MCCB-02 Nos. with changing following accessories i. L&K MNX contactor as Main contactor (MNX-70)-01 No.ii. Star contactor (MNX-50) and delta contactor (MNX-70) -02 Nos. each.iii. Front & Side Add on Auxiliary contacts-(2NO+2NC) -01 no. each.iv. Thermal overload Relay-01 No. v. Timer (0-60 sec)-01 No.vi. ON-OFF push buttons-02 Nos.vii. 3 phase Digital Voltmeter-01 No. C&S/L&K/ Schneider make.viii. 3 phase Digital Ampermeter-01 No. C&S/L&K/ Schneider make.ix. Multi protection Device-02 nos. C&S/MPD/ L&K/ Minilac/Schneider make.x. 3 way selector switch-03 Nos.xi. CT 200/5A-03 Nos. and changing of damaged wires as per required and copper lugs., LED Phase indicating bulb-06 Nos., 16 mm2 single Core power cable grip to panel board-10 Mtrs., and 2.5 sq. single core copper cable-20 mtrs. Etc. with all fitting charges at Raw Water p/plant-Baskichawk. |
| 16 | Cost towards supplying of triple spur gear type chain pulley block suitable for capacity as below with 3 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying ISI mark. 3 ton capacity. |
| 17 | Cost towards replacing of old damaged Cables passing through energy meter by MRT division of Electricity Department including meter shifting and testing charge with all labour, tools and materials. |
| 18 | Cost towards painting of Electro-mechanical components as Motor Pump, panel board, Sluice valve, NR Valves, Suction pipe line, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at WTP boosting unit. |
| 19 | Add 18% GST |
| 20 | Add 1% Labour Cess Please Enable Macros to View BoQ information |