| 1 | (Part-A) Supply & Erection Providing & Fixing of PG Clamp | (Part-A) Supply & Erection Providing & Fixing of PG Clamp |
| 2 | Providing & Fixing of F Bracket | Providing & Fixing of F Bracket |
| 3 | Providing & Fixing of Number Plate | Providing & Fixing of Number Plate |
| 4 | Providing & Fixing of Danger Board with Clamp | Providing & Fixing of Danger Board with Clamp |
| 5 | Providing & Fixing of Barbed wire | Providing & Fixing of Barbed wire |
| 6 | Providing & Fixing of Nut, Bolt & washer off Size | Providing & Fixing of Nut, Bolt & washer off Size |
| 7 | Providing of Red Oxide Paint & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Paint | Providing of Red Oxide Paint & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Paint |
| 8 | Providing of Alu. Paint & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Paint | Providing of Alu. Paint & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Paint |
| 9 | Providing & Fixing of Cross Arm Holding Clamp | Providing & Fixing of Cross Arm Holding Clamp |
| 10 | Providing & Fixing of Jointing Sleevs for ACSR Weasel Conductor | Providing & Fixing of Jointing Sleevs for ACSR Weasel Conductor |
| 11 | Providing & Fixing of Jointing Sleevs for ACSR Dog Conductor | Providing & Fixing of Jointing Sleevs for ACSR Dog Conductor |
| 12 | Providing & Fixing of HDPE Pipe | Providing & Fixing of HDPE Pipe |
| 13 | Providing & Fixing of GI Pipe | Providing & Fixing of GI Pipe |
| 14 | Providing & Fixing of 11 KV DP Clamp for PCC Pole | Providing & Fixing of 11 KV DP Clamp for PCC Pole |
| 15 | Providing & Fixing of Stone Pad | Providing & Fixing of Stone Pad |
| 16 | Providing & Fixing of Alu. Lug off size | Providing & Fixing of Alu. Lug off size |
| 17 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 18 | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 19 | Carriage of T/F 100 KVA/11/0.43 KV L-II 4 Star Alu. Wound from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of T/F 100 KVA/11/0.43 KV L-II 4 Star Alu. Wound from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 20 | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. MS Angle 65x65x6 mm (16), Top Channel 125x65 mm with clamp (43), 11 KV Disc Insulator B&S Types (105), Disc Fitting (105), 11 KV Pin Insulator with Pin & Nut (51), Stay Set Complete (71), Earthing Complete (119), 11 KV Cross Arm for STP (219), Dog Conductor (7269 Mtr.), Weasel Conductor (10637 Mtr.), Polymer Pin Insulator (474), Gaurding Angle with Clamp (103), GI Wire (2046 Kg.), Barbed wire (93 Kg.), 11 KV Lightining Arrestor (6), 11 KV Jointing Kit 3x185 sqmm O/D (14), MS Dropper Channel 100x50x5x2028 mm (1), 11 KV Fuse Set (1) and other line Material as required in Estimate/Package) | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. MS Angle 65x65x6 mm (16), Top Channel 125x65 mm with clamp (43), 11 KV Disc Insulator B&S Types (105), Disc Fitting (105), 11 KV Pin Insulator with Pin & Nut (51), Stay Set Complete (71), Earthing Complete (119), 11 KV Cross Arm for STP (219), Dog Conductor (7269 Mtr.), Weasel Conductor (10637 Mtr.), Polymer Pin Insulator (474), Gaurding Angle with Clamp (103), GI Wire (2046 Kg.), Barbed wire (93 Kg.), 11 KV Lightining Arrestor (6), 11 KV Jointing Kit 3x185 sqmm O/D (14), MS Dropper Channel 100x50x5x2028 mm (1), 11 KV Fuse Set (1) and other line Material as required in Estimate/Package) |
| 21 | Cartiage of 11 KV XLPE CABLE 3x185 sqmm from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of 11 KV XLPE CABLE 3x185 sqmm from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 22 | Erection and grouting of PCC 8.5 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of PCC 8.5 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 23 | Erection and grouting of ST Pole 11 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 24 | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 25 | Erection and grouting of ST Pole 13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 26 | Erection and grouting of ST Pole 13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 27 | Erection and grouting of ST Pole 13 Mtr. long (Four Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long (Four Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 28 | Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 29 | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) Through H.D.P.E.pipe by H.D.D. Machine as respo norms including the cost of arrangment of labour, T&P, H.D.D. machine. reauired for proper completion of work. | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) Through H.D.P.E.pipe by H.D.D. Machine as respo norms including the cost of arrangment of labour, T&P, H.D.D. machine. reauired for proper completion of work. |
| 30 | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) underground in exavated trench by excavator Machine of required width and depth in all kind of soil including dressing, stacking/desposal of excavated material complete in all respect as respo norms including the cost of arrangment of labour, T&P & excavator machine. reauired for proper completion of work. | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) underground in exavated trench by excavator Machine of required width and depth in all kind of soil including dressing, stacking/desposal of excavated material complete in all respect as respo norms including the cost of arrangment of labour, T&P & excavator machine. reauired for proper completion of work. |
| 31 | Laying & Commissioning of 11 KV XLPE cable 3x185 sqmm rising through GI pipe and making loop as per RESPO Norms and direction by superivising Engineer. | Laying & Commissioning of 11 KV XLPE cable 3x185 sqmm rising through GI pipe and making loop as per RESPO Norms and direction by superivising Engineer. |
| 32 | Laying of 11 KV XLPE cable 3x185 sqmm (single circuit) in trench through HDPE Pipe including exavation of trench, sand, protective bricks back filling and restroration of surface complete as per RESPO Norms complete in all respect including the cost of arrangment of labour, T&P for proper completion of work. . | Laying of 11 KV XLPE cable 3x185 sqmm (single circuit) in trench through HDPE Pipe including exavation of trench, sand, protective bricks back filling and restroration of surface complete as per RESPO Norms complete in all respect including the cost of arrangment of labour, T&P for proper completion of work. . |
| 33 | Installation of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Installation of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 34 | Laying sagging stringing and binding and jumpering of ACSR dog conductor/ACSR Weasel Conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P carrier etc reauired for proper completion of work. | Laying sagging stringing and binding and jumpering of ACSR dog conductor/ACSR Weasel Conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P carrier etc reauired for proper completion of work. |
| 35 | Erection & grouting of Stay Set Complete on Errected pole for giving supply to consumer by connecting consumer cables. | Erection & grouting of Stay Set Complete on Errected pole for giving supply to consumer by connecting consumer cables. |
| 36 | Erection, stretching & Fixing of Barbed wire on existing posts including binding, tightening etc. complete in all respect as direction by supervising Engineer. | Erection, stretching & Fixing of Barbed wire on existing posts including binding, tightening etc. complete in all respect as direction by supervising Engineer. |
| 37 | Filling of 11 KV Jointing Kit 3x185 sqmm O/D and making connection as per respo norms & direction by supervising engineer. | Filling of 11 KV Jointing Kit 3x185 sqmm O/D and making connection as per respo norms & direction by supervising engineer. |
| 38 | INSTALLATION OF 11 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 3 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. | INSTALLATION OF 11 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 3 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. |
| 39 | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. |
| 40 | Installation & Commissioning of 11 KV Fuse Set including all accessories mounting on structure, connection with existing HT line & earthing arrangement as per RESPO Norms and direction by superivising Engineer. | Installation & Commissioning of 11 KV Fuse Set including all accessories mounting on structure, connection with existing HT line & earthing arrangement as per RESPO Norms and direction by superivising Engineer. |