| 1 | (Part-A) Supply & Erection Providing & Fixing of Stone Pad | (Part-A) Supply & Erection Providing & Fixing of Stone Pad |
| 2 | Providing & Fixing of PG Clamp | Providing & Fixing of PG Clamp |
| 3 | Providing & Fixing of E Bracket | Providing & Fixing of E Bracket |
| 4 | Providing & Fixing of Barbed wire | Providing & Fixing of Barbed wire |
| 5 | Providing & Fixing of Alu. winding wire | Providing & Fixing of Alu. winding wire |
| 6 | Providing & Fixing of Armor Rod with ferrules | Providing & Fixing of Armor Rod with ferrules |
| 7 | Providing & Fixing of Nut, Bolt & washer off Size | Providing & Fixing of Nut, Bolt & washer off Size |
| 8 | Providing & Fixing of LT Clamp | Providing & Fixing of LT Clamp |
| 9 | Providing & Fixing of MS Angle for breacing | Providing & Fixing of MS Angle for breacing |
| 10 | Providing & Fixing of MS Angle | Providing & Fixing of MS Angle |
| 11 | Providing & Fixing of Top Channel | Providing & Fixing of Top Channel |
| 12 | Providing & Fixing of Clamp for V Type Cross Arm 11 KV | Providing & Fixing of Clamp for V Type Cross Arm 11 KV |
| 13 | Providing & Fixing of 11 KV F Bracket | Providing & Fixing of 11 KV F Bracket |
| 14 | Providing & Fixing of Number Plate with Clamp | Providing & Fixing of Number Plate with Clamp |
| 15 | Providing & Fixing of Danger Board with Clamp | Providing & Fixing of Danger Board with Clamp |
| 16 | Providing & Fixing of Dead End Clamp | Providing & Fixing of Dead End Clamp |
| 17 | Providing & Fixing of Suspension Clamp | Providing & Fixing of Suspension Clamp |
| 18 | Providing & Fixing of I Hook | Providing & Fixing of I Hook |
| 19 | Providing & Fixing of Clamp for Distribution Box | Providing & Fixing of Clamp for Distribution Box |
| 20 | Providing & Fixing of Clamp for V Type Cross Arm 33 KV | Providing & Fixing of Clamp for V Type Cross Arm 33 KV |
| 21 | Providing & Fixing of 33 KV F Bracket | Providing & Fixing of 33 KV F Bracket |
| 22 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 23 | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 24 | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Distribution Box (12), Stay Set Complete (36), Earthing Complete (88), 11 KV V Type Cross Arm (91), 33 KV V Type Cross Arm (11), ACSR Dog Conductor (3847), ACSR Raccon Conductor (12515), ABC 3x120 sqmm (630), 33 KV Disc Insulator (12), 11 KV Disc Insulator with fitting (36), Disc Fitting (12), 33 KV Pin Insulator with pin (44), 11 KV Pin Insulator with pin (249) and other line Material as required in Estimate/Package) | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Distribution Box (12), Stay Set Complete (36), Earthing Complete (88), 11 KV V Type Cross Arm (91), 33 KV V Type Cross Arm (11), ACSR Dog Conductor (3847), ACSR Raccon Conductor (12515), ABC 3x120 sqmm (630), 33 KV Disc Insulator (12), 11 KV Disc Insulator with fitting (36), Disc Fitting (12), 33 KV Pin Insulator with pin (44), 11 KV Pin Insulator with pin (249) and other line Material as required in Estimate/Package) |
| 25 | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 26 | Erection and grouting of ST Pole 11 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 27 | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 28 | Erection and grouting of ST Pole 13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 29 | Erection and grouting of ST Pole 13 Mtr. long (Four Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long (Four Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T&P grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 30 | Installation of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Installation of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 31 | Laying sagging stringing and binding and jumpering of ACSR dog conductor/ACSR Raccon Conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P carrier etc reauired for proper completion of work. | Laying sagging stringing and binding and jumpering of ACSR dog conductor/ACSR Raccon Conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P carrier etc reauired for proper completion of work. |
| 32 | Laying sagging stringing and binding and jumpering of ABC 3X120 SQMM in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Laying sagging stringing and binding and jumpering of ABC 3X120 SQMM in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 33 | Fixing of DISTRIBUTION BOX on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX on Errected pole for giving supply to consumer by connecting consumer cables. |
| 34 | Installation of Stay Set Complete as direction by supervising Engineer. | Installation of Stay Set Complete as direction by supervising Engineer. |
| 35 | Cutting/chopping of tree branches obstructing 33KV/11KV/LT Lines & disposal of trimmed material complete as per direction by Supervising Engineer. | Cutting/chopping of tree branches obstructing 33KV/11KV/LT Lines & disposal of trimmed material complete as per direction by Supervising Engineer. |
| 36 | Dismentling & Removal of existing PCC Pole including all old and used material and Recived back to concern JE Store or 33/11 KV Substation including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. | Dismentling & Removal of existing PCC Pole including all old and used material and Recived back to concern JE Store or 33/11 KV Substation including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. |
| 37 | Dismentling & Removal of existing ST Pole 11 Mtr. including all old and used material and Recived back to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. | Dismentling & Removal of existing ST Pole 11 Mtr. including all old and used material and Recived back to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. |
| 38 | Dismentling & Removal of existing Dog Conductor/Raccon Conductor from overhead line then coiling and safe carriage to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. | Dismentling & Removal of existing Dog Conductor/Raccon Conductor from overhead line then coiling and safe carriage to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. |
| 39 | Dismentling & Removal of existing ABC 3x120 sqmm from overhead line then coiling and safe carriage to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. | Dismentling & Removal of existing ABC 3x120 sqmm from overhead line then coiling and safe carriage to ele. Store centre Taj Agra. (0 to 30 KM.) including loading, unloading both ends. includes the cost of labour, T&P, carrier etc reauired for proper completion of work. |