| 1 | Construction of Anicut cum Causeway at Banas River near Village Kanwarawas PS Toda Raisingh Tehsil Toda Raisingh District Tonk(139576) |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) |
| 3 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. |
| 4 | Supply & fixing 6 mm thick rubber water seal of approved quality in construction/contraction joints as per drawing complete in all respect. 305 mm wide |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) |
| 6 | Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m. depth |
| 7 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete |
| 8 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. |
| 9 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type gate with frame consisting of skin plate, sealing frame, stiffeners, horizontal and vertical girders, guide, stainless steel flat/Brass flat, rivets, wedges, lifting rods etc., with all accessories as per relevant IS code including frame & gate complete set for Canal Cross, Escape, Head regulator /Tank head regulator including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, seal fixing, tools and tackles etc., applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. |
| 10 | Supply of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826 -1979 having mesh of 10 cm x 10 cm (surface area of crate will be measured) made of wire of 5 mm diameter. |
| 11 | Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates, including cost of stones in position complete in all respects. |
| 12 | Cost of Diesel |
| 13 | Pumping sets Above 16 HP to 30 HP |
| 14 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum |
| 15 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km). |
| 16 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. Beyond initial lead of 50 m & upto 250 m Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km). |
| 17 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required |
| 18 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. |
| 19 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. |
| 20 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. Beyond initial lead of 50 m & upto 250 m Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km). |
| 21 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite & other hard rock requiring nominal blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. |
| 22 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite & other hard rock requiring nominal blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. Beyond initial lead of 50 m & upto 250 m Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km). |
| 23 | Supplying stone, spall and laying R. R. stone pitching, hammer dressed with packing of voids from small stones including all lead & lifts, in required profile of 23 cm thickness ( 5 % thickness tolerance) |
| 24 | Supplying, Laying & consolidation of quarry rubbish / Murrum / Murda to required grade & camber in layers not exceeding 15 cm. thickness (loose) by road roller as per specifications including dressing etc. complete. |
| 25 | Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(For mix design Cement content considered 320 kg/ cum of concrete) 20 mm |
| 26 | Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface.PCC Nominal Mix 1:2:4 with plum, Max size of Aggregate 20 mm |
| 27 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(For mix design Cement content considered 400 kg/ cum of concrete) 20 mm Add extra over labour rates for item No. 2 to 5 for II stage concrete for obstruction of II stage embedded parts and restricted working space.In horizontal block-outs |
| 28 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 29 | Construction of Anicut cum causeway near village Sentiawas at Banas River Tehsil Toda Raising District Tonk(153088) |
| 30 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. |
| 31 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 32 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) |
| 33 | Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m. depth |
| 34 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete |
| 35 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. |
| 36 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type Dam Shutter gates interchangeable consisting of sealing frame (embedded parts), skin plate of shutters, stiffeners, horizontal and vertical girders, guide, stainless steel flat, lifting hooks, clits fasteners etc., with all accessories including frame & gate complete set for Barrage/ Stop dam/ waste weir / spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, tools and tackles, seal fixing, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, including primer coating, should not be less than 350 microns., etc. complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other materials. |
| 37 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick |
| 38 | Supply of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826 -1979 having mesh of 10 cm x 10 cm (surface area of crate will be measured) made of wire of 5 mm diameter. |
| 39 | Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates, including cost of stones in position complete in all respects. |
| 40 | Cost of Diesel |
| 41 | Pumping sets Above 16 HP to 30 HP |
| 42 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil |
| 43 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum |
| 44 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required |
| 45 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km) |
| 46 | Add extra for each subsequent lead of 500m or part there of beyond 0.500 Km and up to 5 km |
| 47 | (ii)Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. at least 98% of Standard Proctor s density |
| 48 | Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect |
| 49 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting |
| 50 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite & other hard rock requiring nominal blasting |
| 51 | Watering of earth including cost of carriage of water when source of water is up to 1 Km |
| 52 | Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm thickness ( 5 % thickness tolerance) |
| 53 | R.R. stone Masonry Kharanja with proper packing of chipping stones using hammer as per IS specification (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including all leads of all construction materials, curing etc. complete in 1: 6 Cement Mortar |
| 54 | Providing, fixing and erecting 50 mm dia painted tubular steel pipe as per IS 1239 railing in 3 rows on precast M-20 grade RCC vertical posts 1.8 meter high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 meter centre to centre, complete as per approved drawing as per MoRTH specification clause 808. |
| 55 | Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface.PCC Nominal Mix 1:2:4 with plum, Max size of Aggregate 20 mm |
| 56 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(For mix design Cement content considered 400 kg/ cum of concrete) 20 mm |
| 57 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(For mix design Cement content considered 420 kg/ cum of concrete) 20 mm |
| 58 | Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for 'AA' class loading as per IRC specifications including to effect of impact, EQ etc. complete on form base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal size the work includes required safety measures construction of drain for diversion of flowing water cost of design of RCC Precast Box and its proof checking from IIT/MNIT Jaipur complete in all respect as per specifications Size 1.00 M x 1.00 M |
| 59 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 60 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm |
| 61 | Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.(Hard rock not required blasting) |
| 62 | Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. ( Hard soil mixes with kankar/boulders, Morrum) |
| 63 | Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.(Phylite and other rock requiring nominal blasting) |
| 64 | Extra lead over item no. 1 to 8 of excavated material. Add extra over item 10(a) for lead beyond 250 m and upto 750 m (for avergae 0.5 km) Please Enable Macros to View BoQ information |