| 1 | ITEMS TO BE EXECUTED |
| 2 | Careful collection and removal of accumulated malba and construction debris from the monument's various floors, terraces, galleries, and inaccessible corners, including fallen masonry, lime fragments, plaster remnants, organic matter, and waste resulting from prior interventions or decay. Material to be collected manually or using suitable conservation-safe equipment, bagged, and transported for safe disposal as per site conditions and local guidelines. Includes loading, internal shifting, and lowering through chutes or manual transfer, ensuring no damage to historic surfaces. (Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.) |
| 3 | Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge |
| 4 | Providing and laying of lime concrete in floor / terrace 20 to 25 mm brick ballast of well burnt ) mixed with 50% lime mortar in ratio of 1:1:1 (1-U.Katni lime ,1- surkhi, 1 C.sand ) after removing of accumulated rubbish, including beating and treating with split bamboo and thappies till surface hardened for water tightening, including adding 2% solution of boiled water of Gum, Gur and bellgiri-fruit, complete within 200mt. lead and also rounding junctions with parapet wall etc. complete |
| 5 | Provision for taking out loose lakhori bricks carefully manually with a purpose of remasonary to conserve yhe structure and disposal of unserviceable material within 50 metres lead as per the direction of engineer-in Charghe ( in lime mortar or cement mortar) |
| 6 | Providing & fixing lakhory brick masonry in two courses lime composite Mortar 1:1:1 (1 U/S lime 1 Surkhi , 1 C.sand ) mixed with adhesive marterials, including supply of labour , material and T& P etc required for proper completion of the work. |
| 7 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( including Errection & dismental after work) |
| 8 | Provision for providing & applying the lime mortar grouting in consolidation of hollow or cracked masonry walls, arches, pillars, staircases, and foundation zones where cavity made with the help of the grouting machine or gun, including cost of material, labour cost, cartage, loading & unloading, curing etc. complete in all respect. |
| 9 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead carefully, including disposal of refuse as directed by the site incharge including all the supply of labour T & P etc. Required proper completion of work at the site |
| 10 | Provision for 25 - 30 mm thick ( 25 mm nominal thickness) lime plaster work with mortar ratio of 1:1:1(1Lime: 1Surkhi:1 Coarse sand) with mix of gur/sheer, gum , belgiri, etc. Plaster work to be executed in two coat as required after carefully removing of old plaster work etc. complete. |
| 11 | Provision for providing & making lime slacking & mortar pit by means of pit excavation, brick masonry & plastering over it. The size of the over all pit is 8.00M x 3.00M & depth is 0.90M. The pit is divided in to three parts & cement plastere |
| 12 | Underpinning Lakhori brick masonry with Lime surkhi in 1:1:1(1 lime : 1 surkhi : 1 C sand) with adhessive materials like Gur, Belgeri, Gum including carriage of water and materials with in a lead upto 50m |
| 13 | Providing and fixing the missing veneer stone/Dasa stone, as per the original pattern to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for refixing the stone as per the original pattern in original shape and size with lime mortar 1:1:1:( 1 Lime: 1 C sand: 1surkhi) |
| 14 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge |
| 15 | Provision for pointing the joints of Stone masonary/Lakhori bricks masonary with composite mortar 1:1:1 mix (1 Lime : 1 Surkhi : 1 C. Sand) with adhesive material etc.complete. |
| 16 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.2 - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 17 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: 6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 18 | Provision for laying Tile brick on edge flooring with bricks of class designation 7.5 on a bed of 30 mm lime mortar (1:1:1 – 1 Lime : 1 Surkhi : 1 Coarse Sand), including filling the joints with same mortar, with common burnt clay non modular bricks |
| 19 | Provision for Providing and fixing sal wood work in door chaukhat and windows making with groove and design as per existing patter in position with hold fast lugs or with dash fasteners of required dia etc. complete(3.50mx0.10mx0.10m) |
| 20 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 21 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete 9.48.2 Fixed to openings /wooden frames with rawl plugs screws etc |
| 22 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 10.16.1 Hot finished welded type tubes |
| 23 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 13.61.1 Two or more coats on new work |
| 24 | Providing and fixing Stainless Steel dowels in cracks of arches and walls, including drilling holes, cleaning, inserting SS dowels of approved grade and size, grouting with mortar and finish with lakhori brick as per original structure, finishing flush with surface, complete as per engineer-in-charge |
| 25 | Provision for providing & applying the lime punning over finished surface with lime plaster etc. complete. |
| 26 | Provision for Essential items needed for proper execution of the work PVC sheet |
| 27 | PVC Pan |
| 28 | Hammer with handle 1kg |
| 29 | Iron chisel 4\\",6\\", 8\\" |
| 30 | PVC Bucket |
| 31 | PVC Mug |
| 32 | Wire & coir brush |
| 33 | PVC Water tank 500Ltr |
| 34 | Gum Boot PVC in pair |
| 35 | PVC pipe 1\\" |
| 36 | Wooden cycle rickshaw for loading & unloading of materials |
| 37 | Tuffpaulin sheet 80'x80' feet |
| 38 | Wooden handle (Fawra, Hammer) |
| 39 | First Aid Box with Medicine |
| 40 | Provision for Hiring Charges of Water Tanker (5000 Ltr) capacity which are required during the execution of work Please Enable Macros to View BoQ information |