| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: |
| 2 | All kinds of soil |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. |
| 4 | All kinds of soil |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 6 | Foundations, footings, bases for columns. |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 8 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 9 | 12 mm cement plaster of mix : |
| 10 | 1:6 (1 cement: 6 fine sand) |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 12 | One or more coats on old work |
| 13 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. |
| 14 | Cement concrete prepared with batch mixing machine |
| 15 | Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) |
| 16 | Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge. |
| 17 | Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge. |
| 18 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, including cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete |
| 19 | New work (Two or more coats) |
| 20 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer in-Charge. |
| 21 | With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20 |
| 22 | Construction of dry lean cement concrete sub base over a prepared sub grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per pecifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in- charge. |
| 23 | Removing the existing badminton pole and refixing the same at the required location, including excavation, PCC foundation, alignment, levelling, curing, and making good surface, complete as per direction of Engineer-in-Charge. |
| 24 | Providing and laying 125 micron thick polyethylene sheet over prepared surface of Dry Lean Concrete (DLC) / sub-base before laying of PQC / flooring, including jointing with 300 mm overlap, sealing with adhesive tape, complete in all respects as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |