|
| 1 | Earthwork excavation by mechnical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, lines and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottomof trenches, dressing of sides, stacking the excavated material away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing/ disposing the surplus excavated earth (Disposal soil to be leveled by breaking clods, if any and neatly dressed and levelled) within lead specified below all complete as per specification and as directed by the EIC. All kinds of soil with depth upto 1.5m below average ground level and disposing surplus excavated earth upto a lead of 200metres. |
| 2 | Earthwork excavation by mechnical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, lines and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottomof trenches, dressing of sides, stacking the excavated material away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing/ disposing the surplus excavated earth (Disposal soil to be leveled by breaking clods, if any and neatly dressed and levelled) within lead specified below all complete as per specification and as directed by the EIC. All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 200 meters. |
| 3 | Earthwork excavation by mechnical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, lines and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottomof trenches, dressing of sides, stacking the excavated material away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing/ disposing the surplus excavated earth (Disposal soil to be leveled by breaking clods, if any and neatly dressed and levelled) within lead specified below all complete as per specification and as directed by the EIC. All kinds of soil with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth up to a lead of 200 metres. |
| 4 | Earthwork excavation by mechanical means (Hydraulic excavator) / manual means for foundation, substructures, plinth beam, cess pits & trenches all kinds of foundation etc., in soft rock for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the soft rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. All kinds of soft rock with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 200 metres. |
| 5 | Earthwork excavation by mechanical means (Hydraulic excavator) / manual means for foundation, substructures, plinth beam, cess pits & trenches all kinds of foundation etc., in soft rock for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the soft rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. All kinds of soft rock with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth up to a lead of 200 metres. |
| 6 | Earthwork excavation for foundation, substructures, plinth beam, cess pits & trenches, and all kinds of foundation etc., in hard rock (by chiseling) for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the hard rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. 8h)All kinds of hard rock with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth up to a lead of 200 metres. |
| 7 | Earthwork excavation for foundation, substructures, plinth beam, cess pits & trenches, and all kinds of foundation etc., in hard rock (by chiseling) for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the hard rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. All kinds of hard rock with depth exceeding 4.5m but not exceeding 6m below average Ground level and disposing surplus excavated earth up to a lead of 200 metres. |
| 8 | Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, leveling all complete as per specification and as directed by the Engineer-in-Charge.Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements.2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road.Lead charges for lead exceeding 4 kilometre but not exceeding 5 kilometre. Please Enable Macros to View BoQ information |