|
| 1 | Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) of internal dia 100mm bore, set in cement mortar complete and removing the debris from the site complete all as specified and directed. |
| 2 | Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) of internal dia 150mm bore, set in cement mortar complete and removing the debris from the site complete all as specified and directed. |
| 3 | Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) of internal dia 200mm bore, set in cement mortar complete and removing the debris from the site complete all as specified and directed. |
| 4 | Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) of internal dia 300mm bore, set in cement mortar complete and removing the debris from the site complete all as specified and directed. |
| 5 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; any type of soil, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and directed. |
| 6 | Excavating in trenches, n exc 1.5 m wide and exc 1.5 m & n exc 3.0 m in depth; any type of soil, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and exc 1.5 m & n exc 3.0 m in depth and getting out complete all as specified and directed. |
| 7 | Removing surplus soils/excavated materials to a distance exc. 250 m but n exc 500 m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. |
| 8 | Returning, filling in any type of soil, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. |
| 9 | Supply, laying & jointing reinforced concrete pipe, 150 mm bore, class NP-2, laid and jointed complete with collars and testing complete all as specified and directed. |
| 10 | Supply, laying & jointing reinforced concrete pipe, 200 mm bore, class NP-2, laid and jointed complete with collars and testing complete all as specified and directed. |
| 11 | Supply, laying & jointing reinforced concrete pipe, 300 mm bore, class NP-2, laid and jointed complete with collars and testing complete all as specified and directed. |
| 12 | Supply, laying & jointing UPVC Sewage UDS (Under drainage system) pipes 100mm bore, single socketed, wall thickness not less than 4mm type SN-4 (IS-15328) including necessary fittings & jointing material and testing complete all as specified and directed. |
| 13 | M&L for concrete bed in cement concrete 1:4:8, type D-2 using 40mm graded stone aggregates, to drain pipes for 100mm bore, including packing under and haunching against the sides of pipes after they are laid and tested complete all as specified and directed. |
| 14 | M&L for concrete bed in cement concrete 1:4:8, type D-2 using 40mm graded stone aggregates, to drain pipes for 150mm bore, including packing under and haunching against the sides of pipes after they are laid and tested complete all as specified and directed. |
| 15 | M&L for concrete bed in cement concrete 1:4:8, type D-2 using 40mm graded stone aggregates, to drain pipes for 200mm bore, including packing under and haunching against the sides of pipes after they are laid and tested complete all as specified and directed. |
| 16 | M&L for concrete bed in cement concrete 1:4:8, type D-2 using 40mm graded stone aggregates, to drain pipes for 300mm bore, including packing under and haunching against the sides of pipes after they are laid and tested complete all as specified and directed. |
| 17 | M&L for cutting into existing manholes for connecting new drains of 100 mm dia pipe, making good to pipes and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 smooth finished and reforming benching as required complete all as specified and directed. |
| 18 | M&L for cutting into existing manholes for connecting new drains of 150 mm dia pipe, making good to pipes and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 smooth finished and reforming benching as required complete all as specified and directed. |
| 19 | M&L for cutting into existing manholes for connecting new drains of 200 mm dia pipe, making good to pipes and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 smooth finished and reforming benching as required complete all as specified and directed. |
| 20 | Supply & fixing in replacement factory made RCC cover full floor mediun duty weight rectangular shape (size 450mm x 900mm) thickness not less than 75mm plain fair faces (for manhole, drains etc) set in CM 1:6 complete all as specified and directed. |
| 21 | Supply & fixing factory made RCC cover full floor mediun duty weight circular shape, 900mm mm dia, thickness not less than 75mm plain fair faces (for manhole, drains etc) set in CM 1:6 complete all as specified and directed. |
| 22 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 23 | M&L for providing pre-cast cement concrete 1:2:4, type B-1 (using 20 mm graded stone aggregate) set in CM 1:6, as in cover slabs (for manhole, drains etc) with plain fair faces, including necessary formwork complete all as specified and directed. |
| 24 | M&L for mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia complete all as specified and directed. |
| 25 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, drains etc, but excluding ashlars facings, dressed stone work and precast concrete articles complete all as specified and directed. |
| 26 | M&L for brickwork with sub class ‘B’ bricks, old size, straight or curved on plan exc 6m mean radius built in cement mortar 1:4 complete all as specified and directed. |
| 27 | All as per description of Srl Item No 26.00 here as in before but except bricks.Note:- Serviceable bricks retrieved from demolition vide item No. 26 here-in-before shall be re-used. |
| 28 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 29 | M&L for cement concrete 1:2:4, type B-1, using 20mm graded stone aggregates as in copings, kneelers, apex stones, bed plates, kerbs water troughs and the like including weathering, slightly rounded or chamfered angles and throating, as directed including necessary formwork complete all as specified and directed. |
| 30 | M&L for cement concrete 1:4:8, type D-2, using 40mm graded stone aggregate as in foundation, filling and mass concrete complete all as specified and directed. |
| 31 | M&L for rendering 15 mm thick plaster in cement mortar 1:4 on brick or concrete surfaces and finished even and smooth without using extra cement, complete all as specified and directed. |
| 32 | Taking down cement plaster from brick / stone /concrete walls including raking out joints, hacking for key, scrubbing down with water etc. complete all as specified and directed. |
| 33 | M&L for cement concrete 1:2:4, type B-1, using 20mm graded stone aggregates as in surface channels and drains complete all as specified and directed. |
| 34 | Rectifying complaints of blockage of bathroom / kitchen / WHB / urinals / WCs of any pattern by cleaning the Nahani traps / gully traps / floor traps and making it fully functional. The blockage shall be cleared manually / mechanically as required at site. Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 35 | Rectifying complaints of blockage of manholes of depth not exc 1.00 mtr by removing manhole cover, cleaning the blockage manually / mechanically as required at site, incl removing of all sludge complete all as specified and directed.Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 36 | Rectifying complaints of blockage of manholes of depth exc 1.00 mtr but not exc 1.50 mtr by removing manhole cover, cleaning the blockage manually / mechanically as required at site, incl removing of all sludge complete all as specified and directed.Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 37 | Rectifying complaints of blockage of sewage lines of 100 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 38 | Rectifying complaints of blockage of sewage lines of 150 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 39 | Rectifying complaints of blockage of sewage lines of 200 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.(b) The payment shall be done by complaint wise.(c) The contractor shall provide adequate labours and tools to rectify the complaints.(d) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 40 | De-sludging septic tank 10 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludge shall be deposited beyond the periphery of defence land. |
| 41 | De-sludging septic tank 25 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludge shall be deposited beyond the periphery of defence land. |
| 42 | De-sludging septic tank 100 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludge shall be deposited beyond the periphery of defence land. |
| 43 | De-sludging septic tank 200 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludge shall be deposited beyond the periphery of defence land. |
| 44 | De-watering of soakage well or pit 1.20 mtr internal dia x 3.00 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludgy water shall be deposited beyond the periphery of defence land. |
| 45 | De-watering of soakage well or pit 1.20 mtr internal dia x 4.50 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludgy water shall be deposited beyond the periphery of defence land. |
| 46 | De-watering of soakage well or pit 1.80 mtr internal dia x 3.00 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.Note:-The sludgy water shall be deposited beyond the periphery of defence land. Please Enable Macros to View BoQ information |