Tender For Repair/ Maintenance To 11Kv Ht Lines, Transformers, Gods, Poles With Allied Works In Aor Of Cph And Other Locations Under Ge (Utilities) Udh Ur

Issued by Statutory Bodies & Commissions/Committees · Udhampur, Jammu And Kashmir
Tender Value
1 Crore
Estimated cost
Bid Submission
13 Jul 2026
1 days left
EMD
1.75 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Udhampur → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Repair/ Maintenance To 11Kv Ht Lines, Transformers, Gods, Poles With Allied Works In Aor Of Cph And Other Locations Under Ge (Utilities) Udh Ur

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Jun-2026 Corrigendum No.1 Date 06-Jul-2026
2 25-Jun-2026 Corrigendum No.2 BOQ 06-Jul-2026
3 06-Jul-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 13-Jul-2026

BOQ

Name of Work:- REPAIR/ MAINT TO 11KV HT LINES, TRANSFORMERS, GODs, POLES WITH ALLIED WORKS IN AOR OF CPH AND OTHER LOCATIONS UNDER GE (UTILITIES) UDH UR
Sl. No. Item Description
1BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: COMMANDER WORKS ENGINEER, UDHAMPUR Name of Work: REPAIR/ MAINT TO 11KV HT LINES, TRANSFORMERS, GODs, POLES WITH ALLIED WORKS IN AOR OF CPH AND OTHER LOCATIONS UNDER GE (UTILITIES) UDHAMPUR Contract No: CWE/U(U)- 27/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Ser.No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT TOTAL AMOUNT In Words
2Dismantling of existing GI earth/guard wire of any Size and removing unserviceable GI wire from Site complete all as specified and as directed.
3Dismantling of old unserviceable stay assembly including stay wire complete with necessary demolation of concrete excavation and earth work as reqd and removing the same from Site complete all as specified and as directed.
4Dismantling of old U/S GOD 11 KV and DO fuse unit unit of any type and capacity complete all as specified and directed.
5Dismantling of old UNSVdamage/rusted PCC pole/steel tubular poles of any Size necessary disconnecting cables/over head condcutor and removing unserviceable pole from Site complete all as specified and directed.
6Dismantling of insulator of any type and Size from existing poles after opening nuts, bolts and removing from Site complete all as specified and as directed.
7Dismantling of existing UNSV HT lightning arrestor form the electric pole and removing from Sitecomplete all as specified and as directed.
8Dismantling HT Danger notice plate from existing postion and removing from Site complete all as specified and as directed.
9Taking up/down under ground cable 11000 Volt grade of Size 95 Sqmm to 185 Sqmm Sqmm, 03 core from trenches, ducts, floor, pipes and removing materials from Site of work complete all as directed by Engineer-in-Charge.(Note: Excavation and earth work shall be measured separately)
10Pin Type, Porcelain vitreous, White, brown insulator of size 150 mm height, 150 mm dia for 11000 volts grade including one galvanised mild steel spindle , two galvanised iron washers and one galvanised iron nut in replacement, complete all as specified and directed
11Disc type insulator porcelain vitreous white brown or green as per IS 731-1963 of size 145 mm high and 255mm dia ball & socketed type single disc with tension clamp for working pressure 11000 volts complete all as specified and directed.
12S & F drop out fuse unit SIngle pole mounted on insulator, 11000 Volts grade double pole steel frame of current rating 50 Amps including taking down existing DO fuse unit complete and removing from Site complete all as specified and directed.
13Loop type insulator, vitreous porcelain, white, brown or green Small size, with overall dimensions 65 x 90mm, clearance of hole 16mm complete all as specefied and directed.
14Supply and fixing lightning arrestors gapless metal oxide type complete with all fittings, suitable for 11000 volts grade transmission class, discharge capacity 65 KA including brackets, clamps, nuts, washers and connecting to 4 mm dia GI earth wire complete all as specefied and directed.
15Galvanised mild steel wire cloth, 4mm nominal dia of wire and average width of aperture 3.15mm and fixed with tinned tacks, or galvanised wire staples, complete all as specified and as directed.
16S&F Stay assembly complete with acessories as shown in electrical plate no 1 (loop type insulator, stay clamps, stay wire, excavation and concrete measured separately) with 16 mm dia stay rod complete all as specefied and directed.
17Supply and fixing triple pole mechanically operated air break isolator (GOD), vertical mounting, rotating type, mounted on insulator and steel frame with operating mechanism worked from ground level complete in all respect such as gun metal moving contacts and spring loaded gun metal fixed jaws, knife copper jumper strip etc, suitable for 11000 Volts grade, 50 Hz, with 12 insulator of rating upto 400 Amps including taking down existing GOD complete and removing from SSRte complete all as specified and as directed.
18Supply and fixing triple pole mechanically operated air break isolator (GOD), vertical mounting, rotating type, mounted on insulator and steel frame with operating mechanism worked from ground level complete in all respect such as gun metal moving contacts and spring loaded gun metal fixed jaws, knife copper jumper strip etc, suitable for 11000 Volts grade, 50 Hz, with 9 insulator of rating upto 200 Amps including taking down existing GOD complete and removing from SSRte complete all as specified and as directed.
19Cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections ( flat, angle, channel) including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of aluminium paint complete all as specified.
20Anti-climbing device; spikes type fabricated out of M.S. bars (round, square and flat) including nuts, bolts, washers and welding in two halves made to shape to suit the cross section of the pole complete all as specified and directed.
21Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other dicated situation for loop earthing etc. as required 25x4mm dia galvanised iron or steel wire complete all as specified and directed.
22Dismantling/ taking down serviceable/ unserviceable distribution transformer of capacity up to 750 KVA from the existing platform/2 Pole/4 Pole structure/RMU after isolation of power supply and transporting to civil workshop or shifting from one place to another place by crane for requisite repair /maintenance and taking back to site including refixing the transformer on its original position/location, restoration of power supply and testing on completion complete all as directed .
23M&L for opening the transformer from the top duly draining out the existing transformer oil from the transformer and keeping in a cleaned container for its re-use, taking out the complete core including winding of the transformer by lifting the same with the help of a suitable lifting equipment/machine, cleaning the transformer tank thoroughly with suitable cleaning agent after removing foreign materials, carry out the requisite repair/maint/servicing of the transformer for its smooth functioning including replacement of following unsv parts, reassembling the transformer in all respects, refilling of the transformer oil, reassembling the transformer and testing on completion of following capacities:-Di-Electric strength of Transformer oil before and after filteration should be measured and kept in record Complete all as specified and directed.Note :- Replacement of unsv parts/spares and dehydration of transformer oil before refilling shall be measured and paid for separately under relevant items of the schedule here-in-after.
24HT 11 KV/433 V 63 KVA to 80 KVA of any make and type
25HT 11 KV/433 V 100 KVA to 200 KVA of any make and type
26HT 11 KV/433 V 220 KVA to 750 KVA of any make and type
27Supply and fixing in replacement of blue colour silica gel breather assembly transparent type with first fill of silica gel up to 750 KVA transformers as per the requirement of site as directed, complete & connecting with proper rubberized gasket including taking down existing UNSV one complete all as specified and directed.
28Supply and fixing in replacement of blue colour silica gel in breathers of existing transformers all as specified.[Note: The silica gel shall be brought in air tight container]
29Supply and fixing in replacement of LV side gun metal/brass threaded studs of rating 1.1 KV, suitable for Transformer of Capacity up to 750 KVA of any size and length including porcelain bushing, metal rings, bolts, washers, rubber rings, etc., complete all as specified and directed suitable for indoor/outdoor type, step down transformers of any make/model complete all as specified and directed.
30Supply and fixing in replacement of HV side gun metal/brass threaded studs of rating 11 KV, suitable for Transformer of Capacity up to 750 KVA of any size and length including porcelain bushing, metal rings, bolts, washers, rubber rings, etc., complete all as specified and directed suitable for indoor/outdoor type, step down transformers of any make/model complete all as specified and directed.
31Supply and fixing in replacement of top cover gasket rubberized cork sheet 6mm thick of suitable size for transformer of 11KV/ 433 volts, up to 750KVA capacity by opening top cover of the transformer etc. including taking down old unserviceable gasket complete all as directed by Engineer-in-Charge.
32Supply and fixing in replacement of gun metal drain valve for transformer of capacity up to 750 KVA complete all as specified and directed.
33Supply and fixing in replacement of HT off load Tap changing switch for transformer of capacity up to 750 KVA as per existing type/size/make complete all as specified and directed.
34Supply and fixing in replacement of temperature gauge for transformer of capacity up to 750 KVA as per existing type/size/make complete all as specified and directed.
35Supply and fixing in replacement of Buchholz Relay suitable for transformer of capacity up to 750 KVA, 11KV/433 V as per existing type/size/make complete all as specified and directed.
36M&L for on line centrifuging (filtration/ dehydration) of transformer oil including checking di-electric strength of oil before and after filtration for transformers located in various locations of AGE E/M-II Area with suitable portable machine having filtration, heating and pumping facility to improve the dielectric strength/ insulation value of Transformer oil.Notes :- (i) Di-electric strength of oil after filtration/ dehydration shall not be less than 60 KV/min.(ii) The contactor shall take shut down orders in writing from Engineer-in-charge before commencement of the work.(iii) The contractor shall ensure no wastage of transformer oil. (iv) The di-electric strength of oil shall be tested before & after filtration and test results shall be submitted to Engineer-in-Charge. (v) Machine will be provided by the department.
37Supply and filling new transformer oil for topping up the transformers duly initially filtered having dielectric strength not less than 60 KV complete all as specified and as directed. Note :-(a) The transformer oil shall be EHV type confirming to IS - 335/1983.(b) Mineral oil grade shall be used.(c) The IR value of transformer oil shall not be less than 60KV/min.(d) The unit rate shall be deemed to include the cost of filtration to achieve desired di-electric strength before filling.
38Disconnecting HT supply and taking out defective trolley of VCB HT 11KV, up to 1000 Amps of any make ad type and servicing of trolley of VCB by cleaning isolating contacts moving parts removing dust particles from bus bar chamber spout gear mechanism and moving parts, repair to motor charge spring mechanism tightening of nut & bolts of entire trolley components and replacement of all unserviceable spares as required and all as directed, inserting in trolley, testing commissioning and putting on the supply on load complete all as directed by the Engr-in-charge.Note: - (i) Servicing/repairs will be carried out by OEM's authorised dealer only. (ii) Spares as required for replacement will be of the same company as of existing make or as recommended by the OEM (iii) Cost of spares will be measured and paid separately under relevant items.
39Supply and fix in replacement of mechanical Castle interlock assembly with Key suitable for HT 11KV VCB of rating up to 1000 Amps as per existing make and model complete all as specified and as directed.
40Supply and fix in replacement of Closing coil assembly 24 Volts DC as per existing make and model complete all as specified and as directed.
41Supply and fix in replacement of tripping coil assembly 24 Volts DC as per existing make and modelcomplete all as specified and as directed.
42Supply and fix in replacement of fixed contact block complete suitable for up to 1000 Amps, 11 KV HT VCB as per existing make and model complete all as specified and as directed.
43Supply and fix in replacement of LED indicator lamp suitable for operating at 110 V AC for RYB as per existing make and model complete all as specified and as directed.
44Supply and fix in replacement of HT 11KV PT HRC fuse AVT type 0.5 to 6 Amp and 2.5 KV to 36 KV as per existing make and model complete all as specified and as directed.
45Supply and fix in replacement of moving contact block complete as per existing make and model up to 1000 amps 11KV complete all as directed.
46Supply and fix in replacement of vacuum interrupter type (4 inch dia) suitable for HT VCB 11KV up to 1000 Amps as per existing make and model complete all as specified and as directed.
47Supply and fix in replacement of battery bank for VCB panel as per exiting make and model complete all as specified and directed.
48Supply and fix in replacement of tripping push button suitable for HT 11KV VCB up to 1000 Amps as per existing make and model complete all as specified and as directed.
49Supply and fix in replacement of limit switch suitable for HT 11KV VCB up to 1000 Amps as per existing make and model complete all as specified and as directed.
50Supply and fix in replacement of charging motor button suitable for HT 11KV VCB up to 1000 Amps as per existing make and complete all as specified and as directed.
51Supply and fix in replacement of pole assembly suitable for HT 11KV VCB up to 1000 Amps as per existing make and model complete all as specified and as directed.
52Supply & fix in renewal of current transformer resin cast copper wound double tapping/dual correct 400/200/5 Amp HT 11/33 KV having connectors for internal wiring with 15VA burden class complete all as specified and as directed.
53Material and labour for checking the any type of fault , and other breakdown related to HT line/VCB/RMU and power house ,Rectify the fault at own arrangement complete with proper testing and commissioning of HT line with all spare and parts such as nut ,bolts,disc and pin insulator,streching of conductor and all other essential accessories as required for fault rectification Complete all as specified and directed. Note:- (a) Spares will be measured and paid separately under relevant items.(b) The break down complaint should be attended within 1 hours with the intimation of Engr-in-charge or concern JE E/M by telephonically / verbally.(c) Not attended of complaint after one hours will lead to recovery from subsequent payment in the following manner :-(iii) Not attending within 2 to 4 Hours- Rs. 2000.00 (iv) Not attending within 5 to 8 Hours- Rs. 4000.00(v) Not attending after 8 Hours - Rs. 10,000.00(vi) The maximum recovery will be Rs. 50,000.00 plus the expenditure incurred for rectification of the same by any other means.
54M&L for cutting/boring the existing bitumen us road/payment/footpath upto 0.75 mtr in depth, 0.45 mtr in width and getting out excavated material and making good the damaged portion after laying the pipe, returning filling in mass concrete PCC 1:2:4 type B2 upto top for footpath and pre mix ready mix road repair patching compound for instant road repair, manufactured with a blend of bitumen , aggregate and heigh grade polymer to ensure immediate bonding with existing surface for road cutting complete all as specified and directed. Note :-(i) M&L for laying of pipe shall be measured and paid separately.
55Supply, laying and testing HT cable XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured, electric power cables (Heavy duty) with stranded aluminium conductor, 11000 volts grade (earthed) cross sectional area 95 Sqmm 3 core, laid in trenches, through pipe in road crossing, ducts, fixed along poles complete all as specified and directed.
56All as per Item No.54 here-in before above but cable of size 3 core 120 sqmm suitable for 11 KV complete all as specified and directed.
57All as per Item No.54 here-in before above but cable of size 3 core 150 sqmm suitable for 11 KV complete all as specified and directed.
58All as per Item No.54 here-in before above but cable of size 3 core 185 sqmm suitable for 11 KV complete all as specified and directed.
59M&L for Earthing complete with galvanized steel earth plate electrode 60cm x 60cm x 6mm thick, buried directly in ground (earth pit not less than 2.25m deep below ground level) with top edge of earth plate not less than 1.5m below normal ground level, connected to galvanized earth strip of 25x4mm size by means of bolts, nuts, check nuts and washers of galvanized iron or steel and connected from earth plate electrode to main switch board/ earthing test point including watering arrangement with 20 mm GI pipe medium grade,40 mm GI pipe light grade for earth strip protection, PCC 1:3:6 type C1 chamber, MS funnel, wire gauge, 50mm thick precast RCC cover in Type B1, including necessary excavation in any type of soil, returning, filling in, removal of surplus soil to a distance n.exc 50m, charcoal and salt complete all as shown in electrical plate No. 3 of Schedule Part-I 2009 and connected to earthing test point all as specified or indicated and testing on completion.Note :- Contractor Shall provide earth pit chamber board of 3.15mm thick mild steel sheet of size 45cmX30cm fixed with12mm thick MS rod two nos up to 90 cm height by nuts/bolts including spray painting with two coats of synthetic enamel black paint complete MS sheet both side including writing letters 6cm height i.e Eart pit No, Location, Earthing test Value and date complete all as directed
60S & F HT 11000 volts Danger notice plate of size 20cm x 15cm made of 1.6mm thick mild steel plate, vitreous enamelled white, with letters, figures and conventional skull and bones in signal red colour and fixed with MS clamps, bolts and nuts of approved size complete all as specified and directed.
61Cable jointing kit for 11 KV (Earthed) grade cable for end termination heat shrink type joint indoor type complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 to 120 sqmm, complete all as specified and directed.
62Cable jointing kit for 11 KV (Earthed) grade cable for end termination heat shrink type joint outdoor type complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 to 120 sqmm, complete all as specified and directed.
63Cable jointing kit for 11 KV (Earthed) grade cable for end termination heat shrink type joint indoor type complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 150/185/240 sqmm, complete all as specified and directed.
64Cable jointing kit for 11 KV (Earthed) grade cable for end termination heat shrink type joint outdoor type complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 150/185/240 sqmm, complete all as specified and directed.
65Cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of 150/180/240 sqmm. complete all as specified and directed.
66Cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 to 120 sqmm. complete all as specified and directed.
67Excavating in trenches, n exc 1.5 m wide and n.exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, and for laying of cable or pipes etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in any type of soil, complete all as specified and as directed.
68Excavating in trenches, exc 1.5 m wide and n.exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, and for laying of cable or pipes etc. n exc 10 sq m on plan and n exc 3 m in depth and getting out in any type of soil, complete all as specified and as directed.
69Returning, filling in, including spreading, leveling, watering and well ramming in layer not exceeding 25cm thick each complete all as specified and directed.
70Removing excavated soil to a distance not exceeding 50 meter and depositing where directed at a level not exceeding 1.50 meter above the starting point complete all as specified and directed.
71GI tubing light grade 100mm bore along the wall/in trenches/in duct/in culvert/road crossing and including provisioning of suitable mild steel flat iron clamps and bolts, nuts and double washers etc for holding of GI pipe alongwith poles complete all as specified and as directed.
72Supply and fix in replacement 11 Mtr long steel tubular pole type 410 SP-55 complete with cast iron base plate, finial taper plug, bolts , nuts & screws etc including taking out old Steel/ RCC pole complete all as specified & directed Note : a) Necessary excavation , foundation and coping shall be measured and paid separately.
73M & L PCC 1:4:8 type D2 using 40 mm graded stone aggregate as in foundation of poles complete all as specified and as directed.
74M & L PCC 1:3:6 type C2 using 40 mm graded stone aggregate as in coping ect. for poles complete all as specified and as directed
75M&L for rewinding of LV/ HV coils (i.e. Primary/ secondary coils) of any size and type of 11 KV transformer of capacity 63 to 315 KVA including cleaning the burnt out insulating material, brazing and rewinding with appropriate turns and size of super enamelled copper winding strip including filling insulating paper, etc., varnishing the winding with synthetic varnish including heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at desired temperature to obtain required value of insulation resistance etc. complete all as specified and as directed.Notes: (i) The unit rate quoted shall be inclusive of varnish sleeving of insulating material, taking down the clamps, upper channels and core & HT links and re-clamping, positioning with separators, brazing etc. complete.(ii) Weight of copper coil only shall be considered for payment.(iii) Rate quoted shall be inclusive of disconnecting the transformer, transportation of transformer to work shop and back to site, reconnecting , charging the transformer and Testing complete.
76M&L for rewinding of LV/ HV coils (i.e. Primary/ secondary coils) of any size and type of 11 KV transformer of capacity 400 to 500 KVA including cleaning the burnt out insulating material, brazing and rewinding with appropriate turns and size of super enamelled copper winding strip including filling insulating paper, etc., varnishing the winding with synthetic varnish including heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at desired temperature to obtain required value of insulation resistance etc. complete all as specified and as directed. Notes: (i) The unit rate quoted shall be inclusive of varnish sleeving of insulating material, taking down the clamps, upper channels and core & HT links and re-clamping, positioning with separators, brazing etc. complete.(ii) Weight of copper coil only shall be considered for payment.(iii) Rate quoted shall be inclusive of disconnecting the transformer, transportation of transformer to work shop and back to site, reconnecting , charging the transformer and Testing complete.
77M&L for rewinding of LV/ HV coils (i.e. Primary/ secondary coils) of any size and type of 11 KV transformer of capacity 500 to 750 KVA including cleaning the burnt out insulating material, brazing and rewinding with appropriate turns and size of super enamelled copper winding strip including filling insulating paper, etc., varnishing the winding with synthetic varnish including heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at desired temperature to obtain required value of insulation resistance etc. complete all as specified and as directed. Notes: (i) The unit rate quoted shall be inclusive of varnish sleeving of insulating material, taking down the clamps, upper channels and core & HT links and re-clamping, positioning with separators, brazing etc. complete.(ii) Weight of copper coil only shall be considered for payment.(iii) Rate quoted shall be inclusive of disconnecting the transformer, transportation of transformer to work shop and back to site, reconnecting , charging the transformer and Testing complete.
78Supply and laying in replacement of DWC HDPE pipe ISI marked of size 180mm (OD) x 152mm (ID) along with connected accessories like couplers, bends, end caps etc in trenches or in cable ducts for UG cable protection all as specified and as directed.
79Material and labour for Service /repair of two pole/4 pole structure including replacement of U/S ACSR loop joints/Jumpers and Carry out routine maint.in Switch Triple pole 11000V mechanically operated mounted on insulator and steel frame with operating mechanism worked from ground level for current rating 200A/400A and applying petroleum jelly/greasing on moving parts, testing & complete all as specified and irected at site.
80M&L for preparation of old painted steel surfaces of 4 pole structure of approximate height 9.00m, consisting of 3 Nos GODs including brackets, clamps, channels and cross arms by cleaning of oils, lubricants, grease etc. complete above PCC coping and applying two coats of aluminium paint on surfaces 1m above PCC coping, applying two coats of synthetic enamel paint in zebra pattern with black & yellow colour combination up to 1m height above PCC coping; writing MES No. of poles (Number size shall be 25mm and lettering shall be 40mm) complete including applying two coats of white wash on exposed concrete surfaces of coping to poles duly preparing the surfaces all as directed.
81All as per item No- 79 above herein before but for two pole structure complete all as directed.
82Preparing surfaces of steel tubular swaged pole 11 Mtr long with scraping out old paint by emmery paper, castic soda complete and painting with two coats of aluminium paint over a red oxide primer and writing the No of poles and feeder name complete all as specified and directed by Engr-in-Charge and stripping with black paint & yellow paint (300 mm each stripe) 5 Nos at equal distance from bottom (above PCC coping) upto a height of 1500 mm complete all as specified and as directed.
83M&L for spray painting with Silicon acrylic heat resistant paint of approved quality & colour to indoor/outdoor type, step up/step down transformer of up to 750 KVA capacity, installed at different locations under AoR of CPH Area after thoroughly scraping the existing corroded paint/rust, filling of cavities complete including writing the details such as SM/MES No. all as specified and as directed.
84Material and labour for Cutting/ removing bushes, vegetation levelling the area around E/M installation such as sub stations, 4/2 pole structure etc. including surface excavation not exceeding 30cm deep and averaging 15cm deep and averaging 15cm deep and getting out roots, jungles etc. throw away not less than 50 mtr from the site and making good all as specified and as directed.
85Material and labour taking shut down from Main MRS for Cutting the .branches of tree on 33 KV over head line from Comd Sub Station to Main MRS ( Approx- 3.5KM), removing the branches from the over head line complete all as specified and as directed.Note :- (a) Contractor provide necessary T&P such as ladder , hydra vehicle etc for cutting branches of tree is deemed to be included in the quoted rate of the items.(b) Contractors are advised to visit the site before quoting the rate.
86Material and labour for Calibration of relays, setting the relays for the fault levels Earth fault relay /Over current relay( Electro Mechanical) as directed and testing the operation of Vacuum circuit breaker after installation of relays by simulating different types of faults complete all as specified and directed.
87M&L for repairing of Transformer cooling fins, drain out Transformer Oil and find out the leakage position cleaning scraping, breaking/welding of the cooling fins refiling of Transformer Oil including de-hydration and testing complete all as specified and as directed.
88M&L for repair/replacement of Transformer HT side cover plate,disconect the electric supply, cutting welding and drilling hole as per suitable size/thickness of sheets including nut, bolts and washer etc complete all as specified and as directed.
89Supply and fix in replacement of SRBP fuse element suitable for 11 KV, 30 Amps to 70 Amps complete all as specified and directed.
90Supply and fix in replacement of SRBP fuse element suitable for 11 KV, 80 Amps to 200 Amps complete all as specified and directed.
91Disconnecting HT supply and taking out defective trolley of Ring man unit/ SF 6 breaker, outdoor/ indoor type of any size and capacity , HT 11 KV, up to 1000 Amps of any make and type, servicing of trolley of Ring man unit/ SF 6 breaker by cleaning isolating contacts moving parts removing dust particles from bus bar chamber spout gear mechanism and moving parts, repair to motor charge spring mechanism tightening of nut & bolts of entire trolley components and replacement of all unserviceable spares as required and all as directed, inserting in trolley, testing commissioning and putting on the supply on load complete all as directed by the Engr-in-charge.Note: - (i) Servicing/repairs will be carried out by OEM's authorised dealer only. (ii) Spares as required for replacement will be of the same company as of existing make or as recommended by the OEM (iii) Cost of spares will be measured and paid separately under relevant items.
92Supply and fix in replacement of Trip/Closing Coil Assembly for 11 kV SF₆ breakerRMU rating up to 1000 Amps as per existing make and model complete all as directed .
93Supply and fix in replacement of Fixed/Moving Contact Set (11 kV – ~3200 A) for 11 kV SF₆ breaker/RMU as per existing make and model complete all as directed.
94Supply and fix in replacement of Closing Coil for HT Breaker (11 kV) for 11 kV SF₆ breaker/RMU as per existing make and model complete all as directed.
95Supply and fix in replacement of 11 kV Drop out Fuse (Pole/Line Fitting) for 11 kV SF₆ breaker/RMU as per existing make and model and directed.
96Supply and fix in replacement of 11 kV 200 A Polymeric DO Fuse set for 11 kV SF₆ breaker/RMU as per existing make and model and directed.
97Supply and fix in replacement of gas-bank unit (comprising tank, valves, regulators, charging system) for 11 kV SF₆ breaker/ RMU as per existing make and model complete all as specified and directed.
98Supply and fix in replacement of gas-bank unit Kit for 11 kV SF₆ breaker/RMU as per existing make and model complete all as specified and directed.
99Supply and fix in replacement of Rubber matting as per ISI mark 1 mtr x 2 mtr x 19 mm for HT breaker at substation complete all as specified and directed.
100Material and labour for Providing and applying approved chemical herbicide spray for removal/control of grass, weeds, and unwanted vegetation around Two Pole / Four Pole transformer areas, using suitable spray pump, including cost of material, labour, tools & tackles, safety precautions, and complete as per specifications and as directed.
101M&L for Aluminium conductor steel reinforced (ACSR) on overhead electric lines and stretching the same with required span sag and binding the conductor with pin/shackle insulator and jumpers with aluminium binding wire not less than 2.00 mm dia complete all as specified and directed for any Size.
102M&L for supply and fix in replacement of 11 KV Self-amalgamating (self-fusing) EPR / Rubber type HT tape ,0.5 mm to 0.8 mm thick,38 mm / 50 mm width , 9 to 10 Mtr length complete all as specified and directed.
103Supply and fix in replacement of Copper busbar of current carrying capacity 1000 Amps with 30CM length for fixing of LV busing of transformer capacity up to 750 KVA complete all as directed.
104Supply and fix in replacement of 11 kV electrical insulating hand gloves for right hand and left hand , made of high-grade natural rubber, seamless construction, suitable for live electrical working and HT maintenance, conforming to IS 4770:1991 / IEC 60903, having good dielectric strength, resistant to moisture, ozone and weather, complete all as specified and directed.
105Supply and fix in replacement of HT aluminium cable lugs, suitable for termination of 11 kV grade aluminium conductor cables of size 95 Sqmm to 185 Sqmm , heavy-duty compression type, complete with crimping, cleaning, and proper jointing, including all accessories as required, complete all as specified and directed. Total in Figures 0.0 0.0 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55830928
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 1 Crore
LAST DATE 13-07-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repair/ Maintenance To 11Kv Ht Lines, Transformers, Gods, Poles With Allied Works In Aor Of Cph And Other Locations Under Ge (Utilities) Udh Ur
Basic Detail
Tender No CWE/U(U)-27/2026-27
Bidding Type Tender
Location
City Udhampur
State Jammu And Kashmir
Key Dates
Publish Date 06 Jul 2026
Submission Date 13 Jul 2026
Open Date 15 Jul 2026
Finance
Tender Value 1 Crore
Tender Fee 1000
EMD 1.75 Lakhs
Exemption Not Available
Document List
83efaba3-dcb3-4416-9a5a-83daf40fecb5.html
BOQ_862069.xls
Tenderdocuments.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 06, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 06, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 13, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 1 day
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Jul 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

83efaba3-dcb3-4416-9a5a-83daf40fecb5.html

xls

BOQ_862069.xls

pdf

Tenderdocuments.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders