| 1 | Dismentaling of R.C.C.work including stacking of dismental material with all charges etc complete. |
| 2 | Dismentaling of Brick work in cement Mortar including stacking of dismental material with all charges etc complete. |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. |
| 4 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. |
| 5 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. |
| 6 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. |
| 7 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. |
| 8 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. |
| 9 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. |
| 10 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. |
| 11 | Earth work in making aproch road in all type of soil i/c all lead lift labour. |
| 12 | Earth work in removing road diversion in all type of soil i/c all lead lift labour. |
| 13 | Supply and fixing of PVC Pipe 75 mm dia 4 kg pressure ISI mark for Drainage spout and weep hole including cost of all material ,labour, t&p etc. required for proper completion of work. |
| 14 | Supply and Fixing of 20 MM Thick Joint filler board including cost of all material ,labour, t&p etc. required for proper completion of work. |
| 15 | Painting work including cost of all material ,labour,and t&P etc complete. |
| 16 | Laying P.C.C. work in M-15 with coarse sand FM.>2 and Brick Ballast size 25 mm to 40 mm. for U/S & D/S in canal including all cost of materials,T&P and labour etc complete. Please Enable Macros to View BoQ information |